SCORE 100 1124 Columbia St Seattle Wa Interior non-structural alterations to suite 2 (rooms 243 & 245) on second floor of r & d office building, per plans. Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6366033 | |||||
SCORE 100 1551 Eastlake Ave E Seattle Wa Non structural tenant improvement to install new enclosed offices, doors and other alterations on portion of the 3rd floor of commercial bldg, per plans. Applicant: Tully, Tricia | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6322369 | |||||
SCORE 100 1511 6th Ave Seattle Wa Tenant improvement to existing office 4th floor (synapse)per floor plan. Subject to field inspections. Stfi Applicant: Johnson, Chuck | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6308259 | |||||
SCORE 100 1511 6th Ave Seattle Wa Construct interior alterations to create two tenant spaces at third floor of existing commercial building, and occupy per plans. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6293377 | |||||
SCORE 100 Applicant: Smith, Kathryn (kate) | Permit type: Construction | Permit status: Permit closed | Current use: Multifamily | Permit id: 6253686 | |||||
SCORE 100 219 Pontius Ave N Seattle Wa Demolish existing single family and office building per subject to field Date: July 29, 2011 Contractor: B N Builders Inc Applicant: Smith, Kathryn (kate) | Permit type: Demolition | Permit status: Permit closed | Current use: Multifamily | Permit id: 6290878 | |||||
SCORE 100 199 E Blaine St Seattle Wa Construct tenant improvements to existing commercial building on the north side of floor 1, per plan. Applicant: Hutschreider, Adam | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6265132 | |||||
SCORE 100 5 Fairview Ave N Seattle Wa Tenant improvement to 4th floor per of existing lab and lab support rooms per floor plan. Subject to field inspections. Stfi Applicant: Wood, Stephen | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6269881 | |||||
SCORE 100 219 Terry Ave N Seattle Wa Non-structural removal of interior partitions, equipment, fixtures and other, per floor plans, subject to field inspection. Applicant: Lemaster, Patrick | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6268250 | |||||
SCORE 100 401 Terry Ave N Seattle Wa Interior tenant improvements with structural modifications to 1st, 3rd and 4th floors of existing office (institute for systems biology), change use of portion of existing office to r & d labs, bldg per plan. Applicant: Duffett, Grace | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6241584 | |||||
SCORE 100 1926 6th Ave S Seattle Wa Tenant improvement to existing commercial building, subject to field inspection (stfi). Applicant: Robinson, Grace | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6490761 | |||||
SCORE 100 19 6th Ave S Seattle Wa Demolition of non-structural partition walls, subject to field inspection (stfi). Applicant: Wyman, Jennifer | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6497979 | |||||
SCORE 100 24 6th Ave S Seattle Wa Change use from warehouse to light manufacturing and construct substantial alterations to existing commercial building, and occupy per plan. Applicant: Wyman, Jennifer | Permit type: Construction | Permit status: Permit issued | Current use: Commercial | Permit id: 6466701 | |||||
SCORE 100 401 Terry Ave N Seattle Wa Tenant improvements to the ne portion of the 2nd floor of the existing commercial building subject to field inspection (stfi). Applicant: Pangborn, Liisa | Permit type: Construction | Permit status: Permit closed | Completion date: June 27, 2016 | Expiration date: November 11, 2017 | Current use: Commercial | Permit id: 6534424 | |||||
SCORE 100 1124 Columbia St Seattle Wa Construct tenant improvements to existing commercial office building, subject to field inspection. Applicant: Duffy, John | Permit type: Construction | Permit status: Permit closed | Completion date: March 31, 2016 | Expiration date: September 17, 2017 | Current use: Commercial | Permit id: 6524149 | |||||
SCORE 100 401 Terry Ave N Seattle Wa Construct alterations to eastern portion of 2nd level of existing commercial building and change the use from office to research and development lab, per plan. Applicant: Seng, Dan | Permit type: Construction | Permit status: Initial information colle | Expiration date: November 10, 2017 | Current use: Commercial | Permit id: 6502383 | |||||
SCORE 100 1124 Columbia St Seattle Wa Construction of seperation wall for conference room training room located on level 1 (eastside) per floor plan, subject to field inspection (stfi). Applicant: Schneider, Evan | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6451251 | |||||
