Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 61 Various Locations Washington Dc This permit is granted to chevron productsc co. To authorize contractor gannet flemin to occupy portion of curb lane and use portion of alley sq 3735 for purpose of gauging and sampling existing groundwater monitoring wells total work zone ( 66 ) various location as per attached list. For public safety must maintain a safe work zone area atc all times. This permit does not auhtorize excavation of wells in public sapce. Time: 7;00am to 7:00pm mon thru fri. ![]() ![]() Permit type: Occupancy; to park vehicles, occupancy; temppark | Permit status: Permit expired | Expiration date: February 27, 2008 | Permit id: Pa28671 | |||||
SCORE 61 40 Georgia Avenue Nw Washington Dc Scope of work; extension of permit#p013437. The scope of work includes the usage of a geoprobe to collect soil & ground water samples at(ten) locations attached plans and conditions are part of this permit."limits of restoration must meet district standards unless extended by oio; 202-645-7050" ![]() ![]() Permit type: Excavation; extension of permit | Permit status: Permit expired | Expiration date: September 23, 2007 | Permit id: Pa28752 | |||||
SCORE 61 9 Florida Avenue Nw Washington Dc The scope of work includes temp occupancy of the parking lane along w st,nw to abandon two existing monitoring wells. Each locations will be occupied for approx. 1 hour. Attached plans and conditions are part of this permit ![]() ![]() Permit type: Occupancy; temppark, excavation; abandon monitoring wells, excavation; abandon monitoring wells | Permit status: Permit expired | Expiration date: December 12, 2007 | Permit id: Pa29795 |