SCORE 62 15075 Ne 24th St Redmond, Wa 98052 Install new concrete pole with new street light. Pull new #6 ug triplex in existing pre-installed conduit. Date: October 17, 2014 Contractor: Bryan Waters Applicant: Joe Belcher | Permit type: Right of way | Permit id: Row-2014-08312 | Parcel: 3927200210 | |||||
SCORE 62 150 Block Of Ne 24th St Redmond, Wa 98052 Install new concrete pole with new street light. Pull new #6 underground triplex in existing pre-installed conduit. Remove existing sidewalk seam to seam to remove existing pse wood pole. After installing new street light pole pour new sidewalk with 2x2 block out for new grouting around street light pole. Date: March 4, 2015 Contractor: Bryan Waters Applicant: Joe Belcher | Permit type: Right of way | Permit id: Row-2015-01253 | Parcel: 3927200230 |