SCORE 100 101 Elliott Ave W Seattle Wa Closed as incomplete - expired permit. On 3rd floor soft demo and non-structural interior tenant improvements per floor plans. Subject to field inspection. Applicant: Furukawa, Arthur | Permit type: Construction | Permit status: Permit closed | Expiration date: May 3, 2011 | Current use: Commercial | Permit id: 6232011 | |||||
SCORE 100 2601 4th Ave Seattle Wa Tenant improvements for partial change of use from office to research laboratory 5th floor of existing commercial building, per plan Applicant: Robinson, Sara | Permit type: Construction | Permit status: Permit closed | Completion date: November 23, 2009 | Expiration date: January 24, 2011 | Current use: Commercial | Permit id: 6192755 | |||||
SCORE 100 5 Fairview Ave N Seattle Wa Initial tenant improvement to floors (4) and (5) for research and development laboratory & occupy per plan Applicant: Wood, Stephen | Permit type: Construction | Permit status: Permit closed | Completion date: May 18, 2009 | Expiration date: July 27, 2010 | Current use: Commercial | Permit id: 6201789 | |||||
SCORE 100 16 Fairview Ave E Seattle Wa Construct interior alterations to create office space, per floor plan, subject to field inspection (stfi). Applicant: Baresh, Rachel | Permit type: Construction | Permit status: Permit closed | Completion date: January 14, 2009 | Expiration date: June 10, 2010 | Current use: Industrial | Permit id: 6203354 | |||||
SCORE 100 Applicant: Hessler, Judy | Permit type: Construction | Permit status: Permit closed | Completion date: July 2, 2009 | Expiration date: July 9, 2010 | Current use: Commercial | Permit id: 6191795 | |||||
SCORE 100 19 9th Ave Seattle Wa Alterations to portion of research and development laboratory, including raised floor slab and mechanical alteration, per plan. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: September 24, 2008 | Expiration date: February 6, 2010 | Current use: Institutional | Permit id: 6187948 | |||||
SCORE 100 Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: April 3, 2009 | Expiration date: February 6, 2010 | Current use: Commercial | Permit id: 6175866 | |||||
SCORE 100 Applicant: Sebenik, Jeff | Permit type: Construction | Permit status: Permit closed | Completion date: March 11, 2008 | Expiration date: August 20, 2009 | Current use: Commercial | Permit id: 6170962 | |||||
SCORE 100 1124 Columbia St Seattle Wa Non-structural interior alteration to portion of 3rd floor research and development laboratory per plan. Applicant: Baker, Herbert | Permit type: Construction | Permit status: Permit closed | Completion date: October 30, 2007 | Expiration date: January 18, 2009 | Current use: Commercial | Permit id: 6132841 | |||||
SCORE 100 4 Elliott Ave W Seattle Wa Voluntary seismic upgrade to existing office research and development building, per plan Applicant: Harasimowicz, Ryan | Permit type: Construction | Permit status: Permit closed | Completion date: July 24, 2007 | Expiration date: November 25, 2008 | Current use: Commercial | Permit id: 6134896 | |||||
SCORE 100 1823 E Madison St Seattle Wa Initial tenant improvements for medical service office 3rd floor north end of existing mixed-used bldg and occupy per plan. Applicant: Tan, Ming | Permit type: Construction | Permit status: Permit closed | Completion date: August 14, 2007 | Expiration date: December 15, 2008 | Current use: Commercial | Permit id: 6136888 | |||||
SCORE 100 Applicant: Baresh, Rachel | Permit type: Construction | Permit status: Permit closed | Completion date: July 23, 2007 | Expiration date: October 10, 2008 | Current use: Commercial | Permit id: 6135418 | |||||
SCORE 100 16 Fairview Ave E Seattle Wa Commercial ti of 3rd floor research, office space and including hvac and addition of mechanical units on the roof per plan. Applicant: Stock, Bruce | Permit type: Construction | Permit status: Permit closed | Completion date: April 30, 2008 | Expiration date: June 3, 2009 | Current use: Commercial | Permit id: 6104262 | |||||
SCORE 100 151 S Royal Brougham Way Seattle Wa Interior alterations to suites 8 - 15 and at the club level above, per plans Applicant: Sager, Thomas | Permit type: Construction | Permit status: Permit closed | Completion date: March 21, 2007 | Expiration date: July 12, 2008 | Current use: Commercial | Permit id: 6116802 | |||||
SCORE 100 1616 Eastlake Ave E Seattle Wa Structural commercial ti to north half of third floor, construction of walls, ceilings, finishes, etc to laboratory and admin office spaces for uw d. Of global health including mech hvac & fume hood permit occupy per plans Applicant: Harasimowicz, Ryan | Permit type: Construction | Permit status: Permit closed | Completion date: February 21, 2008 | Expiration date: March 15, 2008 | Current use: Commercial | Permit id: 6099087 | |||||
