Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 1417 N 18th St Philadelphia Pa 191214210 Install (3) 60. 0 btu 90% heater-1st flr bsmt. 2nd & 3re dlr in mechanical rms ductwork & a c condensers in yd. All ductwork will remain in each unit. Date: September 24, 2010 Contractor: Daniel Tabb Client: Campbell Thomas | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 31, 2011 | Permit id: 302913 | |||||
SCORE 96 1953 N 18th St Philadelphia Pa 191213331 Install (1) 60,000. Gibson 0 furnace with a c and duct work. Condenser in yard. Date: January 14, 2011 Contractor: Daniel Tabb Client: Njf Management Company Ll | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2012 | Permit id: 320821 | |||||
SCORE 96 5899 Lancaster Ave Philadelphia Pa 191313444 Install (5) direct vent warm air furnaces for tenant spaces and common area Date: November 20, 2008 Contractor: Daniel Tabb Client: Emerald Housing Resources | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 15, 2009 | Permit id: 189189 | |||||
SCORE 96 2425 Grays Ferry Ave Philadelphia Pa 191462450 Installation of direct air furnace with air and related duct work. Date: February 22, 2007 Contractor: Daniel Tabb Client: Btuse L P | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 27, 2007 | Permit id: 57920 | |||||
SCORE 96 Date: August 3, 2010 Contractor: Daniel Tabb Client: Conic Realty Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 2, 2013 | Permit id: 294181 | |||||
SCORE 96 1422 Dondill Pl Philadelphia Pa 191223306 Install (1) goodman gas heater in 1st-floor utility room,70,0 btus @90%,tied in with existing duct-work,including 2. 5 ton a c,condenser set in rear yard. Date: August 25, 2009 Contractor: Daniel Tabb Client: Threadgill Jean W | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 3, 2009 | Permit id: 233822 | |||||
SCORE 96 1703 W Montgomery Ave Philadelphia Pa 191213226 Install two goodman gp045 450 btu gas fired not air furnace two 30 btu a c coil install two 240 btu outdoor condensing unit install all new work and supply vent to do 1st,2nd,& 3rd flr. Date: September 28, 2010 Contractor: Daniel Tabb Permit type: Mechanical permit | Permit status: Completed | Completion date: July 26, 2013 | Permit id: 301685 | |||||
SCORE 96 2522 Poplar St Philadelphia Pa 191301319 Install two direct vent warm air furnaces with air and related duct work in a single family dwelling Date: December 13, 2007 Contractor: Daniel Tabb Client: Morgan Elizabeth | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2008 | Permit id: 121403 | |||||
SCORE 96 Date: March 26, 2009 Contractor: Daniel Tabb Client: Yoo In P Yoo Hak S | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 2, 2009 | Permit id: 201051 | |||||
SCORE 96 23 E Norris St Philadelphia Pa 191251929 First floor: install (1) 120,0 btu payne warm air furnace a c and all associated ductwork, condenser in yard. Second floor: install (1) 40,0 btu 90% payne warm air furnace with a c and all associated ductwork, condenser on roof. Third floor: install (1) 40,0 btu 90% payne warm air furnace with a c and all associated ductwork, condenser on roof. Date: April 26, 2011 Contractor: Daniel Tabb Client: Nnelly Michael Mulgrew Karen A | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 14, 2011 | Permit id: 334755 | |||||
SCORE 96 2211 W Tioga St Philadelphia Pa 191403806 Installation of 4 warm air direct vent furnaces and 2 electric heating systems with related duct work in 6 apartments. Date: July 11, 2007 Contractor: Daniel Tabb Client: Wizard Realty Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 4, 2008 | Permit id: 88613 | |||||
SCORE 96 415 S Van Pelt St Philadelphia Pa 191461232 Installation of (1) gibson 90% 80,0 btu warm air furnace with a c and all associated ductwork. Condenser in yard. Each unit installed separately within each dwelling unit. No penetrations permitted. Date: April 13, 2011 Contractor: Daniel Tabb Permit type: Mechanical permit | Permit status: Completed | Completion date: January 11, 2012 | Permit id: 334751 | |||||
SCORE 96 1913 Webster St Philadelphia Pa 191461827 Direct vent warm air furnace with air and related duct work. Date: January 23, 2007 Contractor: Daniel Tabb Client: Lee Yiu Tanguy Martine | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 24, 2007 | Permit id: 51808 | |||||
