Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 2144 Fernon St Philadelphia Pa 191451303 Make safe permit for violation #206813 note attached letter from engineer. Permit application in response to unsafe violations. To comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. Engineers report submitted. Licensed contractor to assume responsibility of work. No other work this permit. Three sets of plans drawn to professional quality are to be submitted for review and approval by the department before work on renovation starts. Contact streets department for dumpster permit and footway closure permits. Date: November 22, 2013 Contractor: D And B General Contracting Inc Client: Ellucci Vincent P | Permit type: Alteration permit | Permit status: Completed | Completion date: December 17, 2013 | Permit id: 507747 | |||||
SCORE 100 Date: July 2, 2015 Contractor: D And B General Contracting Inc Client: Sattar Samrina | Permit type: Alteration permit | Permit status: Completed | Completion date: January 20, 2016 | Permit id: 616503 | |||||
SCORE 100 6209 Limekiln Pike Philadelphia Pa 191411405 Sfd - new energy star windows, laminate walls with gwb, install roofing and insulation, some siding, floors and cabinetry. Additional permits required for pmbg, elect. And hvac applicant agrees to limit the construction to comply with ez permit standards for interior alterations, dated february 2007. Deviation from this standard will result in revocation of this permit and imposition of further penalties. . Date: July 26, 2010 Contractor: D And B General Contracting Inc Client: Stovall Ola Mae | Permit type: Alteration permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 292394 | |||||
SCORE 100 1313 Wolf St Philadelphia Pa 191482911 Stucco front and side of wall, install new front fascia,replace 2 front doors. Date: November 5, 2010 Contractor: D And B General Contracting Inc Client: Ttrich Richard J | Permit type: Alteration permit | Permit status: Completed | Completion date: December 15, 2010 | Permit id: 300218 | |||||
SCORE 100 2118 Wharton St Philadelphia Pa 191464537 "applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february, 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties."separate permits required for plumbing, electrical and mechanical work Date: November 4, 2011 Contractor: D And B General Contracting Inc Client: Nd Investments Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 8, 2012 | Permit id: 372116 | |||||
SCORE 100 22 Watkins St Philadelphia Pa 191451929 Demolition and rebuild existing rear addition on 1st and 2nd floor as part of an existing attached single family dwelling (see ap #546561 for plan) Date: July 25, 2014 Contractor: D And B General Contracting Inc Client: Nd Investments Llc | Permit type: Zoning permit | Permit status: Completed | Completion date: July 25, 2014 | Permit id: 551356 | |||||
SCORE 100 22 Watkins St Philadelphia Pa 191451929 Demolition and rebuild existing rear addition on 1st and 2nd floor-sfd Date: July 25, 2014 Contractor: D And B General Contracting Inc Client: Nd Investments Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 27, 2015 | Permit id: 549561 | |||||
SCORE 100 22 Watkins St Philadelphia Pa 191451929 Interior alterations to include drywall throughout, moisture resistant drywall in the bathroom and kitchen, new windows and doors in existing opening. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Separate permits required for plumbing, electrical and mechanical work Date: June 10, 2014 Contractor: D And B General Contracting Inc Client: Nd Investments Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: July 16, 2015 | Permit id: 540789 | |||||
SCORE 100 2118 Wharton St Philadelphia Pa 191464537 Rebuild 2 story rear wall. Framing, plywood and insulation on existing foundation for sfd. No interior work as part of this permit. Date: November 30, 2011 Contractor: D And B General Contracting Inc Client: Nd Investments Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: March 8, 2012 | Permit id: 372873 | |||||
SCORE 100 39 Willow St Philadelphia Pa 191044634 Rear concrete pad, remove and reinstall wall at main stair complete with finish and one glass block window Date: February 22, 2008 Contractor: D And B General Contracting Inc Client: Palmer Kristina | Permit type: Alteration permit | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 134094 | |||||
SCORE 100 3909 Warren St Philadelphia Pa 191044631 Rear concrete steps, parge basement walls where needed, and replace rotte drear fence where needed Date: February 22, 2008 Contractor: D And B General Contracting Inc Client: Hope Jennifer L Christman Mark A | Permit type: Alteration permit | Permit status: Completed | Completion date: May 13, 2008 | Permit id: 134107 | |||||
SCORE 100 318 N 39th St Philadelphia Pa 191044610 Replae missing cinderblock caps at rear wall, repair approx. 1 sq ft of sheetrock Date: February 22, 2008 Contractor: D And B General Contracting Inc Client: Wu Xuechan Yang Shu | Permit type: Alteration permit | Permit status: Completed | Completion date: May 12, 2008 | Permit id: 134097 | |||||