SCORE 100 2401 4th Ave Seattle Wa Change of use from administrative office to research and development lab for convert (south portion of 11th floor) from office to lab. Partition alterations at the 10th floor of the existing office use and occupy per plans (including mechanical). Applicant: Hessler, Judy | Permit type: Construction | Permit status: Permit closed | Completion date: February 23, 2007 | Expiration date: February 7, 2008 | Current use: Commercial | Permit id: 6085123 | |||||
SCORE 100 3 W Harrison St Seattle Wa Substantial alteration to change use from adminsitrative office to religious facility - occupy per plans. Structural upgrades under 6078439. Applicant: Robinson, Grace | Permit type: Construction | Permit status: Permit closed | Completion date: June 4, 2010 | Expiration date: December 23, 2010 | Current use: Commercial | Permit id: 6081285 | |||||
SCORE 100 3 W Harrison St Seattle Wa Substantial alterations - seismic upgrades for existing administrative office per plans. Change of use and interior alterations from to religious facility to be under separate permit. Applicant: Robinson, Grace | Permit type: Construction | Permit status: Permit closed | Completion date: May 17, 2010 | Expiration date: September 24, 2011 | Current use: Commercial | Permit id: 6078439 | |||||
SCORE 100 16 Fairview Ave E Seattle Wa Shoreline substantial development application to allow hvac mechanical unit on the roof. Date: December 3, 2007 Contractor: B N Builders Inc Applicant: Stock, Bruce | Permit type: Shoreline development | Permit status: Permit closed | Current use: Multifamily | Permit id: 3006595 | |||||
SCORE 100 Date: June 10, 2015 Contractor: B N Builders Inc Applicant: B N Builders Inc | Permit type: Side sewer | Permit status: Permit issued | Expiration date: December 10, 2016 | Current use: Commercial | Permit id: 6478622 | |||||
SCORE 100 199 E Blaine St Seattle Wa Connect to existing 6 inch ss per approved plan. Drainage to be obtained seperatly. Date: November 20, 2008 Contractor: B N Builders Inc Applicant: B N Builders Inc | Permit type: Side sewer | Permit status: Permit closed | Completion date: January 20, 2009 | Expiration date: May 20, 2010 | Current use: Commercial | Permit id: 6201600 | |||||
SCORE 100 199 E Blaine St Seattle Wa Closed as incomplete - expired permit. New commercial bldg 50k sq ft dewater wells to baker tank to storm Date: February 24, 2008 Contractor: B N Builders Inc Applicant: B N Builders Inc | Permit type: Side sewer | Permit status: Permit closed | Expiration date: August 24, 2009 | Current use: Commercial | Permit id: 6168755 | |||||
SCORE 100 1616 Eastlake Ave E Seattle Wa Install one vav box plus six feet ductwork add two return rills and one supply grill. Applicant: B N Builders Inc | Permit type: Mechanical | Permit status: Permit finaled | Completion date: June 14, 2007 | Expiration date: November 7, 2008 | Current use: Commercial | Permit id: 6138436 | |||||
SCORE 100 2601 4th Ave Seattle Wa Interior non-structural alterations on 5th floor for "onconthyreon" subject to field inspection (stfi). Applicant: Baresh, Rachel | Permit type: Construction | Permit status: Permit closed | Completion date: January 7, 2010 | Expiration date: January 21, 2010 | Current use: Commercial | Permit id: 6188474 | |||||
SCORE 100 19 9th Ave Seattle Wa Interior alterations to lobby on 1st floor for "seattle childrens research institute", per plan. Mechanical included Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit closed | Completion date: May 4, 2009 | Expiration date: May 24, 2010 | Current use: Commercial | Permit id: 6194084 | |||||
SCORE 100 921 Terry Ave Seattle Wa Construct interior alterations to existing tenant space on 4th floor ("psbc central"), subject to field inspection. Applicant: Stapper, Jim | Permit type: Construction | Permit status: Permit closed | Completion date: March 6, 2012 | Current use: Commercial | Permit id: 6299478 | |||||
SCORE 100 1616 Eastlake Ave E Seattle Wa Tenant improvement on the 2nd floor to create waiting area and office, "research and development lab", subject to field inspections. Stfi. Tenant: accelerator. Applicant: Buchanan, James | Permit type: Construction | Permit status: Permit closed | Completion date: June 15, 2007 | Expiration date: November 3, 2008 | Current use: Commercial | Permit id: 6138160 | |||||
SCORE 100 41 Roosevelt Way Ne Seattle Wa Closed as incomplete - expired permit. Construct alterations to hotel room restrooms and finishes at floors two through four in existing hotel (university inn), per plan. Applicant: Fulkerson, Kendahl | Permit type: Construction | Permit status: Permit issued | Current use: Commercial | Permit id: 6414545 | |||||
SCORE 100 Date: August 22, 2017 Contractor: B N Builders Inc Applicant: B N Builders Inc | Permit type: Boiler / pressure vessel | Permit status: Permit closed | Completion date: September 19, 2017 | Expiration date: February 22, 2019 | Current use: Commercial | Permit id: 6614695 | |||||
