Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Date: March 30, 2001 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: April 18, 2001 | Current use: Single family d | |||||
SCORE 98 Date: January 2, 2001 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 9, 2001 | Current use: Single family d | |||||
SCORE 98 Date: June 5, 2001 Contractor: Cooper Heating And Cooling Inc Client: Mary Sorgel | Applicant: Cooper Heating & Cooling Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: July 25, 2001 | Current use: Single family d | |||||
SCORE 98 Date: April 5, 2001 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 17, 2001 | Current use: Single family d | |||||
SCORE 98 Date: December 21, 2000 Contractor: Cooper Heating And Cooling Inc Client: Brock Mccool | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: February 12, 2001 | Current use: Single family d | |||||
SCORE 98 845 Park Ln Boulder Co Install new comfort cooling unit, including duct work. See pmt 2000-01528 for electrical permit. Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Client: George Keays, Keays | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2001 | Current use: Single family d | |||||
SCORE 98 Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwe | |||||
SCORE 98 Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Client: City Of Boulder | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Single family d | |||||
SCORE 98 Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwe | |||||
SCORE 98 Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwe | |||||
SCORE 98 Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Client: Of City | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2001 | Current use: Multifamily dwe | |||||
SCORE 98 Date: November 29, 2000 Contractor: Cooper Heating And Cooling Inc Client: City Of Boulder | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2001 | Current use: Multifamily dwe | |||||
SCORE 98 Date: November 13, 2000 Contractor: Cooper Heating And Cooling Inc Client: Allan Kaplan | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: December 29, 2000 | Current use: Single family d | |||||
SCORE 98 Date: September 14, 2000 Contractor: Cooper Heating And Cooling Inc Client: Ron Brown | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 6, 2000 | Current use: Single family d | |||||
SCORE 98 Date: August 23, 2000 Contractor: Cooper Heating And Cooling Inc Client: Ronald Freeman,Kathryn Freeman | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Single family d | |||||
SCORE 98 Date: August 23, 2000 Contractor: Cooper Heating And Cooling Inc Client: David Boyd,Donna Boyd | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 14, 2000 | Current use: Single family d | |||||
SCORE 98 Date: August 23, 2000 Contractor: Cooper Heating And Cooling Inc Client: Folsom Hollow Partnership | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2000 | Current use: Single family d | |||||
SCORE 98 Date: February 7, 2001 Contractor: Cooper Heating And Cooling Inc Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwe | |||||
SCORE 98 Date: August 11, 2000 Contractor: Cooper Heating And Cooling Inc Client: Joshaua Kahn,Lori Comm-Kahn | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Wdn | Current use: Single family d | |||||
SCORE 98 Date: August 11, 2000 Contractor: Cooper Heating And Cooling Inc Client: Jill Skuba,Jonathan Skuba | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Wdn | Current use: Single family d | |||||
SCORE 98 Date: August 2, 2000 Contractor: Cooper Heating And Cooling Inc Client: Mark Winey,Mary Darlington | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Single family d | |||||
SCORE 98 Date: July 19, 2000 Contractor: Cooper Heating And Cooling Inc Client: Lewis Snyder,Wendy Snyder | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: August 15, 2000 | Current use: Single family d | |||||
SCORE 98 Date: April 19, 2000 Contractor: Cooper Heating And Cooling Inc Client: James Hostetler,Nancy Hostetler | Applicant: Cooper Heating & Cooling Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: May 25, 2000 | Current use: Single family d | |||||
SCORE 98 Client: Ken & Maribeth Van Haute | Permit type: Mechanical | Permit status: Cmp | Completion date: April 9, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-00001 | |||||
SCORE 98 Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-00424 | |||||
SCORE 98 Client: Michael & Jane Reagan | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: April 18, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01179 | |||||
SCORE 98 Client: Roger & Patricia K Brooks | Permit type: Mechanical | Permit status: Cmp | Completion date: April 17, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01260 | |||||
SCORE 98 Client: Roop Mahajan | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01900 | |||||
SCORE 98 Client: Mary Sorgel | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: July 25, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02297 | |||||
SCORE 98 Client: James Hostetler | Permit type: Mechanical | Permit status: Cmp | Completion date: May 25, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-01563 | |||||
SCORE 98 Client: Lewis Snyder | Permit type: Mechanical | Permit status: Cmp | Completion date: August 15, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03018 | |||||
SCORE 98 Client: Mark Winey | Permit type: Mechanical | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03189 | |||||
SCORE 98 Client: Jill Skuba | Permit type: Mechanical | Permit status: Wdn | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03333 | |||||
