Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 6 Townsend St San Francisco Ca Remove and replace light fixtures install misc new devices. 19 lights 4 switches 8 recepacles. Date: April 10, 2015 Contractor: Conscious Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201504107689 | |||||
SCORE 67 Unit 425 / 6 Townsend St San Francisco Ca Cosmetic upgrade clean up existing ducting adjust existing supply line for new offices. Date: April 10, 2015 Contractor: Conscious Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20150410599 | |||||
SCORE 67 48 Fountain St San Francisco Ca Install catch basin area drain under slab (3) toilets (3) lavatories (2) tubs (1) shower backyard drainage and plumbing in kitchen 1 shower pan. Date: August 3, 2016 Contractor: Conscious Construction Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160803741 | |||||
SCORE 67 48 Fountain St San Francisco Ca Rewire (e) panel rewire 1st/2nd floors; 45 lights 24 switches 34 receptacles 1 dishwasher 4 fans 1 garbage disposal 1 microwave 1 range 3 smoke detectors. Date: August 3, 2016 Contractor: Conscious Construction Permit type: Electrical permit | Permit status: Issued | Permit id: E201608038725 |