Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Date: January 14, 2009 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: February 19, 2009 | Expiration date: February 19, 2009 | Permit id: 2009-002447 Pp | |||||
SCORE 93 1913 Blue Meadow Dr Austin Tx 78744 Remodelrepair relocated move on foundation to manufactured home watt uncovered deck stairs Date: March 6, 2009 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: March 12, 2009 | Expiration date: March 12, 2009 | Permit id: 2009-016821 Pp | |||||
SCORE 93 Date: January 6, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: January 25, 2010 | Expiration date: January 25, 2010 | Permit id: 2010-0008 Pp | |||||
SCORE 93 14 North St Austin Tx 78756 Partial demolition 1 sq ft to rear of home for addition addition to encompass new master bedroom master bath and closet building wooden deck at rear of residence 1 of deck to be covered but open on three sides side entrance landing to have second set of stairs to be installed removing portion of existing roof to help tie in better to new addition roof line with the partial demo discovery of water and termite damage required that 2 exterior walls and 3 interior walls be removed and replaced placement of walls to stay the same raised front entrance ceiling height by 2 feet to provide for drainage per architect will increase the roof line in this area by 2 feet as well Date: October 29, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: January 19, 2011 | Expiration date: January 19, 2011 | Permit id: 2010-068629 Pp | |||||
SCORE 93 2215 Lindell Ave Austin Tx 78704 Interior remodel of existing 1 story sf res to replace plumbing in bath and kitchen bathroom new tub new sink new lavatories new toilet and replace sheetrock and electrical fixtures Date: March 24, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 23, 2011 | Expiration date: June 23, 2011 | Permit id: 2011-016972 Pp | |||||
SCORE 93 Date: August 7, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: February 9, 2009 | Permit id: 2008-060884 Pp | |||||
SCORE 93 4612 Ramsey Ave Austin Tx 78756 Add screened walls on existing rear patio relocate washer and dryer convert gas lanterns at entry to electric remove exterior door and add 1 window in its place upgrade electrical and plumbing as needed upgrade sheetrock and wallboard as needed Date: June 13, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 27, 2011 | Expiration date: June 27, 2011 | Permit id: 2011-050563 Pp | |||||
SCORE 93 Date: September 5, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Void | Expiration date: March 21, 2009 | Permit id: 2008-070111 Pp | |||||
SCORE 93 Date: September 5, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: May 25, 2009 | Permit id: 2008-070115 Pp | |||||
SCORE 93 Date: October 3, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: April 7, 2009 | Permit id: 2008-077973 Pp | |||||
SCORE 93 7103 Spurlock Dr Austin Tx 78731 Remodel to interior only remodel to kitchen removing and replacing cabinets countertops flooring and fixtures remodel to master bathroom adding new wall and door new shower and vanity Date: August 1, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: November 10, 2011 | Expiration date: November 10, 2011 | Permit id: 2011-065401 Pp | |||||
SCORE 93 Date: October 20, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Void | Expiration date: April 28, 2009 | Permit id: 2008-081847 Pp | |||||
SCORE 93 1812 W 36th St Austin Tx 78731 Interior remodel to existing detached garage to create separate studio space not to be used as a separate unit add full bath and door to exterior change out existing water heater refer to expired pmt 2008015918pp Date: September 8, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: November 21, 2011 | Expiration date: November 21, 2011 | Permit id: 2011-080361 Pp | |||||
SCORE 93 Date: August 19, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: September 13, 2011 | Expiration date: September 13, 2011 | Permit id: 2011-0744 Pp | |||||
SCORE 93 8403 High Oak Dr Austin Tx 78759 Master bathroom remodel decrease the size of the existing shower relocate 1 lavatory add 2 pocket doors replace window new lighting fixtures and replace 3 exterior doors at the rear of the existing single family residence and repermit expired permit number 2008092323bp removal of cabinet wall Date: May 18, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 2, 2012 | Expiration date: July 2, 2012 | Permit id: 2012-046395 Pp | |||||
SCORE 93 Date: June 2, 2009 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 10, 2009 | Expiration date: June 10, 2009 | Permit id: 2009-057825 Pp | |||||
SCORE 93 Date: April 2, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 6, 2010 | Expiration date: April 6, 2010 | Permit id: 2010-027859 Pp | |||||
SCORE 93 Date: May 5, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: May 14, 2010 | Expiration date: May 14, 2010 | Permit id: 2010-038803 Pp | |||||
