SCORE 73 1333 Euclid Street Nw Washington Dc Excavate for water and sewer connection if front of 1333 euclid street nw Contractor: Bellview Development Llc Permit status: Cancel/withdrawn | Expiration date: October 8, 2012 | Permit id: 0 | |||||
SCORE 73 1333 Euclid Street Nw Washington Dc Refer to approved traffic control plan (tcp) for permitted hours of work; install 2" combined (fire and domestic) water service to 6" water main with water meter; attached plans and conditions are part of this permit Date: December 4, 2012 Contractor: Bellview Development Llc Permit status: Permit expired | Expiration date: February 2, 2013 | Permit id: Pa77047 | |||||
SCORE 73 1333 Euclid Street Nw Washington Dc 1st - extension of permit number pa77047 (77047r1=79117); refer to approved traffic control plan (tcp) for permitted hours of work; install 2" combined (fire and domestic) water service to 6" water main with water meter; attached plans and conditions are part of this permit Date: February 7, 2013 Contractor: Bellview Development Llc Permit status: Permit expired | Expiration date: April 3, 2013 | Permit id: Pa77047-R1 | |||||
SCORE 73 229 E Street Ne Washington Dc Excavate trenches for new water and sewer lines and connect to laterals. Please note, there is no construction in the tree box area. Water connection is outside tree box and sewer connection is in the sidewalk before the three box and sewer work will also be done outside the tree box area. Contractor: Bellview Development Llc Permit status: Assigned | Expiration date: August 17, 2017 | Permit id: 0 | |||||
SCORE 73 1333 Euclid Street Nw Washington Dc Excavate for water and sewer connection if front of 1333 euclid street nw Contractor: Bellview Development Llc Permit status: Cancel/withdrawn | Expiration date: October 8, 2012 | Permit id: 0 | |||||
SCORE 73 229 E Street Ne Washington Dc Excavate trenches for new water and sewer lines and connect to laterals. Please note, there is no construction in the tree box area. Water connection is outside tree box and sewer connection is in the sidewalk before the three box and sewer work will also be done outside the tree box area. Date: July 5, 2017 Contractor: Bellview Development Llc Permit status: Permit expired | Expiration date: September 7, 2017 | Permit id: Pa204116 |