SCORE 98 Client: Joshaua Kahn | Permit type: Mechanical | Permit status: Wdn | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03334 | |||||
SCORE 98 Client: Folsom Hollow Partnership | Permit type: Mechanical | Permit status: Cmp | Completion date: November 13, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03492 | |||||
SCORE 98 Client: Ronald Freeman | Permit type: Mechanical | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03494 | |||||
SCORE 98 Client: David Boyd | Permit type: Mechanical | Permit status: Cmp | Completion date: September 14, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03496 | |||||
SCORE 98 Client: Ron Brown | Permit type: Mechanical | Permit status: Cmp | Completion date: October 6, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03813 | |||||
SCORE 98 Client: Allan Kaplan | Permit type: Mechanical | Permit status: Cmp | Completion date: December 29, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04632 | |||||
SCORE 98 Client: Of City | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-04847 | |||||
SCORE 98 Client: City Of Boulder | Permit type: Mechanical | Permit status: Cmp | Completion date: May 10, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-04848 | |||||
SCORE 98 Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-04851 | |||||
SCORE 98 Client: City Of Boulder | Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04858 | |||||
SCORE 98 Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-04860 | |||||
SCORE 98 Permit type: Mechanical | Permit status: Cmp | Completion date: April 19, 2001 | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-04868 | |||||
SCORE 98 845 Park Ln Boulder Co Install new comfort cooling unit, including duct work. See pmt 2000-01528 for electrical permit. Client: George Keays | Permit type: Mechanical | Permit status: Cmp | Completion date: October 8, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-04869 | |||||
SCORE 98 Client: Brock Mccool | Permit type: Mechanical | Permit status: Cmp | Completion date: February 12, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-05088 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 12, 2014 | Permit id: Bp-13-1951 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: August 31, 2014 | Permit id: Bp-14-0326 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 7, 2014 | Permit id: Bp-14-0216 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 7, 2012 | Permit id: Bp-12-1499 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: January 8, 2013 | Permit id: Bp-12-1213 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 23, 2014 | Permit id: Bp-14-1096 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: June 11, 2013 | Permit id: Bp-13-0525 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: May 1, 2011 | Permit id: Bp-10-1997 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 3, 2010 | Permit id: Bp-10-2104 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: September 18, 2012 | Permit id: Bp-12-1395 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: June 7, 2011 | Permit id: Bp-10-2275 | |||||
SCORE 98 Date: December 21, 2010 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit closed | Completion date: January 25, 2011 | Permit id: Bp-10-2345 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: October 13, 2016 | Expiration date: November 3, 2012 | Permit id: Bp-12-0721 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 20, 2013 | Permit id: Bp-13-0041 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 18, 2012 | Permit id: Bp-12-1351 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 4, 2013 | Permit id: Bp-10-2129 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 3, 2010 | Permit id: Bp-10-2104 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 4, 2013 | Permit id: Bp-10-2129 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: April 11, 2011 | Permit id: Bp-11-0407 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: June 2, 2011 | Permit id: Bp-11-0609 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: July 21, 2011 | Permit id: Bp-11-1126 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 16, 2011 | Permit id: Bp-11-1419 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: April 16, 2012 | Permit id: Bp-11-1757 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: January 22, 2013 | Permit id: Bp-12-1311 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: August 28, 2012 | Permit id: Bp-12-1423 | |||||
SCORE 98 Permit type: Mechanical - other | Permit status: Permit issued | Expiration date: February 26, 2013 | Permit id: Bp-12-1544 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: October 25, 2012 | Permit id: Bp-12-1570 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 19, 2012 | Permit id: Bp-12-1681 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 16, 2012 | Permit id: Bp-12-1752 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 26, 2012 | Permit id: Bp-12-1775 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 29, 2012 | Permit id: Bp-12-1801 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 6, 2013 | Permit id: Bp-12-1962 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit closed | Completion date: November 29, 2012 | Permit id: Bp-12-0555 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit closed | Completion date: November 28, 2012 | Permit id: Bp-12-2017 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 5, 2013 | Permit id: Bp-13-0100 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: November 13, 2013 | Permit id: Bp-13-1819 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 21, 2014 | Permit id: Bp-13-2153 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 4, 2014 | Permit id: Bp-14-0057 | |||||