SCORE 93 1707 Vista Ln Austin Tx 78703 Partial demo of 14 wide portion of back wood deck and hot tub as well as penetration of rear wall above deck to accomodate new addition of bath and walk in closet in space formerly occupied by section of rear deck remodel of existing bathroom replacement and movement of plumbing and electrical fixtures Date: September 10, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: March 11, 2011 | Expiration date: March 11, 2011 | Permit id: 2010-074413 Pp | |||||
SCORE 93 Date: October 31, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: June 10, 2009 | Permit id: 2008-086089 Pp | |||||
SCORE 93 Date: August 22, 2008 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Void | Expiration date: March 3, 2009 | Permit id: 2008-066681 Pp | |||||
SCORE 93 Date: May 18, 2009 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: May 26, 2009 | Expiration date: May 26, 2009 | Permit id: 2009-048857 Pp | |||||
SCORE 93 Date: January 27, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: January 28, 2010 | Expiration date: January 28, 2010 | Permit id: 2010-007189 Pp | |||||
SCORE 93 18 Bitter Creek Dr Austin Tx 78744 New mh residence see expired permit 2006027968bp move mobile home onto property with proper connections Date: February 22, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: March 8, 2010 | Expiration date: March 8, 2010 | Permit id: 2010-010882 Pp | |||||
SCORE 93 Date: April 2, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 15, 2010 | Expiration date: April 15, 2010 | Permit id: 2010-027849 Pp | |||||
SCORE 93 Date: May 10, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: May 21, 2010 | Expiration date: May 21, 2010 | Permit id: 2010-037579 Pp | |||||
SCORE 93 Date: May 26, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 1, 2010 | Expiration date: June 1, 2010 | Permit id: 2010-045644 Pp | |||||
SCORE 93 Date: June 1, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 21, 2010 | Expiration date: June 21, 2010 | Permit id: 2010-046945 Pp | |||||
SCORE 93 Date: June 18, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: January 17, 2011 | Permit id: 2010-053205 Pp | |||||
SCORE 93 Date: June 18, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: January 12, 2011 | Permit id: 2010-053209 Pp | |||||
SCORE 93 Date: June 22, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: January 12, 2011 | Permit id: 2010-053915 Pp | |||||
SCORE 93 Date: August 19, 2009 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: August 26, 2009 | Expiration date: August 26, 2009 | Permit id: 2009-094444 Pp | |||||
SCORE 93 Date: August 3, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: March 6, 2011 | Permit id: 2010-066406 Pp | |||||
SCORE 93 Date: August 3, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: September 27, 2011 | Permit id: 2010-066411 Pp | |||||
SCORE 93 Date: August 18, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: March 6, 2011 | Permit id: 2010-071183 Pp | |||||
SCORE 93 Date: September 21, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: September 22, 2010 | Expiration date: September 22, 2010 | Permit id: 2010-081502 Pp | |||||
SCORE 93 8618 Alverstone Way Austin Tx 78759 Remodel to existing 2 story sf res to remove interior walls between living and den dining and kitchen installing recessed lighting new windows new exterior doors and relocating ductwork only replace of kitchen sink faucet and sink hall lavatory and faucet rerout kitchen sink vent to accommodate removal of wall between kitchen dining master bath tub to be removed and replaced with shower all remodel work being done on 1st floor only Date: September 24, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: January 28, 2011 | Expiration date: January 28, 2011 | Permit id: 2010-083071 Pp | |||||
SCORE 93 7305 West Rim Dr Austin Tx 78731 Partial demo of existing sfres removal of portion of front western wall and associated roof structure to accomodate addition of bed and bath interior remodel of restrooms and kitchen utility room raise ceiling of family room and misc aesthetic outlets and wall repair throughout Date: November 24, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: May 20, 2011 | Expiration date: May 20, 2011 | Permit id: 2010-095813 Pp | |||||
SCORE 93 Date: December 6, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: December 7, 2010 | Expiration date: December 7, 2010 | Permit id: 2010-1042 Pp | |||||
SCORE 93 Date: December 9, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: December 13, 2010 | Expiration date: December 13, 2010 | Permit id: 2010-105558 Pp | |||||
SCORE 93 1625 Forest Trl Austin Tx 78703 Reconfigure kitchen and master bathroom remove loadbearing wall between living and dining room repair foundation add new doors and window insulation sheetrock and wallboard repair upgrade electrical and plumbing hvac ducting to be upgraded relocating a furnace to attic space Date: March 24, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 7, 2011 | Expiration date: July 7, 2011 | Permit id: 2011-018272 Pp | |||||
SCORE 93 Date: March 10, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: March 11, 2011 | Expiration date: March 11, 2011 | Permit id: 2011-019742 Pp | |||||
SCORE 93 Date: March 30, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 4, 2011 | Expiration date: April 4, 2011 | Permit id: 2011-026288 Pp | |||||
