Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 29 Georgia Avenue Nw Washington Dc The new apartment / condominium structure proposes two new bay window projections 6-11" (proj.) x 12-7" (w); 4-10" (proj.) x 11-3" (w); and canopy approximately 1-6" (proj.) x 12-0" (w) +/- along georgia ave., nw. The new work shall also include removing one existing curb cut along georgia ave., nw and one curb cut along hobart st., nw; new curbs shall be installed to match existing adjacent curbs; one new curb cut for entrance to the driveway will be installed along hobart st., nw and will include a 6-0" wide flared pedestrian safety island; the existing 7-0"+/- brick sidewalk along georgia ave., nw, will be repaired as needed; the 8 to wide concrete sidewalk along georgia ave., and 5 wide concrete sidewalk along hobart street will be replaced; two new trees will be installed per plans; the existing ada ramp will be replaced to align with the ada ramp directly across hobart street, nw, per plans; two existing parking meters will be relocated and replaced with new meters; the accompany Date: April 25, 2012 Contractor: C O Art Linde Asl Development Corporation Client: Art Linde | Permit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Permit expired | Expiration date: June 3, 2013 | Permit id: Pa71542 |