Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 16 fixtures for plumbing Date: August 3, 2016 Contractor: Kr Plumbing And Mechanical Llc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-07240 | |||||
SCORE 82 New facility for signature Date: June 10, 2016 Contractor: Ae Urbia Permit status: Inspections | Permit id: Bld2016-02894 | |||||
SCORE 82 New facility for signature Date: June 10, 2016 Contractor: Ae Urbia Permit status: Inspections | Permit id: Bld2016-02894 | |||||
SCORE 100 Fire sprinklers Date: September 2, 2016 Contractor: Quality Fire Protection Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-07746 | |||||
SCORE 92 18 susp. Heaters, ductwork, 8 evaporative coolers, 7 exhaust fans, 5 chillers 4-5 hp and 2 chiller 5-6 hp. Date: September 26, 2016 Contractor: Built Tuff Hvac Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-08965 | |||||
SCORE 99 Please upload construction plans to pdox... New facility for signature equipment Date: September 15, 2016 Contractor: Hughes General Contractors, Inc Permit type: Fire | Permit status: Need info | Permit id: Bld2016-08657 |