Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 4601 Martin Luther King Jr Ave Sw, Washington, Dc 20032 1. Interior demolition will include gypsum wall board partitions, doors and frames, mill-work cabinets, ceiling finishes, carpet flooring, restrooms, duct work. 2. Exterior demolition will include railing by stairs, sheet metal roof and walls. All load bearing walls and steel structure will remain. Date: March 6, 2017 Contractor: Bridgepoint Healthcare; Gustavo Rodriguez Client: N A Bridgepoint Healthcare | Permit type: Demolition | Permit status: Permit issued | Permit id: D1700317 |