SCORE 98 Permit type: Boiler | Permit status: Permit complete | Completion date: March 6, 2014 | Permit id: Bp-14-0158 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 6, 2014 | Permit id: Bp-14-0160 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 10, 2014 | Permit id: Bp-14-0294 | |||||
SCORE 98 Permit type: Boiler | Permit status: Permit complete | Completion date: December 5, 2014 | Permit id: Bp-14-0728 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 28, 2014 | Permit id: Bp-14-1772 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 24, 2015 | Permit id: Bp-14-1910 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit issued | Expiration date: December 1, 2014 | Permit id: Bp-14-0999 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: June 1, 2016 | Permit id: Bp-14-1643 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: July 27, 2012 | Permit id: Bp-12-1268 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: January 10, 2012 | Permit id: Bp-11-1151 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: December 25, 2011 | Permit id: Bp-11-1007 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: April 17, 2012 | Permit id: Bp-12-0476 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit withdrawn | Permit id: Bp-11-0069 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: December 9, 2013 | Permit id: Bp-13-0833 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 7, 2011 | Permit id: Bp-11-1448 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 18, 2010 | Permit id: Bp-10-1793 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: May 1, 2011 | Permit id: Bp-10-1997 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: June 7, 2011 | Permit id: Bp-10-2275 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: January 25, 2011 | Permit id: Bp-10-2345 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: July 18, 2011 | Permit id: Bp-11-0069 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: November 8, 2011 | Permit id: Bp-11-0678 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 14, 2012 | Permit id: Bp-12-2000 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: April 1, 2013 | Permit id: Bp-13-0301 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 14, 2014 | Permit id: Bp-13-0831 | |||||
SCORE 98 Permit type: Evaporative cooler | Permit status: Permit complete | Completion date: July 17, 2013 | Permit id: Bp-13-0913 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 25, 2013 | Permit id: Bp-13-0933 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 9, 2013 | Permit id: Bp-13-0949 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: December 25, 2013 | Permit id: Bp-13-0952 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: December 25, 2013 | Permit id: Bp-13-0953 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: September 11, 2013 | Permit id: Bp-13-1280 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 2, 2013 | Permit id: Bp-13-1447 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: October 2, 2013 | Permit id: Bp-13-1469 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: January 6, 2014 | Permit id: Bp-13-1506 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: April 15, 2014 | Permit id: Bp-13-1701 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: November 14, 2013 | Permit id: Bp-13-1786 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: October 9, 2014 | Permit id: Bp-14-0804 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 8, 2014 | Permit id: Bp-14-1302 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: March 8, 2015 | Permit id: Bp-14-1638 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: May 11, 2016 | Permit id: Bp-13-1162 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 31, 2016 | Expiration date: December 3, 2014 | Permit id: Bp-14-1011 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit withdrawn | Permit id: Bp-13-1505 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: October 28, 2014 | Permit id: Bp-14-0761 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 4, 2010 | Permit id: Bp-10-1896 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: October 30, 2013 | Permit id: Bp-13-0590 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: June 14, 2011 | Permit id: Bp-11-0852 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 19, 2011 | Permit id: Bp-11-1145 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: October 6, 2011 | Permit id: Bp-11-1319 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 28, 2011 | Permit id: Bp-11-1741 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: July 12, 2011 | Permit id: Bp-11-0047 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: April 20, 2011 | Permit id: Bp-11-0415 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: June 30, 2011 | Permit id: Bp-11-0842 | |||||
