Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 49 Puerto Rico Ave Ne, Washington, Dc 20017 Rain water harvesting system for future irrigation, reroute two external downspouts to two 50 gallon water tanks, from there the water will be pumped thru filters to future irrigation systems. Capitol area food bank. Date: May 13, 2013 Contractor: Abbie Steiner Client: Capitol Area Food Bank | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1306464 |