Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 406 7th Street Nw Washington Dc Excavation; sewer lateral connection over 4" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; clean out (sewer), excavation; water meter pit (to 2" pipe), excavation; storm lateral conn over 4" (trench) Date: January 14, 2011 Contractor: Clover Contracting Permit status: 8 | Expiration date: May 25, 2011 | Permit id: Pa56591-R1 | |||||
SCORE 67 406 7th Street Nw Washington Dc Excavation; sewer lateral connection over 4" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; clean out (sewer), excavation; water meter pit (to 2" pipe), excavation; storm lateral conn over 4" (trench) Date: August 19, 2010 Contractor: Clover Contracting Permit status: 8 | Expiration date: October 30, 2010 | Permit id: Pa56591 | |||||
SCORE 67 406 7th Street Nw Washington Dc Suspended street requirement - extended restoration is required and limits of restoration to be identified by ddot wholecost inspector; after hours permit required - hours of work 7:30pm to 3:30am monday thru friday; install 6" fire and 3" domestic water service to existing 8" water main; install 6" sanitary sewer service to existing 12" sewer main; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. Date: July 14, 2010 Contractor: Clover Contracting Client: D. A. Foster Company | Permit type: Excavation; sewer lateral connection over 4" pipe | Permit status: Permit expired | Expiration date: October 30, 2010 | Permit id: Pa56591 | |||||
SCORE 67 406 7th Street Nw Washington Dc Suspended street requirement - extended restoration is required and limits of restoration to be identified by ddot wholecost inspector; after hours permit required - hours of work 7:30pm to 3:30am monday thru friday; install 6" fire and 3" domestic water service to existing 8" water main; install 6" sanitary sewer service to existing 12" sewer main; attached plans and conditions are part of this permit; traffic control plan (tcp) expiration date same as public space permit expiration date; must contact system inspection oversight division (siod) before start of work and before permanent restoration of public space at 202-645-7050; must apply and obtain occupancy permit before start of work. 1st - extension of permit number pa56591 Date: November 15, 2010 Contractor: Clover Contracting Client: D. A. Foster Company | Permit type: Excavation; sewer lateral connection over 4" pipe | Permit status: Permit expired | Expiration date: May 25, 2011 | Permit id: Pa56591-R1 |