SCORE 96 1353 E Susquehanna Ave Philadelphia Pa 191252840 Installation of ductwork only for existing oil-fired warm air furnace in single family dwelling. Date: March 14, 2011 Contractor: Daniel Tabb Client: Tkaczyk Michael A Tkaczyk Marie | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 1, 2011 | Permit id: 329707 | |||||
SCORE 96 Date: August 3, 2010 Contractor: Daniel Tabb Client: Winfield Robert J | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 7, 2012 | Permit id: 294179 | |||||
SCORE 96 1 Wolf St Philadelphia Pa 191483343 Installation of (1) 90% 100,0 btu furnace with ductwork and a c condenser in yard. Date: February 24, 2011 Contractor: Daniel Tabb Client: Marvel Stephen Marvel Kerry | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 19, 2011 | Permit id: 326634 | |||||
SCORE 96 Date: August 3, 2010 Contractor: Daniel Tabb Client: Stuhl James E Stuhl Jamie L | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 27, 2011 | Permit id: 294194 | |||||
SCORE 96 1919 Wharton St Philadelphia Pa 191462931 Install direct vent warm air 2 60,0 btu furnaces,1 basement,1 second fl,two condensers on roof . Date: January 12, 2010 Contractor: Daniel Tabb Client: Gray Andrew B Gray Kathleen Murphy | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 20, 2010 | Permit id: 255466 | |||||
SCORE 96 769 S 6th St Philadelphia Pa 191473037 Unit 1- 60,0 btu furnace with a c and ductwork. Unit 2- 60,0 btu furnace package on roof. Date: July 1, 2010 Contractor: Daniel Tabb Client: Kadish Andrew S Clark-Kardish Vicki L | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 288898 | |||||
SCORE 96 4455 N 6th St Philadelphia Pa 191402319 Install (3) gas fired rooftop packaged units w air and related duct work. Date: November 30, 2009 Contractor: Daniel Tabb Client: Sixth Street Management C | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 11, 2010 | Permit id: 250396 | |||||
SCORE 96 Date: July 24, 2013 Contractor: Daniel Tabb Client: Jerome Deneica A Liverpoo | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 5, 2013 | Permit id: 485057 | |||||
SCORE 96 Date: May 7, 2010 Contractor: Daniel Tabb Client: Mathew Tyson Mathew Geetha | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 30, 2010 | Permit id: 277898 | |||||
SCORE 96 2052 Sansom St Philadelphia Pa 191034417 Install one goodman 95% 45 btu gas fired furnace one 240 btu air cond ductwork included on this permit. Date: September 16, 2010 Contractor: Daniel Tabb Client: Savery Carney C | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 1, 2011 | Permit id: 298661 | |||||
SCORE 96 1027 S 7th St Philadelphia Pa 191474835 Install direct vent 100,0 btu 90% warm air furnace with related duct work in basement. Date: February 1, 2010 Contractor: Daniel Tabb Client: Corry Jennifer L | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 4, 2010 | Permit id: 259749 | |||||
SCORE 96 82329 N 3rd St Philadelphia Pa 191232200 Installation of electric heat strip with a c and related duct work. Date: July 31, 2007 Contractor: Daniel Tabb Client: King Ray | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 15, 2008 | Permit id: 92085 | |||||
SCORE 96 Date: September 23, 2008 Contractor: Daniel Tabb Client: Aliga Richard E Valiga Mary E | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 4, 2010 | Permit id: 178205 | |||||
SCORE 96 847 N 26th St Philadelphia Pa 191301823 Install (1)amanna 95% 90,0 btu furnace with ductwork, with a c in yrd Date: February 3, 2011 Contractor: Daniel Tabb Client: Flagg Kenneth J Horcha Penelope J | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 3, 2011 | Permit id: 323357 | |||||
SCORE 96 Date: May 5, 2010 Contractor: Daniel Tabb Client: Armstrong Christopher L | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 16, 2010 | Permit id: 277252 | |||||
SCORE 96 13 S 10th St Philadelphia Pa 191475619 Installation of two (2) direct vent warm air furnace with a c and related duct work. Date: June 11, 2007 Contractor: Daniel Tabb Client: Tfb-1338 Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 6, 2008 | Permit id: 82344 | |||||
SCORE 96 120913 S 28th St Philadelphia Pa 191463711 2 goodman 5 ton roof top . 100,0 btu and related duct work Date: July 17, 2008 Contractor: Daniel Tabb Client: Jmwd Holdings Inc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 13, 2008 | Permit id: 165055 | |||||
