Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 175 Railroad St Santa Rosa Ca Modification of an existing at&t wireless facility including swapping of 3 existing antennas with 3 new antennas rearranging of existing antennas on the existing mounting pipes addition of 9 rrus associated cabling installation of 1 equipment rack 1 dc po Date: October 15, 2012 Contractor: At And T Mobility Delta Groups Permit status: Issued | Permit id: B12-2003 |