Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 Office remodel on the mezzanine level of the conference center. We are reducing occupancy and not changing use. ![]() ![]() Permit status: In for review | Permit id: Bld2016-04568 | |||||
SCORE 100 (low voltage)detection & controls for organ pipe spaces pre-action fire sprinkler system ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03971 | |||||
SCORE 99 Lds church conference center- covering the organ pipe space with a double interlock pre-action system. Project has been designed by pci (greg jones). We will be installing this system only. They have asked us to submit this since we will be the installer. ![]() ![]() Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-03181 | |||||
SCORE 100 (low voltage)detection & controls for organ pipe spaces pre-action fire sprinkler system ![]() ![]() Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03971 | |||||
SCORE 56 Office remodel on the mezzanine level of the conference center. We are reducing occupancy and not changing use. ![]() ![]() Permit status: In for review | Permit id: Bld2016-04568 |