Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 1 Gurney St Mission Hill Ma Welding of elevator guide rail brackets which attach to the elevator guide rails. These brackets will be welded to the building support steel for all of the elevators which includes bent plate at the floor slabs horizontal tube steel divider beams and vertical tube steel in the elevator hoistways (dpl) bfd paid detail required Date: May 24, 2017 Contractor: Dave Gannon Client: Mass Bay Transp Auth | Permit type: Bfd cutting-burning-welding | Permit id: Cbw711230 | Parcel: 0902911000 | |||||
SCORE 61 13461352 Boylston S Boston Ma Welding of elevator guide rail brackets which attach to the elevator guide rails. Which includes bent plate at the floor slabs horizontal tube steel divider beams and vertical tube steel in the elevator hoistways dpl 6 6 17 bfd paid detail required Date: March 13, 2017 Contractor: Dave Gannon Client: Skpr 13 Boylston Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw682820 | Parcel: 0504313000 | |||||
SCORE 61 17 Dalton St Boston Ma Welding of elev. Guide rail brackets which attach to the elev. Guide rails. These brackets will be welded to the building support steel for all of the elevators for this project which includes bent plate at the floor slabs embedded plates hor. Tube steel divider beams and vts (dpl 11 15 18) Date: July 18, 2017 Contractor: Dave Gannon Client: Church Realty Trust | Permit type: Bfd cutting-burning-welding | Permit id: Cbw728589 | Parcel: 0401150000 |