SCORE 78 3 Columbia St Cambridge, Ma Renovate 2 bathrooms: general: new stack basement, through roof, unit 1: complete gut. All new wiring, plumbing and fixtures. Convert existing double hung window into awning window. Unit 2: partial renovation. New tile floor, new vanity, new toilet, vent fan, new waste/feed lines, reglaze existing bathtub. All fixtures remaining in existing positions. Retain existing awning window Permit type: Addition/alteration | Completion date: July 17, 2013 | Current use: Two-family | Parcel: 7935 | |||||
SCORE 78 123 Reed St Cambridge, Ma A. Demolition i. Homeowner responsibility: a. Removal of popcorn finish from ceilings b. Removal of paint layers from tin ceiling c. Other non-structural demolition as may be agreed upon ii. Contractor responsibility: a. All remaining structural and other demolition called for on the plans d1 including a. Retain concrete washer/dryer pad b. All construction debris to be disposed legally and recycled where possible. Iii. Hazardous materials should they be discovered will be removed and disposed of by a licensed contractor, whose costs will be added to the project and addressed in a csa change order form. B. Hvac build out to plans and elevations on a6 i. One 60,0 b. T. U 96% high efficiency carrier furnaces. Ii. One 2 ton 13 seer 410a carrier condensing unit and pad. Iii. One 2 ton 13 seer 410a carrier cased a-coils. Iv. One automatic zoning system to zone off 1st and 2nd floors. V. All duct work needed to supply air throughout each floor of the house. Vi. Refrigeration lin Permit type: Addition/alteration | Completion date: September 11, 2013 | Current use: One-family | Parcel: 19135 | |||||
SCORE 78 51 Eighth St Cambridge, Ma Kitchen to fully remodeled: remove ceiing, flooring, small popny wall, and chimney. Relocate gas stove, remove 1 window completly insulate and sheath over the opening and match exiting vynil siding, remove another window but replace it with a smaller double hung window, insulate and sheath over the opening and match exiting vynil siding below the new window. On all new wiring in the kitchen, new outlets/switches, new lighting, new ceiling, new flooring, and repairs to walls. Install new cabinets per plans with new counters/sink/disposal. New appliances. In addition 4 recessed lights in the living room Permit type: Addition/alteration | Completion date: September 16, 2014 | Current use: One-family | Parcel: 339451 | |||||
SCORE 78 12 Granville Rd Cambridge, Ma 1. Install (1) marvin integrity into front gable where there used to be a window before it was sided over at some point. New window to match previous windows. Exterior 1x trim to mirror the rest of the house 2. Install (2) velux 22 into a 25"x50" ro into the roof 3. Relocate existing roof vent for the bathroom fan to new roof location to accommodate one of the skylights. 4. Insulate attic wall and rafter cavities with 5. 5" of closed cell spray foam 5 rough out attic floor to accommodate a modular stairway to be installed by others. Rear window removed from permit Permit type: Addition/alteration | Completion date: June 1, 2015 | Current use: One-family | Parcel: 23376 | |||||
SCORE 78 3 Columbia St Cambridge, Ma Renovate 2 bathrooms: general: new stack basement, through roof, unit 1: complete gut. All new wiring, plumbing and fixtures. Convert existing double hung window into awning window. Unit 2: partial renovation. New tile floor, new vanity, new toilet, vent fan, new waste feed lines, reglaze existing bathtub. All fixtures remaining in existing positions. Retain existing awning window Permit type: Addition/alteration | Completion date: July 17, 2013 | Current use: Two-family | Permit id: 0 | Parcel: 7935 | |||||
SCORE 78 123 Reed St Cambridge, Ma A. Demolition i. Homeowner responsibility: a. Removal of popcorn finish from ceilings b. Removal of paint layers from tin ceiling c. Other non-structural demolition as may be agreed upon ii. Contractor responsibility: a. All remaining structural and other demolition called for on the plans d1 including a. Retain concrete washer dryer pad b. All construction debris to be disposed legally and recycled where possible. Iii. Hazardous materials should they be discovered will be removed and disposed of by a licensed contractor, whose costs will be added to the project and addressed in a csa change order form. B. Hvac build out to plans and elevations on a6 i. One 60,0 b. T. U 96% high efficiency carrier furnaces. Ii. One 2 ton 13 seer 410a carrier condensing unit and pad. Iii. One 2 ton 13 seer 410a carrier cased a-coils. Iv. One automatic zoning system to zone off 1st and 2nd floors. V. All duct work needed to supply air throughout each floor of the house. Vi. Refrigeration lin Permit type: Addition/alteration | Completion date: September 11, 2013 | Current use: One-family | Permit id: 0 | Parcel: 19135 | |||||
SCORE 78 51 Eighth St Cambridge, Ma Kitchen to fully remodeled: remove ceiing, flooring, small popny wall, and chimney. Relocate gas stove, remove 1 window completly insulate and sheath over the opening and match exiting vynil siding, remove another window but replace it with a smaller double hung window, insulate and sheath over the opening and match exiting vynil siding below the new window. On all new wiring in the kitchen, new outlets switches, new lighting, new ceiling, new flooring, and repairs to walls. Install new cabinets per plans with new counters sink disposal. New appliances. In addition 4 recessed lights in the living room Permit type: Addition/alteration | Completion date: September 16, 2014 | Current use: One-family | Permit id: 0 | Parcel: 339451 |