Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 65 Huntington Rd Arlington Ma Remove all existing interior finshes at the 1st floor bathroom. Insulate the exterior wall and ceiling install mr sheetrock cement board tile shower area completly and floor outside of shower instal vanity and top trim and paint existing layout Client: Deshler Christine P & | Permit id: 1204 |