Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 71 4526 44th St Nw, Washington, Dc 20016 Remove tin roof and wall caps over garage and replace with comparable metal. Rebuild rafters and interior wood where damage is apparent. Install new gutter system. Date: January 11, 2012 Contractor: Amanda Roberts Client: Amanda Roberts | Permit type: Garage | Permit status: Permit issued | Permit id: G1200015 | |||||
SCORE 71 Date: October 17, 2013 Contractor: Amanda Roberts Permit status: Permit expired | Expiration date: November 9, 2013 | Permit id: Pa10118593 | |||||
SCORE 71 Date: July 29, 2016 Contractor: Amanda Roberts Permit status: Permit expired | Expiration date: September 1, 2016 | Permit id: Pa10328268 | |||||
SCORE 71 23 Dry Dock Av Boston Ma 02210 This proposed construction is for an interior off-site mock-up requested by kp washington st. Llc (ownership). This mock-up is work related to the primary new construction project at 659 washington street boston ma (kensington place). The interior mock-up will take up approx 6 square feet within the 2nd floor unit at 25 dry dock ave. That is currently rented by kp washington st. Llc (see attached floor plan). The mock-up will take approximately 1 month to build. It will stay in place for approximately 6 months at which point we will disassemble it. This mock-up is being used for visual purposes only per the request of the architect and owner. There will be no plumbing work and demonstration lighting only. The mock-up will be the entryway and kitchen/living area of a sample unit. Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Sf149348 | |||||
SCORE 71 23 Dry Dock Av Boston Ma This proposed construction is for an interior off-site mock-up requested by kp washington st. Llc (ownership). This mock-up is work related to the primary new construction project at 659 washington street boston ma (kensington place). The interior mock-up will take up approx 6 square feet within the 2nd floor unit at 25 dry dock ave. That is currently rented by kp washington st. Llc (see attached floor plan). The mock-up will take approximately 1 month to build. It will stay in place for approximately 6 months at which point we will disassemble it. This mock-up is being used for visual purposes only per the request of the architect and owner. There will be no plumbing work and demonstration lighting only. The mock-up will be the entryway and kitchen/living area of a sample unit. Permit type: Short form bldg permit | Expiration date: December 14, 2012 | Current use: Other | Permit id: Sf149348 |