Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 5 19th St Ne, Washington, Dc 20002 Partial interior fit-out of first floor, community college preparatory academy with 71 adult students and 4 staff and monument academy with 64 students ages 9 through 14 years and 73 staff/teachers with accessory residential use consisting of 4 student bedrooms and 2 staff bedrooms. The use will incluse a cafeteria with a warming kitchen (no cooking). The use will provide 52 automobile parking spaces on the lot. This project does not include elevator foundation , shaft, roof and equipment. Date: June 15, 2016 Contractor: Abdul Kabbani Client: Charter School Incubator Initiative | Permit type: Addition alteration repair | Permit status: Completed | Permit id: B1605016 |