SCORE 56 214 Massachusetts Ave Ne, Washington, Dc 20002 A hollow stem auger will install 5 temporary dewatering wells by advancing a 12 inch outer diameter 8 1/4 inch inner diameter bore hole to a depth of feet bgs. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 1/2 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharge at the accepted discharge location. Date: September 29, 2014 Contractor: 3rd Street Properties Llc Gary Kirstein Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400464 |