Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Date: April 15, 2011 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201104154296 | |||||
SCORE 100 1442 14th Av San Francisco Ca Replace bathroom vanity sink and kitchen sink new faucetwss. Relocate (e) stove gas into new cabinet. Reconnect microwave exhaust into (e) flue. Add new fan in bathroom. Date: April 29, 2015 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150429171 | |||||
SCORE 100 Date: December 20, 2012 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20121220949 | |||||
SCORE 100 496 Urbano Dr San Francisco Ca To obtain a final inspection for work completed under expired permit pp20121220949. Date: January 10, 2014 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140110303 | |||||
SCORE 100 1566 Plymouth Av San Francisco Ca To comply with nov201277201: to renew 482385: amend pp20130122574 - cap plumbing under p482385 and relocate the bathroom & laundry on pp20130122574 and install a tankless waterheater. Date: March 19, 2013 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130319157 | |||||
SCORE 100 6 Sacramento St San Francisco Ca Relocate existing toilet to comply with ada plans. Replace toilets to be ada compliant & stall to be ada compliant - sinks replace to be ada. Date: October 1, 2013 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20131001638 | |||||
SCORE 100 1313 Palou Av San Francisco Ca Remodel existing bath and kitchen add (1) bathroom on 1st and 2nd floor 12 switches 12 lights 25 receptacles 3 fans 1 dishwasher 1 garbage disposal 4 smoke detectors ref 201604195096. Date: September 1, 2016 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201609019417 | |||||
SCORE 100 1311 Palou Av San Francisco Ca Remodel existing bath and kitchen add (1) bathroom on 1st and 2nd floor 12 switches 12 lights 25 receptacles 3 fans 1 dishwasher 1 garbage disposal 4 smoke detectors ref 201604195096. Date: September 1, 2016 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201609019418 | |||||
SCORE 100 1311 Palou Av San Francisco Ca Units 1311-1313: remodel existing bath and kitchen add (1) bathroom on 1st and 2nd floor 2 shower pans ref e201609019417 201604195096. Date: September 1, 2016 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160901603 | |||||
SCORE 100 1076 Noe St San Francisco Ca Replace (e) pedestal sink & toilet with (n) pedestal sink and low flow 1. 6 gallon toilet. Change shsower /tub valve to single control valve. Date: April 15, 2011 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20110415506 | |||||
SCORE 100 1442 14th Av San Francisco Ca Bathroom ktichen on 1/f: 2-12/2 feeders 5 lights 1 siwtche 4 receptacles 1 fan. Date: April 29, 2015 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201504298194 | |||||
SCORE 100 Date: April 29, 2015 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201504298193 | |||||
SCORE 100 Date: April 29, 2015 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20150429170 | |||||
SCORE 100 1313 Palou Av San Francisco Ca 1313a palou ave: remodel unit 23 lights 16 switches 23 receptacles 4 fans 1 dishwasher 1 range 3 smoke detectors. Date: December 22, 2017 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201712229872 | |||||
SCORE 100 Date: December 7, 2017 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Complete | Permit id: Pm20171207930 | |||||
SCORE 100 Date: December 22, 2017 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20171222429 | |||||
SCORE 100 A / 1313 Palou Av San Francisco Ca Add new bathroom and laundry remodel bath and kitchen 1 waterheater (1) shower pann. Date: December 22, 2017 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20171222430 | |||||
SCORE 100 496 Urbano Dr San Francisco Ca As built new plug/lighting 2 fans on ground level space (n) habitable - 26 lights 6 switches 8 receptacles 2 fans 1 dishwasher 1 microwave 1 smoke detectors - 2 amps Date: December 20, 2012 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201212207377 | |||||
SCORE 100 1566 Plymouth Av San Francisco Ca Grnd level/street: im existing basement: 4 circuits 6 lights 6 switches 8 receptacles 1 fan Date: January 22, 2013 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201301227904 | |||||
SCORE 100 Date: January 22, 2013 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130122574 | |||||
SCORE 100 Unit 0 / 329 Richland Av San Francisco Ca Basic remodel in-kind add switch for (n) fan add 1 circuit for (n) floor heat matt replace (e) switch to (e) lights & celing add a 4" can light relocate 1 receptacle Date: January 20, 2017 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201701202402 | |||||
SCORE 100 Unit 0 / 329 Richland Av San Francisco Ca Replace shower drain & pan replace sink vanity replace toilet Date: January 20, 2017 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170120330 | |||||
SCORE 100 1566 Plymouth Av San Francisco Ca To comply with nov 201277201: amend e201301227904: to rewire garage/basement into habitable space. Date: March 19, 2013 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201303199307 | |||||
SCORE 100 119 Ripley St San Francisco Ca 1 f: new office bathroom to (e) storage space: new lights switches receptacles. Date: March 29, 2017 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201703283876 | |||||
SCORE 100 Date: March 28, 2017 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20170328090 | |||||
SCORE 100 Date: November 29, 2017 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201711299355 | |||||
SCORE 100 Date: November 29, 2017 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Complete | Permit id: Pp20171129701 | |||||
SCORE 100 6 Sacramento St San Francisco Ca 2/f: tenant improvement: men/womens bathroosm: 1 switches 2 receptacles 2 fans. Date: October 1, 2013 Contractor: Building By Design Permit type: Electrical permit | Permit status: Issued | Permit id: E201310014044 | |||||
SCORE 100 6 Sacramento St San Francisco Ca 2/f: (e) mens & womens bathrooms: relocate one gfci plug in mens bathroom & lower switch. Womens existing switche; replace with motion switch sensor . Date: October 31, 2013 Contractor: Building By Design Permit type: Electrical permit | Permit status: Cancelled | Permit id: E201310284706 | |||||
SCORE 100 6 Sacramento St San Francisco Ca 2/f: relocate (e) toilet in mens bathroom for ada compliance. Replace existing sinks to ada compliance; replace existing toilet in womens for ada compliance. Date: October 28, 2013 Contractor: Building By Design Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20131028437 |