Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Date: May 16, 2011 Contractor: Corman Construction Inc Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2013 | Permit id: Pa62436 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Date: September 14, 2011 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2013 | Permit id: Pa65623 | |||||
SCORE 88 1201 M Street Se Washington Dc Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj Contractor: Corman Construction Inc Permit status: 5 | Expiration date: May 5, 2015 | Permit id: 0 | |||||
SCORE 88 1201 M Street Se Washington Dc Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj Date: June 12, 2013 Contractor: Corman Construction Inc Permit status: 8 | Expiration date: May 5, 2014 | Permit id: Pa82000 | |||||
SCORE 88 1201 M Street Se Washington Dc Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj Contractor: Corman Construction Inc Permit status: 5 | Expiration date: May 5, 2015 | Permit id: 0 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Date: March 27, 2013 Contractor: Corman Construction Inc Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa62436-R1 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Date: March 27, 2013 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa65623-R1 | |||||
SCORE 88 1201 M Street Se Washington Dc Excavation for the installation of a cast-in-place concrete sewer line diversion structure with approx. Dims. 89 long x 53 wide. Date: April 26, 2013 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: May 5, 2014 | Permit id: Pa82000 | |||||
SCORE 88 901 M Street Se Washington Dc Excavation for the installation of a cast-in-place concrete sewer line diversion structure with approx. Dims. Of diam. X 28 deep. Date: June 24, 2013 Contractor: Corman Construction Inc Client: Corman Construction | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: March 17, 2014 | Permit id: Pa84078 | |||||
SCORE 88 901 M Street Se Washington Dc This construction permit application is associated with dc waters m street sewer diversion project, div e, headed by builder corman construction, inc., contact mitch rubin. This application is strictly limited to ddot ipma and ch2m review of the support of excavation measures related to structure 19a. Please note that all work associated with division e has been reviewed and approved by the following entities: ddoe sec/swm/wqd, ddot, dcra, and all other utilities. The structures themselves have been reviewed and approved. There is no need for additional utility clearance letters or ddoe reviews. Please refer to permits number b1201360, pa62436-r1, pa65623-r1, pa820 and pa84078 to confirm. Please have ipma/ch2m review the soe measures attached at your earliest convenience, and call me personally with any additional questions mike manoski, 301-343-5479 at corman construction, inc. Date: September 27, 2013 Contractor: Corman Construction Inc Permit type: Excavation; sheeting & shoring (for buildings), mega projects; dc water combined sewer proj, excavation; vault(s) lxw | Permit status: Permit expired | Expiration date: November 8, 2014 | Permit id: Pa87252 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Date: March 31, 2014 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa65623-R2 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Date: March 31, 2014 Contractor: Corman Construction Inc Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: April 1, 2015 | Permit id: Pa62436-R2 | |||||
SCORE 88 1201 M Street Se Washington Dc Excavation for the installation of a cast-in-place concrete sewer line diversion structure with approx. Dims. 89 long x 53 wide. Date: April 23, 2014 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Revoked | Expiration date: May 5, 2015 | |||||
SCORE 88 901 M Street Se Washington Dc Excavation for the installation for a cast in place concrete sewer lined diversion structure with approximate dimension 18 wide x 18 long x 21 deep. This construction permit application is associated with dc waters m street sewer diversion, div e, headed by builder corman construction, inc., contact mitch rubin. This application is strictly limited to ddot ipma and ch2m hill review of support of excavation measures related to structure 19. Please note that all work associated with division e has been reviewed by the following entities: ddoe sec/swm/wqd, ddot, dcra, and all other utilities. The structures themselves have been reviewed and approved. There is no need for additional utility clearance letters or ddoe reviews. Please refer to permit number b1201360, pa62436-r1, pa65623-r1, pa82000, and pa84078 to confirm. Please have ipma /ch2m hill review the soe measures attached at your earliest convenience, and call me personally with any additional questions mike manoski 301-343-5479 at Date: May 29, 2014 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: December 31, 2014 | Permit id: Pa96099 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. Overflows will be intercepted at the existing combined sewers by constructing diversion chambers and diverted flows will be conveyed to the anacostia river tunnel (art) by a series of diversion sewers constructed along m street se. Diversion chambers will be constructed along m street se to intercept csos 015, 016 and 017 at 9th, 12th and 14th streets se, respectively. A 48 diameter diversion sewer will convey flow from cso 015 to cso 016, and a 108 diversion sewer will convey flow from cso 016 to cso 017. Downstream od cso 017 a 7. 5x15 concrete box "culvert" will be installed alonf m st up to other side of water st. The combined flow diverted from csos 015, 016 and 017 will be delivered to the art via a vortex drop and deaeration facility to be constructed near the intersection of m and water streets se. The vortex d Date: March 11, 2015 Contractor: Corman Construction Inc Client: Dc Water And Sewer Authority | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa62436-R3 | |||||
SCORE 88 M Street Se And 9th Street Se Washington Dc The division e - m street diversion sewer project is intended to address consent decree requirements to control overflows from cso 015 and to consolidate csos 016 and 017. The excavation elements of this project are contained in application # 62436. Due to the necessary access pits and associated construction work and staging areas, some portions of existing road, medians, curbs, sidewalk and trees needs to be impacted and restored at the completion of work. This project will require 3 staging areas, one between m st, 9th st and potomac ave, one located north of m st , east of 12th st, and one at south-east side of m st and water st. Staging areas will be restored to original or better condition. Staging area at water st will remain to be in use for the future art project (under a separate permit). To maintain traffic for work at the intersection of 9th st and m st, the sidewalk between 8th st and 9th st on the north side of m st needs to be temporary converted to a travel lane. This r Date: March 11, 2015 Contractor: Corman Construction Inc Client: Dc Water | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: June 30, 2015 | Permit id: Pa65623-R3 |