SCORE 93 Date: April 28, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 29, 2011 | Expiration date: April 29, 2011 | Permit id: 2011-0289 Pp | |||||
SCORE 93 Date: April 14, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 20, 2011 | Expiration date: April 20, 2011 | Permit id: 2011-031814 Pp | |||||
SCORE 93 Date: July 6, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 23, 2010 | Expiration date: July 23, 2010 | Permit id: 2010-058078 Pp | |||||
SCORE 93 Date: July 26, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 27, 2010 | Expiration date: July 27, 2010 | Permit id: 2010-061889 Pp | |||||
SCORE 93 Date: November 21, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: December 5, 2011 | Expiration date: December 5, 2011 | Permit id: 2011-105547 Pp | |||||
SCORE 93 Date: April 28, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 29, 2011 | Expiration date: April 29, 2011 | Permit id: 2011-035003 Pp | |||||
SCORE 93 Date: May 20, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 3, 2011 | Expiration date: June 3, 2011 | Permit id: 2011-0429 Pp | |||||
SCORE 93 7219 West Rim Dr Austin Tx 78731 Complete interior remodel of both bathrooms of existing 1 story sf res Date: July 14, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: August 10, 2011 | Expiration date: August 10, 2011 | Permit id: 2011-061675 Pp | |||||
SCORE 93 Date: July 25, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 27, 2011 | Expiration date: July 27, 2011 | Permit id: 2011-065499 Pp | |||||
SCORE 93 Date: August 1, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: August 2, 2011 | Expiration date: August 2, 2011 | Permit id: 2011-067982 Pp | |||||
SCORE 93 Date: August 11, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: August 25, 2011 | Expiration date: August 25, 2011 | Permit id: 2011-0696 Pp | |||||
SCORE 93 Date: August 30, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: September 8, 2011 | Expiration date: September 8, 2011 | Permit id: 2011-078143 Pp | |||||
SCORE 93 Date: September 8, 2011 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: March 7, 2012 | Permit id: 2011-079873 Pp | |||||
SCORE 93 Date: July 5, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 12, 2012 | Expiration date: July 12, 2012 | Permit id: 2012-067153 Pp | |||||
SCORE 93 Date: July 5, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 10, 2012 | Expiration date: July 10, 2012 | Permit id: 2012-067151 Pp | |||||
SCORE 93 Date: March 8, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: April 18, 2012 | Expiration date: April 18, 2012 | Permit id: 2012-023391 Pp | |||||
SCORE 93 Date: March 20, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2012 | Expiration date: June 18, 2012 | Permit id: 2012-026541 Pp | |||||
SCORE 93 Date: May 10, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2012 | Expiration date: June 18, 2012 | Permit id: 2012-045029 Pp | |||||
SCORE 93 Date: May 10, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: July 10, 2012 | Expiration date: July 10, 2012 | Permit id: 2012-046794 Pp | |||||
SCORE 93 Date: May 31, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: May 13, 2013 | Permit id: 2012-053979 Pp | |||||
SCORE 93 Date: May 31, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 25, 2012 | Expiration date: June 25, 2012 | Permit id: 2012-053982 Pp | |||||
SCORE 93 Date: May 31, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 25, 2012 | Expiration date: June 25, 2012 | Permit id: 2012-053984 Pp | |||||
SCORE 93 Date: June 1, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: June 5, 2012 | Expiration date: June 5, 2012 | Permit id: 2012-054834 Pp | |||||
SCORE 93 Date: August 3, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: August 31, 2012 | Expiration date: August 31, 2012 | Permit id: 2012-078482 Pp | |||||
SCORE 93 Date: August 3, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: September 20, 2012 | Expiration date: September 20, 2012 | Permit id: 2012-078489 Pp | |||||
SCORE 93 Date: August 16, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: May 13, 2013 | Permit id: 2012-083263 Pp | |||||
SCORE 93 Date: October 23, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: October 24, 2012 | Expiration date: October 24, 2012 | Permit id: 2012-097782 Pp | |||||
SCORE 93 Date: October 31, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: November 1, 2012 | Expiration date: November 1, 2012 | Permit id: 2012-110617 Pp | |||||
SCORE 93 Date: November 8, 2012 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Expired | Expiration date: June 19, 2013 | Permit id: 2012-113522 Pp | |||||
SCORE 93 39 Petra Path Austin Tx 78731 Interior remodel through existing 1 story sf res no increase in impervious coverage new paint wood floors some new light fixtures remodel kitchen and master bath layouts new case openings at dining room replace some doors a few new windows change fireplace facade relocate pool equipment out of pue easement and over existing impervious cover Date: March 11, 2010 Contractor: Alann Haub Permit type: Plumbing permit | Permit status: Final | Completion date: October 6, 2010 | Expiration date: October 6, 2010 | Permit id: 2010-018109 Pp |