SCORE 96 9245 Grace Ln Philadelphia Pa 191152824 Install 3 goodman split systems, including a c and ductwork (sfd) Date: September 23, 2011 Contractor: Daniel Tabb Client: Urbanowski Jason Collier Stacey Marie | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 27, 2012 | Permit id: 364820 | |||||
SCORE 96 2226 Delancey Pl Philadelphia Pa 191036502 Install 120,0 btu gas fired 92% furnace. Install (4) supply vene with register. Date: June 22, 2011 Contractor: Daniel Tabb Client: Huntington Stephen N Susan M | Client Company: Nklin Huntington Hodge F | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 1, 2011 | Permit id: 348152 | |||||
SCORE 96 120315 N 3rd St Philadelphia Pa 191224432 Install direct vent warm air furnace with air and related duct work Date: August 31, 2009 Contractor: Daniel Tabb Permit type: Mechanical permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 234761 | |||||
SCORE 96 2362 E Harold St Philadelphia Pa 191252337 Install one durcane gas fired hot air furnace model 60,0 btu one 30,0 btu coil and one 30,0 btu outdoor condenser unit. Install all new duct work. Date: April 26, 2011 Contractor: Daniel Tabb Client: Harold Properties Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 27, 2012 | Permit id: 336837 | |||||
SCORE 96 1201 Mount Vernon St Philadelphia Pa 191233202 Install (1)60,0 btu gas heater & air conditng. Heater in bsmt.,condenser on roof. Date: April 26, 2011 Contractor: Daniel Tabb Permit type: Mechanical permit | Permit status: Completed | Completion date: August 12, 2011 | Permit id: 336841 | |||||
SCORE 96 1421 Creston St Philadelphia Pa 191493220 Install 1 goodman btu heater 90% with a c and duct work. A c rear yard Date: September 29, 2009 Contractor: Daniel Tabb Client: Rafeh Jenny | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 17, 2009 | Permit id: 239813 | |||||
SCORE 96 2515 W Oxford St Philadelphia Pa 191212838 90% furnace with ductwork with a c in yard gibson equipment. Date: September 20, 2011 Contractor: Daniel Tabb Client: Adams Jerome | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 10, 2012 | Permit id: 364168 | |||||
SCORE 96 2153 Montrose St Philadelphia Pa 191462527 Install (1) goodman 70,0 btu gas fired hot air furnace with duct work. Date: July 11, 2011 Contractor: Daniel Tabb Client: Mccreesh Charles | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 3, 2012 | Permit id: 351849 | |||||
SCORE 96 2414 Pine St Philadelphia Pa 191036417 Install direct vent warm air furnace with air and related duct work. Date: November 14, 2007 Contractor: Daniel Tabb Client: Ersek Mary Schellenberg Gerard David | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 7, 2008 | Permit id: 114733 | |||||
SCORE 96 2112 Catharine St Philadelphia Pa 191461208 Install one 75,0 btu 90% forced air heater ac unit in the basement of a three story sfd. Date: November 27, 2007 Contractor: Daniel Tabb Client: Boshnak Ahmed Y | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 4, 2007 | Permit id: 117905 | |||||
SCORE 96 2551 Trenton Ave Philadelphia Pa 191252246 Install 1 american standard 60btu furnace 90% with duct work, closet 1st fl condenser roof Date: September 29, 2009 Contractor: Daniel Tabb Client: Cabalar Steven H | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 239757 | |||||
SCORE 96 2425 Grays Ferry Ave Philadelphia Pa 191462450 Installation of direct vent furnaces (2) with air and related duct work. Date: February 22, 2007 Contractor: Daniel Tabb Client: Btuse L P | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 27, 2007 | Permit id: 57907 | |||||
SCORE 96 Date: February 9, 2011 Contractor: Daniel Tabb Client: Ugan Kevin Dugan Maria | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2011 | Permit id: 324315 | |||||
SCORE 96 1422 Christian St Philadelphia Pa 191462221 Installation of 3 electric air handlers with electric heating elements and air conditioning unit with all associated ductwork for 3 family dwelling. Date: December 1, 2010 Contractor: Daniel Tabb Client: Jeb Realty Associates Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 14, 2012 | Permit id: 314284 | |||||
