Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 73 Date: March 1, 2016 Contractor: Banner Electric Inc Permit type: Electrical | Permit status: Permit issued | Expiration date: March 1, 2017 | Current use: Single family / duplex | Permit id: 6521508 | |||||
SCORE 73 2115 N 92nd St Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 7. 38 kw grid tied solar project Date: February 26, 2014 Contractor: Banner Electric Inc Permit type: Electrical | Permit status: Permit closed | Completion date: April 8, 2014 | Expiration date: February 26, 2015 | Current use: Single family / duplex | Permit id: 6406014 | |||||
SCORE 73 8316 54th Ave S Seattle Wa A one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 6. 8 kw grid tied solar system connected to 2 amp electrical service Date: November 6, 2013 Contractor: Banner Electric Inc Permit type: Electrical | Permit status: Permit closed | Completion date: November 21, 2013 | Expiration date: November 6, 2014 | Current use: Single family / duplex | Permit id: 6390896 | |||||
SCORE 73 Date: April 6, 2017 Contractor: Banner Electric Inc Client: Cary & Ernestine Smith Davis | Current use: Single fam res-clust-zero lot-town house | Permit id: 2017035481 |