Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 Unit 104 / 4 Cesano Ct, Unit 104, Palo Alto, Ca 94306 Install level 2 evse in multifamily below grade garage. Date: June 12, 2015 Contractor: All On Electric Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-01504 | |||||
SCORE 65 Unit 104 / 4 Cesano Ct, Unit 104, Palo Alto, Ca 94306 San Diego Ca Install level 2 evse in multifamily below grade garage. Date: June 12, 2015 Contractor: All On Electric Inc Permit status: In plan check | Permit id: 15000-01504 | |||||
SCORE 65 415 Middlefield Rd, Palo Alto, Ca 94301 San Diego Ca Residential pv system (9. 9 kw) tilt & flush mount installation ( modules) located on garage Date: June 28, 2017 Contractor: All On Electric Inc Permit status: Permit issued | Permit id: 17000-01478 | |||||
SCORE 65 Permit type: Residential addition-alteration | Permit status: Finaled | Current use: Residential | Permit id: B17-1454 | Parcel: 134360040 |