SCORE 96 8000 Ditman St Philadelphia Pa 191364402 Installing 35 ge zoneline ptac units in apartments, stair enclosures, laudry room and the basement corridor. Basement corridor unit to be gas fired direct vent unit Date: August 6, 2008 Contractor: Daniel Tabb Client: Northeast Ii-Ditman Assoc | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 10, 2009 | Permit id: 167012 | |||||
SCORE 96 Date: August 3, 2010 Contractor: Daniel Tabb Client: Conic Realty Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 15, 2011 | Permit id: 294192 | |||||
SCORE 96 608 N 12th St Philadelphia Pa 191230000 Install 90,0 gas furnace in bsmt with air condition,condenser on roof. Date: May 26, 2011 Contractor: Daniel Tabb Client: Chen Sheng Xu Xingmei | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 12, 2011 | Permit id: 343199 | |||||
SCORE 96 2824 Jackson St Philadelphia Pa 191452427 Install duct work and new 500 btu heater and a c system 2nd floor. Condensor unit located on roof. Date: September 1, 2009 Contractor: Daniel Tabb Client: Mcdevitt Robert | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 24, 2009 | Permit id: 235015 | |||||
SCORE 96 13 Lombard St Philadelphia Pa 191471004 Install 3 - 60,0 btu with ac with duct work under 20 cfm per attached drawings Date: September 23, 2008 Contractor: Daniel Tabb Client: Estefano Donna J Destefano John | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 27, 2009 | Permit id: 178652 | |||||
SCORE 96 2838 S Mildred St Philadelphia Pa 191485062 Install (1) rudd 90% 80,0 btu furnace basement w duct work and a c in yard. Single family. Date: June 15, 2011 Contractor: Daniel Tabb Client: Simone Joseph A Greco Lisa | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 8, 2011 | Permit id: 347564 | |||||
SCORE 96 Date: August 3, 2010 Contractor: Daniel Tabb Client: Conic Realty Lp | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 15, 2011 | Permit id: 294188 | |||||
SCORE 96 2019 Dickinson St Philadelphia Pa 191464515 Replace gas hot air heater. Including a c,& related duct-work. Date: July 6, 2009 Contractor: Daniel Tabb Client: Rhodes Eugene Rhodes Kathy | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 24, 2009 | Permit id: 214827 | |||||
SCORE 96 2217 Coral St Philadelphia Pa 191251511 Install (1) ruud 1 1 2 ton air handler with a c in yard. No new ductwork Date: February 24, 2011 Contractor: Daniel Tabb Client: P & S Property Managementand Consulting Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2012 | Permit id: 326639 | |||||
SCORE 96 Date: August 11, 2008 Contractor: Daniel Tabb Client: Goodwin Angelo | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 20, 2009 | Permit id: 170252 | |||||
SCORE 96 816 Morris St Philadelphia Pa 191481206 Install all new duct work. Install one ducane 80% gas fired furnce. 70,0 btu, one a c unit 36,0 btu. Date: February 23, 2011 Contractor: Daniel Tabb Client: Koprak Julia Child Aaron | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 12, 2011 | Permit id: 326187 | |||||
SCORE 96 8044 Fairview St Philadelphia Pa 191362202 Install 1 gibson btu heater 90% basement 1st fl with a c and duct work. 2nd &3rd fl location closet 2nd fl 1 gibson btu heater 90% with a c and duct work condenser lcoation (side yard) Date: September 29, 2009 Contractor: Daniel Tabb Client: Farrell Mark | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 28, 2009 | Permit id: 239746 | |||||
SCORE 96 120315 N 3rd St Philadelphia Pa 191224432 60,0 btu 90% furnace with ductwork and a c 4ton gibson package on roof Date: July 1, 2010 Contractor: Daniel Tabb Client: Efino Cristi Defino Marni | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 16, 2014 | Permit id: 288907 | |||||
SCORE 96 2551 Trenton Ave Philadelphia Pa 191252246 Install one direct vent warm air furnace with air and related. Date: August 31, 2009 Contractor: Daniel Tabb Client: Leahy Michele A | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 31, 2010 | Permit id: 234759 | |||||
SCORE 96 1913 Ellsworth St Philadelphia Pa 191462803 Install (1) warm air furnace 900 btu direct vent system with 3t 0f air and related duct work Date: August 22, 2007 Contractor: Daniel Tabb Client: Coary Sean P | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 24, 2007 | Permit id: 98136 | |||||