SCORE 98 Permit type: Furnace | Permit status: Withdrawn | Permit id: Bp-11-0743 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: January 25, 2012 | Permit id: Bp-11-1260 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: July 29, 2011 | Permit id: Bp-11-1193 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: August 16, 2011 | Permit id: Bp-11-1200 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 22, 2011 | Permit id: Bp-11-1903 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 17, 2011 | Permit id: Bp-11-1831 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 20, 2011 | Permit id: Bp-11-1977 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: April 10, 2011 | Permit id: Bp-10-1848 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 24, 2010 | Permit id: Bp-10-1897 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 17, 2010 | Permit id: Bp-10-2056 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 16, 2011 | Permit id: Bp-10-2057 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 10, 2012 | Permit id: Bp-10-2058 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: January 5, 2011 | Permit id: Bp-10-2302 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: June 18, 2011 | Permit id: Bp-10-2327 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 27, 2010 | Permit id: Bp-10-2251 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: January 21, 2011 | Permit id: Bp-10-2271 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: January 25, 2011 | Permit id: Bp-10-2381 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 22, 2010 | Permit id: Bp-10-1759 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 30, 2010 | Permit id: Bp-10-2147 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 21, 2010 | Permit id: Bp-10-2201 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 20, 2010 | Permit id: Bp-10-2250 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: February 2, 2011 | Permit id: Bp-10-2380 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: January 14, 2011 | Permit id: Bp-10-2343 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: August 5, 2012 | Permit id: Bp-12-0175 | |||||
SCORE 98 Permit type: Electrical service change | Permit status: Permit closed | Completion date: November 1, 2012 | Permit id: Bp-12-1851 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: April 4, 2012 | Permit id: Bp-12-0284 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: May 9, 2012 | Permit id: Bp-12-0598 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: September 26, 2012 | Permit id: Bp-12-0945 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: June 15, 2012 | Permit id: Bp-12-0947 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: October 4, 2012 | Permit id: Bp-12-1214 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: July 29, 2012 | Permit id: Bp-12-0149 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 9, 2012 | Permit id: Bp-12-1927 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 18, 2013 | Permit id: Bp-12-2037 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 22, 2013 | Permit id: Bp-12-2106 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: May 3, 2012 | Permit id: Bp-12-0567 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: May 15, 2012 | Permit id: Bp-12-0679 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: June 1, 2012 | Permit id: Bp-12-0692 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: June 24, 2013 | Permit id: Bp-12-2224 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: June 21, 2012 | Permit id: Bp-12-0946 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: January 26, 2013 | Permit id: Bp-12-1325 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 21, 2012 | Permit id: Bp-12-1355 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: February 10, 2013 | Permit id: Bp-12-1431 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 14, 2013 | Permit id: Bp-12-1541 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 30, 2012 | Permit id: Bp-12-1800 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 30, 2012 | Permit id: Bp-12-1856 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 19, 2012 | Permit id: Bp-12-1841 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: June 20, 2014 | Permit id: Bp-12-2149 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 3, 2012 | Permit id: Bp-12-1884 | |||||
SCORE 98 Permit type: Reroofing | Permit status: Permit closed | Completion date: July 18, 2012 | Permit id: Bp-12-1031 | |||||
SCORE 98 Permit type: Electrical service change | Permit status: Permit complete | Completion date: July 26, 2013 | Permit id: Bp-13-1067 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: March 12, 2013 | Permit id: Bp-13-0046 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 14, 2013 | Permit id: Bp-13-0246 | |||||
SCORE 98 Permit type: Evaporative cooler | Permit status: Permit complete | Completion date: August 14, 2013 | Permit id: Bp-13-0478 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Application withdrawn | Permit id: Bp-13-0595 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 25, 2013 | Permit id: Bp-13-0732 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: July 10, 2013 | Permit id: Bp-13-0039 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 11, 2013 | Permit id: Bp-13-0121 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: April 5, 2013 | Permit id: Bp-13-0372 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: May 17, 2013 | Permit id: Bp-13-0582 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: August 28, 2013 | Permit id: Bp-13-0954 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 12, 2013 | Permit id: Bp-13-0951 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 19, 2013 | Permit id: Bp-13-0991 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: August 12, 2013 | Permit id: Bp-13-1132 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 27, 2015 | Permit id: Bp-13-1177 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 26, 2013 | Permit id: Bp-13-1399 