QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 909 Half St Se, Washington, Dc 20003 A hollow stem auger will install up to temporary dewatering wells by advancing a 12 od/ 8 1/4 id borehole to a depth of 65 feet. At depth, a 4 inch pvc flush joint, threaded well assembly will be set and select filter placed. Into each well will be installed a 1 hp turbine submersible pump. Effluent will be directed through a common manifold to a baffled settling tank and discharged to the location detailed on the temporary discharge authorization permit. Date: February 23, 2015 Contractor: 23 I Llc C O Related Companies; Andrew DancePermit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500132 |