SCORE 100 2642 E Venango St Philadelphia Pa 191345527 Interior alterations to include minor sheetrock repair throughout, new kitchen cabinets. Also new roof recovering on this permit. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february 2007. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Date: August 13, 2010 Contractor: D And B General Contracting Inc Client: Hoban Daniel F | Permit type: Alteration permit | Permit status: Completed | Completion date: November 5, 2010 | Permit id: 296103 | |||||
SCORE 100 2 Locust St Philadelphia Pa 191063908 Level i alterations-condo, misc. Sheetrock, interior doors, kitchen cabinets,vanities. Additional permits needed for electrical and plumbing work. No structural changes. No changes to fire rated assemblies. Date: August 3, 2016 Contractor: D And B General Contracting Inc Client: Spear Robert Spear-Levine Ashley | Permit type: Alteration permit | Permit status: Completed | Completion date: March 11, 2017 | Permit id: 712173 | |||||
SCORE 100 2066 Fernon St Philadelphia Pa 191451422 Rebuild(2) story rear wall 2"x4" framing, plywood and stucco insulation on a new concreted poured foundation. Date: November 2, 2012 Contractor: D And B General Contracting Inc Client: Burg Kimberly | Permit type: Alteration permit | Permit status: Completed | Completion date: April 1, 2013 | Permit id: 431862 | |||||
SCORE 100 2066 Fernon St Philadelphia Pa 191451422 "applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february, 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties." separate permits required for plumbing, electrical and mechanical work Date: August 9, 2012 Contractor: D And B General Contracting Inc Client: Burg Kimberly | Permit type: Alteration permit | Permit status: Completed | Completion date: April 1, 2013 | Permit id: 420754 | |||||
SCORE 100 Date: December 4, 2007 Contractor: D And B General Contracting Inc Client: Blizzard Joyce J Hoffman T Alexander | Permit type: Alteration permit | Permit status: Completed | Completion date: January 13, 2015 | Permit id: 119478 | |||||
SCORE 100 2325 Dickinson St Philadelphia Pa 191464104 "applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated february, 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties." separate permits required for plumbing, electrical and mechanical work Date: January 7, 2013 Contractor: D And B General Contracting Inc Client: Winkler Frank | Permit type: Alteration permit | Permit status: Completed | Completion date: April 26, 2013 | Permit id: 446776 | |||||
SCORE 100 25 Grant Ave Philadelphia Pa 191142201 For alterations to an existing space to include wall ceiling floor finishing, new egress door hardware, new accessible service counter, and interior lighting. (iebc 2009, compliance path: work-area method, lvl i alterations) Date: August 22, 2014 Contractor: D And B General Contracting Inc Client: Commerce Bank Pa | Permit type: Alteration permit | Permit status: Completed | Completion date: October 10, 2014 | Permit id: 549584 | |||||
SCORE 100 117 W Hortter St Philadelphia Pa 191192707 Interior alterations to include drywall throughout, moisture resistance drywall in bathroom & kitchen, new windows and doors in existing openings. Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviation from the standard will result in revocation of this permit and imposition of further penalties. Licensed contractor to be listed on permit. Separate permits required for plumbing, electric and hvac. Call inspector at district office at least 24 hours prior to start. Date: February 23, 2015 Contractor: D And B General Contracting Inc Client: Mcmenamin Erin Michelle Welsh Bobbi Jo | Permit type: Alteration permit | Permit status: Expired | Completion date: August 21, 2015 | Permit id: 587663 | |||||
SCORE 100 Date: October 10, 2012 Contractor: D And B General Contracting Inc Client: Tucker Leon W Tucker Petrese B | Permit type: Demolition permit | Permit status: Completed | Completion date: June 2, 2014 | Permit id: 431870 | |||||
SCORE 100 7152 Mount Airy Ter Philadelphia Pa 191193335 New construction of a single family dwelling with cellar as per plans Date: May 15, 2013 Contractor: D And B General Contracting Inc Client: Bischoff Chris F Bischoff Christine F | Permit type: New construction permit | Permit status: Completed | Completion date: June 10, 2014 | Permit id: 449609 | |||||
SCORE 100 7152 Mount Airy Ter Philadelphia Pa 191193335 Amend permit number 449609 to include engineered drawings of tji joists for floor ceiling assemblies as per plans. Date: July 15, 2013 Contractor: D And B General Contracting Inc Client: Bischoff Chris F Bischoff Christine F | Permit type: Administrative permit | Permit status: Completed | Completion date: June 5, 2014 | Permit id: 478426 | |||||
SCORE 100 1455 S 52nd St Philadelphia Pa 191435006 "applicant agrees to limit the construction to comply with ez permit standard for interior alterations dated, february, 2007. Deviations from this standard will result in the revocation of this permit and imposition of further penalties." Date: December 18, 2007 Contractor: D And B General Contracting Inc Client: Lafferty David J | Permit type: Alteration permit | Permit status: Completed | Completion date: February 22, 2008 | Permit id: 122269 | |||||
SCORE 100 Date: February 22, 2008 Contractor: D And B General Contracting Inc Client: Wu Xinjiang Lai Lingyao | Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2008 | Permit id: 134115 |