Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 98 Lexington Ave Cambridge, Ma We will be gutting the interior of the 3rd floor guest bath complete to studs and joists. No change to wall and door locations or windows. We will install new sub-floor, sheet rock, tile backer board and finishes and fixtures. The location of toilet and sink vanity will switch. Tub will remain in same location but will have drain on opposite side. We will replace any poor or non existent insulation in exterior wall with spray foam insulation. Existing andersen insulated glass awning window will be replaced by a replacement unit or just a new sash. Permit type: Addition/alteration | Completion date: March 19, 2013 | Current use: Two-family | Parcel: 247103 |