Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 811 9th St Boulder Co Reconfiguration of a full bathroom to split the shower tub combo into separate fixtures, reposition fixtures, relocate tempered. Includes associated electrical, mechanical and minor stucco repair. Client: Christophe Grasso | Applicant: Christophe Grasso | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d |