Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 5 Normandie Ave Los Angeles Ca 90020 New methane gas control system. Electrical plan check for power. Date: October 11, 2011 Contractor: Chris Tekaat Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-004 | |||||
SCORE 89 52 Wilshire Blvd Los Angeles Ca 90036 New methane gas control system with modification. Electrical plan che Date: February 2, 2012 Contractor: Chris Tekaat Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-004 | |||||
SCORE 89 971 Yale St Los Angeles Ca 90012 Change the priviously approved plan. Change from level v to iv of meth Date: October 11, 2011 Contractor: Chris Tekaat Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 09041-10001-088 | |||||
SCORE 89 125 Branford St Los Angeles Ca 91352 Fed ex distributioncenter. Soil gas mitigation system for gateway/secu Date: December 9, 2011 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-208 | |||||
SCORE 89 2 Santa Fe Ave Los Angeles Ca 90012 Supplemental permit to 11010-10000-01774 to revise methane plan. No ch Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 11010-10001-017 | |||||
SCORE 89 Date: July 3, 2012 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 12042-10000-077 | |||||
SCORE 89 4174 Pico Blvd Los Angeles Ca 90019 Level 2 methane mitigation system for addition to existing building. Date: August 15, 2012 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 12042-10000-148 | |||||
SCORE 89 Date: August 26, 2011 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-004 | |||||
SCORE 89 Date: April 11, 2011 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-030 | |||||
SCORE 89 527 Molino St Los Angeles Ca 90013 Methane site venting system design level ii for a 2-story, (96,532 squ Date: February 7, 2013 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-158 | |||||
SCORE 89 527 Molino St Los Angeles Ca 90013 San Diego Ca Methane site venting system design level ii for a 2-story, (96,532 squ Date: February 7, 2013 Contractor: Chris Tekaat Permit status: Permit finaled | Current use: Commercial | Permit id: 11042-10000-158 | |||||
SCORE 89 12481 Fielding Cir Los Angeles Ca 90094 Installation of methane mitigation system for (4) story new apartment Date: June 26, 2014 Contractor: Chris Tekaat Permit type: Plumbing | Permit status: Permit finaled | Current use: Apartment | Permit id: 14042-10000-112 | |||||
SCORE 89 12481 Fielding Cir Los Angeles Ca 90094 San Diego Ca Installation of methane mitigation system for (4) story new apartment Date: June 26, 2014 Contractor: Chris Tekaat Permit status: Permit finaled | Current use: Apartment | Permit id: 14042-10000-112 |