Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 75 Client: Tom Green | Permit id: 498 | |||||
SCORE 75 168 Lakeview Ave Cambridge, Ma Remove existing 8x front porch,three new footings 12" sonatubes at 4 deep,pt 4"x6" columns supporting triple pt 2"x8" girder, framing is 2"x8" pt at 16" o. C. Ledger will be screwed to house sill using timberlock ledger lags 12" o. C.,three new 4"x4" columns supporting roof above, stringers are pt. 2x12 at 16" o. C. On 4" concrete pad, decking is 1"x4" mahogany screwed with ss screws, stair treads are 5/4" x 6" mahogany,rails are 36" height mahogany with 2"x2" balusters 4"o. C.,stair rails at 36" height with 1 1/4" sub rail at 34",treads will be 11 1/4" and risers will be 7 1/4",skirt boards will be 1"x8" and lower section will be either lattice or 1x4 verticals. Permit type: Addition/alteration | Completion date: April 15, 2014 | Current use: One-family | Parcel: 23450 | |||||
SCORE 75 19 Brewster St Cambridge, Ma Remove 1/2 first floor claps, remove 1 sf shingles, replace front first floor trim and exterioe details, replace sf second floor decorative shingles, replace first floor corner boards and 1/2 of first floor window trim, replace all first floor water table,replace front entrance porch rails, columns,stair stringers, and decking, replace second floor rear porch(48 sf) decking and rails, replace third floor (25sf ) porch decking and rails,replace 26 lf of soffit,replace lf of rake return soffit and fascia,replace one basement window Permit type: Addition/alteration | Completion date: June 16, 2014 | Current use: One-family | Parcel: 22358 | |||||
SCORE 75 168 Lakeview Ave Cambridge, Ma Remove existing 8x front porch,three new footings 12" sonatubes at 4 deep,pt 4"x6" columns supporting triple pt 2"x8" girder, framing is 2"x8" pt at 16" o. C. Ledger will be screwed to house sill using timberlock ledger lags 12" o. C.,three new 4"x4" columns supporting roof above, stringers are pt. 2x12 at 16" o. C. On 4" concrete pad, decking is 1"x4" mahogany screwed with ss screws, stair treads are 5 4" x 6" mahogany,rails are 36" height mahogany with 2"x2" balusters 4"o. C.,stair rails at 36" height with 1 1 4" sub rail at 34",treads will be 11 1 4" and risers will be 7 1 4",skirt boards will be 1"x8" and lower section will be either lattice or 1x4 verticals. Permit type: Addition/alteration | Completion date: April 15, 2014 | Current use: One-family | Permit id: 0 | Parcel: 23450 | |||||
SCORE 75 19 Brewster St Cambridge, Ma Remove 1 2 first floor claps, remove 1 sf shingles, replace front first floor trim and exterioe details, replace sf second floor decorative shingles, replace first floor corner boards and 1 2 of first floor window trim, replace all first floor water table,replace front entrance porch rails, columns,stair stringers, and decking, replace second floor rear porch(48 sf) decking and rails, replace third floor (25sf ) porch decking and rails,replace 26 lf of soffit,replace lf of rake return soffit and fascia,replace one basement window Permit type: Addition/alteration | Completion date: June 16, 2014 | Current use: One-family | Permit id: 0 | Parcel: 22358 | |||||
SCORE 75 2575 Massachusetts Ave Cambridge, Ma Replace existing second egress exterior stairs with same. Stringers are 2x12 p. T.,decking is composite 5 4x6,risers are 1x8 pvc,rails(36" height) and balusters are p. T. With balusters 4oc,platform footings will be 10" sonatube 4-00" in depth and platform width will be 36" measured from inside of rail posts and 36 " length. Permit type: Addition/alteration | Completion date: November 15, 2016 | Current use: Two-family | Permit id: 0 | Parcel: 18626 | |||||
SCORE 75 43 Marshall St Somerville Ma Re build front steps using 2x12 pt 16 "oc,railings will be mahogany at 36" height and have balusters 4"oc, treads will be 11. 5" 5/4 x 6" mahogany risers will be 1x 8" azek, Permit type: Building | Permit status: Issued | Expiration date: February 4, 2015 | Permit id: B14-000482 |