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 30, 2013 | Permit id: Bp-13-1435 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 23, 2013 | Permit id: Bp-13-1468 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 31, 2013 | Permit id: Bp-13-1507 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 16, 2013 | Permit id: Bp-13-1591 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 18, 2013 | Permit id: Bp-13-1593 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 28, 2013 | Permit id: Bp-13-1594 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 15, 2013 | Permit id: Bp-13-1595 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: April 19, 2014 | Permit id: Bp-13-1738 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 4, 2014 | Permit id: Bp-13-1859 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 26, 2013 | Permit id: Bp-13-1979 | |||||
SCORE 98 Permit type: Plumbing - other | Permit status: Permit complete | Completion date: September 30, 2013 | Permit id: Bp-13-1326 | |||||
SCORE 98 Permit type: Electrical service change | Permit status: Permit complete | Completion date: April 2, 2014 | Permit id: Bp-14-0373 | |||||
SCORE 98 Permit type: Electrical service change | Permit status: Permit complete | Completion date: October 9, 2014 | Permit id: Bp-14-1733 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 18, 2014 | Permit id: Bp-14-0117 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 24, 2014 | Permit id: Bp-14-0164 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 7, 2014 | Permit id: Bp-14-0205 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 31, 2014 | Permit id: Bp-14-0366 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 23, 2015 | Permit id: Bp-14-0192 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: April 9, 2014 | Permit id: Bp-14-0282 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: August 31, 2014 | Permit id: Bp-14-0330 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: April 2, 2014 | Permit id: Bp-14-0331 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: September 8, 2014 | Permit id: Bp-14-0379 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit complete | Completion date: September 22, 2014 | Permit id: Bp-14-1639 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 23, 2014 | Permit id: Bp-14-1595 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: May 8, 2014 | Permit id: Bp-14-0562 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: April 30, 2014 | Permit id: Bp-14-0676 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: January 28, 2016 | Permit id: Bp-14-0762 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 15, 2014 | Permit id: Bp-14-0904 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 16, 2014 | Permit id: Bp-14-1139 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 7, 2014 | Permit id: Bp-14-1168 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: March 2, 2015 | Permit id: Bp-14-1604 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 2, 2015 | Permit id: Bp-14-1857 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: November 18, 2014 | Permit id: Bp-14-1872 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Expiration date: July 6, 2013 | Permit id: Bp-13-0012 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Expiration date: November 24, 2013 | Permit id: Bp-13-0731 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: October 6, 2016 | Permit id: Bp-16-1412 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 1, 2016 | Permit id: Bp-15-2336 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: October 28, 2015 | Permit id: Bp-15-1534 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-1144 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 5, 2015 | Permit id: Bp-15-1667 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: September 1, 2015 | Permit id: Bp-15-1663 | |||||
SCORE 98 Date: March 1, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-0326 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: May 30, 2017 | Permit id: Bp-17-0971 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: May 5, 2015 | Permit id: Bp-14-2099 | |||||
SCORE 98 Permit type: Boiler | Permit status: Permit issued | Expiration date: July 5, 2015 | Permit id: Bp-15-0010 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: July 22, 2015 | Permit id: Bp-15-0105 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 20, 2015 | Permit id: Bp-15-0301 | |||||
SCORE 98 Permit type: Boiler | Permit status: Permit issued | Expiration date: November 8, 2015 | Permit id: Bp-15-0786 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 25, 2015 | Permit id: Bp-15-1072 | |||||
SCORE 98 105 Rocky Knob Lane Nederland Co Install tankless water heater. Tankless water heater was not install but instead a gallon water heater was installed. Per inspection by ben Permit type: Water heater | Permit status: Permit complete | Completion date: July 28, 2015 | Permit id: Bp-15-0913 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 19, 2016 | Permit id: Bp-16-0192 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-0305 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 31, 2015 | Permit id: Bp-14-2168 | |||||
SCORE 98 Permit type: Boiler | Permit status: Permit complete | Completion date: June 13, 2016 | Permit id: Bp-16-0967 | |||||
SCORE 98 Permit type: Boiler | Permit status: Application withdrawn | Permit id: Bp-16-1032 | |||||
