Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 21 Pennsylvania Avenue Nw Washington Dc The proposed streetscape improvements along penn ave are all to be per dc ddot standards and specifications, the work will include new tree pits, scored concrete sidewalk, and a small leadwalk (in front of the main entrance) that spans less than 1 3 of the total width of the sidewalk. The public alley (off of eye street) is to be re-paved per dc ddot concrete alley standards, and also receive an entrance reconstruction (also per dc ddot standards and specifications). Date: January 17, 2017 Contractor: Brad Mason Permit status: Permit expired | Expiration date: April 13, 2017 | Permit id: Pa102757-R2 |