Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 63 1 Northern Av Boston Ma 02210 Sidewalk deposit during construction / this is not a permit to excavate occupy or install driveways - separate permits are required.; deposit will be held until restored sidewalks are inspected and approved by a pwd engineer.; permit fee 60. 00; inspection 1 600. 00; deposit; 245 070. 00; 5 [h-ramps ]; 000. 00; contractor; turner construction; for fallon. ![]() ![]() Permit type: Sidewalk deposit | Permit status: Na | Permit id: Sdep-408532 | Parcel: 0602671050 | |||||
SCORE 63 0 Northern Av Boston Ma Roadway deposit for the milling and paving of northern avenue at pier 4 boulevard ; deposit will be held on account until pwd engineers inspect and verify the work was done to city and ada standards.; permit; 60. 00; inspection:; 500. 00; deposit; 26 334. 42 ![]() ![]() Client: Mass Port Authority | Permit type: Sidewalk deposit | Permit id: Sdep-614976 | Parcel: 0602680120 | |||||
SCORE 63 1 Northern Av Boston Ma Sidewalk deposit during construction / this is not a permit to excavate occupy or install driveways - separate permits are required.; deposit will be held until restored sidewalks are inspected and approved by a pwd engineer.; permit fee 60. 00; inspection 1 600. 00; deposit; 245 070. 00; 5 [h-ramps ]; 000. 00; contractor; turner construction; for fallon. ![]() ![]() Client: Pier Four Inc | Permit type: Sidewalk deposit | Permit id: Sdep-408532 | Parcel: 0602671050 |