SCORE 98 75 Crestview Drive Longmont Co Replace furnace-110k btu, a c-4ton, water heater-40gal & electrical panel upgrade Permit type: Furnace | Permit status: Permit issued | Expiration date: September 5, 2016 | Permit id: Bp-16-0358 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 27, 2015 | Permit id: Bp-14-2043 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 25, 2015 | Permit id: Bp-14-2269 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: January 26, 2015 | Permit id: Bp-15-0004 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 10, 2015 | Permit id: Bp-15-0097 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 29, 2015 | Permit id: Bp-15-0690 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Application withdrawn | Permit id: Bp-15-0738 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: August 5, 2015 | Permit id: Bp-15-1155 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 4, 2015 | Permit id: Bp-15-1285 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: February 2, 2016 | Permit id: Bp-15-1493 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: January 27, 2016 | Permit id: Bp-15-2592 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-15-2523 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 3, 2016 | Permit id: Bp-15-2681 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-15-2735 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit issued | Expiration date: August 19, 2015 | Permit id: Bp-15-0245 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: March 29, 2016 | Permit id: Bp-16-0414 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Permit id: Bp-16-1048 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 10, 2016 | Permit id: Bp-16-0866 | |||||
SCORE 98 Permit type: Furnace | Permit status: Zoning queue | Permit id: Bp-16-1714 | |||||
SCORE 98 Date: August 25, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit complete | Completion date: September 16, 2016 | Permit id: Bp-16-1712 | |||||
SCORE 98 Date: August 25, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Water heater | Permit status: Permit complete | Completion date: September 9, 2016 | Permit id: Bp-16-1710 | |||||
SCORE 98 Date: August 23, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit complete | Completion date: September 6, 2016 | Permit id: Bp-16-1685 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: September 15, 2016 | Permit id: Bp-16-1771 | |||||
SCORE 98 Date: September 28, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-1997 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 6, 2016 | Permit id: Bp-16-1928 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-2026 | |||||
SCORE 98 Date: October 14, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit complete | Completion date: December 5, 2016 | Permit id: Bp-16-2141 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: November 18, 2016 | Permit id: Bp-16-2193 | |||||
SCORE 98 Date: November 4, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-2310 | |||||
SCORE 98 Date: November 17, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-2433 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 2, 2016 | Permit id: Bp-16-2469 | |||||
SCORE 98 Date: November 30, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-2509 | |||||
SCORE 98 Date: December 7, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Air conditioning | Permit status: Permit issued | Permit id: Bp-16-2545 | |||||
SCORE 98 Date: December 14, 2016 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-16-2579 | |||||
SCORE 98 Date: January 6, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Ezbp hold | Permit id: Bp-17-0016 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: January 25, 2017 | Permit id: Bp-16-2570 | |||||
SCORE 98 Date: June 5, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-1104 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit complete | Completion date: June 16, 2015 | Permit id: Bp-15-0852 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: August 25, 2015 | Permit id: Bp-15-1617 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: November 30, 2015 | Permit id: Bp-15-1394 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 21, 2015 | Permit id: Bp-15-1496 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 17, 2014 | Permit id: Bp-14-2218 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 23, 2014 | Permit id: Bp-14-2100 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: April 28, 2015 | Permit id: Bp-14-2015 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: January 13, 2015 | Permit id: Bp-14-2291 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 2, 2015 | Permit id: Bp-15-1645 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 2, 2015 | Permit id: Bp-15-0983 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: February 5, 2015 | Permit id: Bp-15-0088 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: March 17, 2015 | Permit id: Bp-15-0303 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: July 29, 2015 | Permit id: Bp-15-0147 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: April 17, 2015 | Permit id: Bp-15-0464 | |||||
SCORE 98 Permit type: Boiler | Permit status: Permit complete | Completion date: April 28, 2015 | Permit id: Bp-15-0513 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 16, 2015 | Permit id: Bp-15-1073 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 31, 2015 | Permit id: Bp-15-1170 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 11, 2015 | Permit id: Bp-15-1211 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: July 13, 2015 | Permit id: Bp-15-1200 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 13, 2015 | Permit id: Bp-15-1095 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: August 11, 2015 | Permit id: Bp-15-1477 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 17, 2015 | Permit id: Bp-15-1495 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: September 29, 2015 | Permit id: Bp-15-1664 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 29, 2015 | Permit id: Bp-15-1935 | |||||
