Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 5 12th St Sw 10th Floor, Washington, Dc 20024 Demolition and interior modifications of secure guard enclosure of the existing 10th floor office area. Existing typical floor construction to remain with no change to existing exits or finishes outside of the limits of construction. Installation of a water source heat pump with a dedicated outside air connection to meet heating, cooling and ventilation loads of guard enclosure. Install individual electrical metering for heat pump. Total project sq ft is 3 sq ft Date: April 18, 2013 Contractor: Christopher Meade Client: Jones Lang Lasalle | Permit type: Addition alteration repair | Permit status: Completed | Permit id: B1305856 | |||||
SCORE 65 5 12th St Sw, Washington, Dc 20024 Provide rooftop generator and riser for tenant backup power requirements within one penthouses enclosure with 1811" high on the existing 12-floor & 3-lower level building. Reconfigure and provide transfer switches to allow backup power in case of non-emergency power shortage for portions of the building and specific equipment requirements per the tenant. Date: April 29, 2014 Contractor: Christopher Meade Client: Jones Lang Lasalle Jones Lang Lasalle | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1307908 | |||||
SCORE 65 5 12th St Sw 7th Floor, Washington, Dc 20024 Remove doors and walls as required to provide new layout. Remove ceiling in pcp secure room 7-503a. Provide blocking in walls for new wall mounted monitors. Electrical requirements for new equipment. New 24/7 hvac for 3 rooms. Date: July 30, 2013 Contractor: Christopher Meade Client: Charles Anoff Jones Lang Lasalle | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1309141 |