SCORE

DC WATER OWNER: CARLTON RAY POC CHRIS GERBER; LEE LUCAS AECOM

ABOUT DC WATER OWNER: CARLTON RAY POC CHRIS GERBER; LEE LUCAS AECOM

Dc Water Owner: Carlton Ray Poc Chris Gerber; Lee Lucas Aecom specializes in:

Dc Water Owner: Carlton Ray Poc Chris Gerber; Lee Lucas Aecom offers services:

Based on the information received from , associated with Dc Water Owner: Carlton Ray Poc Chris Gerber; Lee Lucas Aecom over the past .

If you are considering hiring Dc Water Owner: Carlton Ray Poc Chris Gerber; Lee Lucas Aecom for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Dc Water Owner: Carlton Ray Poc Chris Gerber; Lee Lucas Aecom has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
56
7 Rhode Island Ave Ne, Washington, Dc 20018
Dccr proposes to drill one monitoring well nebbc-71 located at 7 rhode island avenue ne. The boring will be 8 inches diameter and 165 feet bgs, drilled by mud rotary methods. A monitoring well will be installed at 12 feet bgs and a vibrating wire piezometer installed at 1 feet bgs. All drilling generated waste will be drummed, tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. No drilling spoils or excavated soils will be used as backfill. See idw management plan and attached schematics for additional information.

Client: Dc Water Owner: Carlton Ray, Poc Chris Gerber | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600304
2016/07/270567 Rhode Island Ave Ne, Washington, Dc 20018Dc Water Owner: Carlton Ray Poc Chris Gerber; Lee Lucas Aecom
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.