SCORE 98 Permit type: Air conditioning | Permit id: Bp-15-2237 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: November 17, 2015 | Permit id: Bp-15-2283 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 14, 2016 | Permit id: Bp-15-2429 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 28, 2015 | Permit id: Bp-15-2112 | |||||
SCORE 98 Permit type: Furnace | Permit status: Application withdrawn | Permit id: Bp-15-2426 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: May 14, 2016 | Permit id: Bp-15-2427 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: December 10, 2015 | Permit id: Bp-15-2430 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-15-1948 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: December 21, 2015 | Permit id: Bp-15-2046 | |||||
SCORE 98 Permit type: Electrical service change | Permit status: Permit complete | Completion date: March 14, 2016 | Permit id: Bp-16-0357 | |||||
SCORE 98 7302 Spring Court Boulder Co Install 2-240v circuits for electrical baseboard & 1-240v 50amp sub panel Permit type: Electrical service change | Permit status: Permit complete | Completion date: February 9, 2016 | Permit id: Bp-16-0006 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Final review queue | Completion date: August 29, 2016 | Permit id: Bp-16-1505 | |||||
SCORE 98 Permit type: Water heater | Permit status: Permit issued | Expiration date: August 21, 2016 | Permit id: Bp-16-0269 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 30, 2016 | Permit id: Bp-16-1033 | |||||
SCORE 98 Permit type: Evaporative cooler | Permit status: Permit complete | Completion date: June 30, 2016 | Permit id: Bp-16-1067 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: June 23, 2016 | Permit id: Bp-16-1083 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: December 17, 2016 | Permit id: Bp-16-1157 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 25, 2016 | Permit id: Bp-16-1439 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit issued | Expiration date: January 18, 2017 | Permit id: Bp-16-1440 | |||||
SCORE 98 6658 Snead Court Longmont Co Replace furnace (110k btu 98%), water heater (50-gal 40k btu) & a c (4-ton) Permit type: Furnace | Permit status: Permit complete | Completion date: August 3, 2017 | Permit id: Bp-17-1212 | |||||
SCORE 98 Date: June 28, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-1326 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-1366 | |||||
SCORE 98 1401 White Hawk Ranch Drive Boulder Co Replace 3 furnaces (2 @ 98% 70k btu & 1 @ 80% k btu) & 3 a cs (3-ton) Date: July 14, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-1443 | |||||
SCORE 98 Date: June 30, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Air conditioning | Permit status: Permit complete | Completion date: July 18, 2017 | Permit id: Bp-17-1351 | |||||
SCORE 98 Date: August 14, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit complete | Completion date: September 12, 2017 | Permit id: Bp-17-1664 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Expiration date: May 23, 2016 | Permit id: Bp-15-2524 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: September 15, 2017 | Permit id: Bp-17-1779 | |||||
SCORE 98 Date: August 29, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit complete | Completion date: October 13, 2017 | Permit id: Bp-17-1795 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2065 | |||||
SCORE 98 Date: October 12, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit complete | Completion date: October 18, 2017 | Permit id: Bp-17-2147 | |||||
SCORE 98 Date: October 16, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2167 | |||||
SCORE 98 Date: October 16, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2171 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: October 17, 2017 | Permit id: Bp-17-2054 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2214 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2272 | |||||
SCORE 98 Date: October 30, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2279 | |||||
SCORE 98 Date: October 30, 2017 Contractor: Cooper Heating And Cooling Inc Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2287 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Permit id: Bp-17-2288 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 17, 2010 | Permit id: Bp-10-1129 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: March 28, 2011 | Permit id: Bp-10-1715 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: January 23, 2011 | Permit id: Bp-10-1233 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 17, 2010 | Permit id: Bp-10-1167 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: March 18, 2010 | Permit id: Bp-09-1847 | |||||
SCORE 98 7914 Wellshire Court Longmont Co Install 110k btu 95% efficient furance, a 4-ton a c, thermostat, and gal water heater Permit type: Air conditioning | Permit status: Complete | Completion date: October 19, 2009 | Permit id: Bp-09-1086 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: May 24, 2010 | Permit id: Bp-10-0589 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 19, 2010 | Permit id: Bp-10-1615 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: February 5, 2010 | Permit id: Bp-10-0085 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: March 18, 2010 | Permit id: Bp-09-1847 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: December 6, 2010 | Permit id: Bp-10-0872 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 19, 2010 | Permit id: Bp-10-1615 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 12, 2010 | Permit id: Bp-10-1642 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 20, 2010 | Permit id: Bp-10-0862 | |||||