SCORE 100 1124 Columbia St Seattle Wa Alterations and renovation to existing office / lab space, first and second floors of the seattle life sciences bldg, per plan. Applicant: Forfylow, Dana | Permit type: Construction | Permit status: Permit closed | Completion date: December 20, 2007 | Expiration date: December 28, 2008 | Current use: Commercial | Permit id: 6126564 | |||||
SCORE 100 1551 Eastlake Ave E Seattle Wa Construct tennant improvements to exising office building at floors 2 & 3 (mechanical permit included), per plan. Applicant: Harasimowicz, Ryan | Permit type: Construction | Permit status: Permit issued | Current use: Commercial | Permit id: 6299476 | |||||
SCORE 100 1147 N 81st St Seattle Wa Construct an addition and alterations to an existing religious school, per plans. (mechanical included this permit) Applicant: Mattheis, Cory | Permit type: Construction | Permit status: Application accepted | Current use: Institutional | Permit id: 6449977 | |||||
SCORE 100 12 1st Ave S Seattle Wa Construct alterations to concessions and concourse at street level north side of safeco field, per plans. Applicant: Capestany, Roger | Permit type: Construction | Permit status: Permit closed | Completion date: March 28, 2011 | Current use: Commercial | Permit id: 6263133 | |||||
SCORE 100 19 9th Ave Seattle Wa Interior improvements to add vivarium in basement and support areas on 1st floor in existing lab/office building, per plans Applicant: Sager, Tom | Permit type: Construction | Permit status: Permit closed | Completion date: July 26, 2007 | Expiration date: August 9, 2008 | Current use: Commercial | Permit id: 6116800 | |||||
SCORE 100 1144 Eastlake Ave E Seattle Wa Commercial t. I. For non-structural office partition alterations at 7th floor tenant spaces of existing admin office use, per plans (revised 9/13/06). Applicant: Furukawa, Arthur | Permit type: Construction | Permit status: Permit closed | Completion date: December 6, 2007 | Expiration date: January 31, 2008 | Current use: Commercial | Permit id: 6104016 | |||||
SCORE 100 19 9th Ave Seattle Wa Tenant improvements to existing basement and first floor research lab space for childrens research institute, per plans. (project includes mechanical work) Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Completion date: March 21, 2013 | Current use: Commercial | Permit id: 6338721 | |||||
SCORE 100 199 E Blaine St Seattle Wa Phase iii of iii construct shell and core of mixed use building from level one (excluding columns level 1) up and occupy per plans. See 6208477: install hvac equipment to facilitate a mixed use laboratory building. Air handlers, chillers, cooling toners and pumps to be installed, per plans. Applicant: Conway, Stacie | Permit type: Construction | Permit status: Permit closed | Completion date: October 14, 2010 | Expiration date: June 19, 2011 | Current use: Multifamily | Permit id: 6138707 | |||||
SCORE 100 4121 1st Ave S Seattle Wa Remove existing stairs from mezzanine, construct new stair/ interior alteration existing warehouse/showroom/office per plans Applicant: Archer, Anthony | Permit type: Construction | Permit status: Permit closed | Completion date: November 2, 2007 | Expiration date: November 23, 2008 | Current use: Commercial | Permit id: 6125818 | |||||
SCORE 100 3801 Stone Way N Seattle Wa De-watering. 1/20/16 jcb; opened permit to allow for final inspections per ksd. Date: April 15, 2014 Contractor: B N Builders Inc Applicant: B N Builders Inc | Permit type: Side sewer | Permit status: Permit closed | Completion date: September 6, 2016 | Expiration date: October 15, 2016 | Current use: Multifamily | Permit id: 6413345 | |||||
SCORE 100 915 Terry Ave Seattle Wa Closed as incomplete - expired permit. Non-structural interior alterations to admin office 6th floor of existing puget sound blood center / subject to field inspection (stfi). Applicant: Stapper, Jim | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6281096 | |||||
SCORE 100 Date: February 6, 2015 Contractor: B N Builders Inc Applicant: Mattheis, Cory | Permit type: Demolition | Permit status: Reviews completed | Current use: Institutional | Permit id: 6456914 | |||||
SCORE 100 4 Dexter Ave N Seattle Wa Construct initial tenant improvements to existing mixed use building on level 2 nw corner (alexandria), per plan. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit issued | Expiration date: April 26, 2019 | Current use: Commercial | Permit id: 6610113 | |||||
SCORE 100 Client: Nbc Properties Llc | Current use: Single fam res-clust-zero lot-town house | Permit id: 2016015758 | |||||
SCORE 100 Client: Nbc Properties Llc | Current use: Single fam res-clust-zero lot-town house | Permit id: 2016014483 |