Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 293 Huron Ave Cambridge, Ma A storage area on the third floor will be enlarged to accommodate a 3/4 bathroom. Non-load bearing partitions will be removed and relocated. See attached 293 huron_detail. Pdf for additional information on work being done. A sink, shower stall and toilet will be installed. Permit type: Addition/alteration | Completion date: March 8, 2013 | Current use: Two-family | Parcel: 23214 | |||||
SCORE 61 293 Huron Ave Cambridge, Ma This application is in reference to building permit bldr-001008-2013. This appplication is for an amendment in plans. The amendment is for extending an additional 15. 5 inches into the adjacent bedroom (beyond the inches in the original plan). The reason for the change is to achieve adequate clearance between the toilet and entrance to the stall shower. Permit type: Addition/alteration | Completion date: April 3, 2013 | Current use: Two-family | Parcel: 23214 | |||||
SCORE 61 293 Huron Ave Cambridge, Ma A storage area on the third floor will be enlarged to accommodate a 3 4 bathroom. Non-load bearing partitions will be removed and relocated. See attached 293 huron_detail. Pdf for additional information on work being done. A sink, shower stall and toilet will be installed. Permit type: Addition/alteration | Completion date: March 8, 2013 | Current use: Two-family | Permit id: 0 | Parcel: 23214 |