Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 2352 Tedeschi Dr Santa Rosa Ca Install 3 ton 14 seer r-410a air conditioning. Ac coil to be installed on existing furnace. Date: March 20, 2013 Contractor: Bishop Hal Permit status: Finaled | Permit id: B13-1000 | |||||
SCORE 77 1881 Los Olivos Rd Santa Rosa Ca Replace duct system with new properly sized flexible duct system and replace furnace with 95% afue, 70k btu unit Date: November 13, 2012 Contractor: Bishop Hal Permit status: Finaled | Permit id: B12-4089 | |||||
SCORE 77 Date: January 3, 2012 Contractor: Bishop Hal Permit status: Finaled | Permit id: B12-0023 | |||||
SCORE 77 1024 Saint Helena Ave Santa Rosa Ca Install new 95% afue high efficiency furnace and new duct system. Date: March 15, 2012 Contractor: Bishop Hal Permit status: Finaled | Permit id: B12-0823 | |||||
SCORE 77 444 10th St Santa Rosa Ca Replace air handler and rooftop heat pump condenser with new high efficiencty air handler and heat pump cannot be seen from street. Date: August 28, 2013 Contractor: Bishop Hal Permit type: Roof | Permit status: Finaled | Permit id: B13-3372 | |||||
SCORE 77 Date: June 25, 2012 Contractor: Bishop Hal Permit status: Finaled | Permit id: B12-2079 | |||||
SCORE 77 1472 Glenbrook Dr Santa Rosa Ca Replace existing furnace with new 95% afue 70,0 btu 3 ton high efficiency furnace and replace thermostat with setback thermostat. Date: December 20, 2013 Contractor: Bishop Hal Permit status: Finaled | Permit id: B13-5160 | |||||
SCORE 77 4475 Hoen Ave Santa Rosa Ca Replace furnace with new 95% afue high efficiency furnace and replace duct system. Date: February 15, 2013 Contractor: Bishop Hal Permit status: Issued | Permit id: B13-0578 |