SCORE 98 7914 Wellshire Court Niwot Co Install 110k btu 95% efficient furance, a 4-ton a/c, thermostat, and gal water heater Permit type: Air conditioning | Permit status: Complete | Completion date: October 19, 2009 | Permit id: Bp-09-1086 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit expired | Expiration date: January 17, 2013 | Permit id: Bp-10-0069 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: February 5, 2010 | Permit id: Bp-10-0085 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: February 12, 2010 | Permit id: Bp-10-0111 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: March 26, 2010 | Permit id: Bp-10-0320 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: April 8, 2010 | Permit id: Bp-10-0394 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: May 4, 2010 | Permit id: Bp-10-0429 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: July 9, 2010 | Permit id: Bp-10-0588 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: May 24, 2010 | Permit id: Bp-10-0589 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 20, 2010 | Permit id: Bp-10-0862 | |||||
SCORE 98 1372 Kilkenny Street Boulder Co Install furnace (71k - 95%) / install ac (2 1/2 ton) & condensate pump Permit type: Furnace | Permit status: Permit closed | Completion date: June 29, 2010 | Permit id: Bp-10-0959 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit complete | Completion date: January 10, 2013 | Permit id: Bp-10-1111 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: July 29, 2010 | Permit id: Bp-10-1112 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 17, 2010 | Permit id: Bp-10-1129 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: January 23, 2011 | Permit id: Bp-10-1233 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: February 27, 2011 | Permit id: Bp-10-1462 | |||||
SCORE 98 8435 Brittany Place Niwot Co 2 furnaces-91kbtu & a/c-3. 5ton & a/c-3ton & 2 t-stats & 2 air cleaners & 2 humidifires Permit type: Furnace | Permit status: Permit expired | Expiration date: January 17, 2013 | Permit id: Bp-10-1573 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: October 26, 2010 | Permit id: Bp-10-1651 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 19, 2011 | Permit id: Bp-10-1682 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 5, 2010 | Permit id: Bp-10-1696 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: March 28, 2011 | Permit id: Bp-10-1705 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: March 28, 2011 | Permit id: Bp-10-1715 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: December 20, 2010 | Permit id: Bp-10-1732 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: May 21, 2009 | Permit id: Bp-09-0476 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: November 10, 2009 | Permit id: Bp-09-1320 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: December 2, 2009 | Permit id: Bp-09-1699 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Complete | Completion date: May 11, 2009 | Permit id: Bp-09-0475 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: March 18, 2010 | Permit id: Bp-09-1147 | |||||
SCORE 98 Permit type: Furnace | Permit status: Expired | Expiration date: September 20, 2011 | Permit id: Bp-09-1242 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: November 12, 2009 | Permit id: Bp-09-1639 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit complete | Completion date: August 12, 2011 | Permit id: Bp-09-1838 | |||||
SCORE 98 Permit type: Furnace | Permit status: Complete | Completion date: January 22, 2010 | Permit id: Bp-10-0027 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: August 21, 2010 | Permit id: Bp-10-0221 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: March 24, 2010 | Permit id: Bp-10-0250 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: April 15, 2010 | Permit id: Bp-10-0393 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: May 20, 2010 | Permit id: Bp-10-0501 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: July 2, 2010 | Permit id: Bp-10-0824 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: July 12, 2010 | Permit id: Bp-10-0901 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: June 21, 2010 | Permit id: Bp-10-0915 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 3, 2010 | Permit id: Bp-10-0938 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: February 15, 2011 | Permit id: Bp-10-1022 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: December 18, 2010 | Permit id: Bp-10-0961 | |||||
SCORE 98 Permit type: Air conditioning | Permit status: Permit closed | Completion date: April 20, 2012 | Permit id: Bp-10-1079 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: August 4, 2010 | Permit id: Bp-10-1120 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit issued | Expiration date: February 7, 2011 | Permit id: Bp-10-1350 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: September 14, 2010 | Permit id: Bp-10-1477 | |||||
SCORE 98 Permit type: Furnace | Permit status: Permit closed | Completion date: November 4, 2010 | Permit id: Bp-10-1697 |