Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1331 2nd St Se, Washington, Dc 20003 This design package is for the 1 percent design requirements for the support of excavation soe for odor control chamber. This soe is in the vicinity of the main sewer conduit located approximately ft. To the sw of the odor control structure. Design specification requirements are given within specification sections and 01015. 2. 2. C, parts a through e. P. 14 of report. The soe consists of steel sheet piling exterior perimeter wall supported internally with 3 levels of cross lot structural steel w section and pipe bracing. Date: April 19, 2017 Contractor: Carlton Ray Dc Water Client: Carlton Ray Dc Water | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1700015 |