Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 16 35th Street Nw Washington Dc New curb cuts & curb cut removal as part of the duke ellington school of the arts renovation, the following public space work will be performed: r st, nw: the existing driveway will be closed and replaced with granite curb and gutter. Five street trees will be planted along the street to maintain a consistent tree canopy in this area. The existing loading zone in the parking lane will remain. An ada-compliant ramp will be created that connects to a walkway leading to the front of the school building. Parts of the poorly-maintained existing brick sidewalk will be replaced in kind as needed. A 1 foot student drop-off area will be created on the south side of r st. 36th st, nw: both of the schools driveway entrances will be on this street. The existing loading dock entrance will be relocated slightly to the south, where it will be a 24. 5 ft curb cut for access to the schools trash compactors. The existing 14 ft above-ground parking driveway will be closed. A new 18. 5 ft driveway will be c Client: Gcs, Inc | Permit type: Paving; ada curb ram | |||||
SCORE 64 16 35th Street Nw Washington Dc New curb cuts & curb cut removal as part of the duke ellington school of the arts renovation, the following public space work will be performed: r st, nw: the existing driveway will be closed and replaced with granite curb and gutter. Five street trees will be planted along the street to maintain a consistent tree canopy in this area. The existing loading zone in the parking lane will remain. An ada-compliant ramp will be created that connects to a walkway leading to the front of the school building. Parts of the poorly-maintained existing brick sidewalk will be replaced in kind as needed. A 1 foot student drop-off area will be created on the south side of r st. 36th st, nw: both of the schools driveway entrances will be on this street. The existing loading dock entrance will be relocated slightly to the south, where it will be a 24. 5 ft curb cut for access to the schools trash compactors. The existing 14 ft above-ground parking driveway will be closed. A new 18. 5 ft driveway will be c Date: March 23, 2015 Contractor: Dan Waldo Client: Gcs, Inc | Permit type: Paving; ada curb ramp, paving; driveway | Permit status: Assigned | Expiration date: May 27, 2016 | |||||
SCORE 64 16 35th Street Nw Washington Dc Paving; ada curb ramp, paving; driveway(s) close existing, paving; driveway(s) new- commercial, landscaping; new tree space(s), landscaping; tree planting, landscaping; tree removal, landscaping; tree space (stormwater mgmt), paving; leadwalk only Contractor: Dan Waldo Permit status: 12 | Expiration date: May 27, 2016 | Permit id: 0 | |||||
SCORE 64 16 35th Street Nw Washington Dc Paving; ada curb ramp, paving; driveway(s) close existing, paving; driveway(s) new- commercial, landscaping; new tree space(s), landscaping; tree planting, landscaping; tree removal, landscaping; tree space (stormwater mgmt), paving; leadwalk only Contractor: Dan Waldo Permit status: 11 | Expiration date: May 27, 2016 | Permit id: 0 |