SCORE 96 10 Dyre St Philadelphia Pa 191242524 Install direct vent heat & air conditioner with related duct work. Date: July 26, 2010 Contractor: Daniel Tabb Client: Sorlien Sarah Sorlien R Eric | Permit type: Mechanical permit | Permit status: Completed | Completion date: December 21, 2010 | Permit id: 292870 | |||||
SCORE 96 931 N Lawrence St Philadelphia Pa 191231439 Install (2) new rudd gas fired hot air furnaces with duct work. 1st flr 45,0 btu. 75,0 btu for 2nd and 3rd flr unit Date: June 1, 2010 Contractor: Daniel Tabb Client: Townsend Andrew P Townsend Tracey L | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 21, 2012 | Permit id: 282173 | |||||
SCORE 96 514 W Moyamensing Ave Philadelphia Pa 191483229 Duct work req. For heating & a c system. Supply & return 60,0 btus, 92% hot air furnace in bsmt. 2 1 2 conductor for a c in yard., Date: November 10, 2010 Contractor: Daniel Tabb Client: Satz Andrew K | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 23, 2011 | Permit id: 310743 | |||||
SCORE 96 Date: May 31, 2011 Contractor: Daniel Tabb Client: Harvey James Harvey Reiko | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 11, 2013 | Permit id: 343820 | |||||
SCORE 96 523 Budd St Philadelphia Pa 191042220 Install one goodman 70,0 btu warm air furnace w air and related duct work Date: January 8, 2007 Contractor: Daniel Tabb Client: Fogelson Skemp Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 9, 2007 | Permit id: 48549 | |||||
SCORE 96 521 Budd St Philadelphia Pa 191042220 Install one goodman warm air furnace 70,0 btu w air and related duct work Date: January 8, 2007 Contractor: Daniel Tabb Client: Fogelson Skemp Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 9, 2007 | Permit id: 48547 | |||||
SCORE 96 1428 Bainbridge St Philadelphia Pa 191462202 Installation of direct vent warm air furnace with air and related duct work. Date: March 26, 2007 Contractor: Daniel Tabb Client: Huggh Thomas B | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 29, 2008 | Permit id: 64502 | |||||
SCORE 96 1903 Carpenter St Philadelphia Pa 191462614 100,0 btu , 95% furance with duct work with a c , heater in basement , a c in yard Date: September 10, 2010 Contractor: Daniel Tabb Client: Binder-Scholl Gwendolyn Scholl Daniel W | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 12, 2011 | Permit id: 300476 | |||||
SCORE 96 1913 Fitzwater St Philadelphia Pa 191461817 Installing two direct vent warm air furances w air and related duct work Date: January 31, 2007 Contractor: Daniel Tabb Client: Messerly Trevor J | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 13, 2007 | Permit id: 53755 | |||||
SCORE 96 Date: August 1, 2008 Contractor: Daniel Tabb Client: Rowe Lee D Rowe Lauren | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 5, 2010 | Permit id: 168728 | |||||
SCORE 96 519 Budd St Philadelphia Pa 191042220 Install one goodman warm air furnace 70,0 w air and related duct work Date: January 8, 2007 Contractor: Daniel Tabb Client: Fogelson Skemp Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 9, 2007 | Permit id: 48544 | |||||
SCORE 96 1426 Bainbridge St Philadelphia Pa 191462202 Installation of direct vent warm air furnace with air and related duct work. Date: March 26, 2007 Contractor: Daniel Tabb Client: Alig Robert J Danet-Desnoyers Gwenn | Permit type: Mechanical permit | Permit status: Completed | Completion date: April 29, 2008 | Permit id: 64503 | |||||
SCORE 96 1906 Alter St Philadelphia Pa 191462802 Installation of (1) gibson 90% 80,0 btu warm air furnace with a c and all associated ductwork. Condenser in yard. Date: April 8, 2011 Contractor: Daniel Tabb Client: South Of Center L P | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 31, 2011 | Permit id: 334745 | |||||
SCORE 96 1522 Brown St Philadelphia Pa 191302906 Install warm air direct-vent furnaces with air and related duct work in 3 apartments in the building. Date: March 8, 2007 Contractor: Daniel Tabb Client: Adams Mark Fx | Permit type: Mechanical permit | Permit status: Completed | Completion date: July 16, 2007 | Permit id: 60758 | |||||
SCORE 96 Date: July 1, 2010 Contractor: Daniel Tabb Client: Caracciolo Paul | Permit type: Mechanical permit | Permit status: Completed | Completion date: February 8, 2011 | Permit id: 288911 | |||||
SCORE 96 Date: April 9, 2010 Contractor: Daniel Tabb Client: Tran Tim Trung | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 4, 2010 | Permit id: 267950 |