Emergency follow up - crew was called out on 12/27/13 to repair a gas main leak. Crew tightened bolts on flange of main valve located on redmond way. One 5x6 hard surface cut in the right-of-way was made. City inspector was on site 12/27/13. All work completed at that time. Date: March 19, 2014 Permit type: Right of way | Permit id: Row-2014-01460 | Parcel: 2561360260 | |||||
Emergency follow up - crew was called out on 12 27 13 to repair a gas main leak. Crew tightened bolts on flange of main valve located on redmond way. One 5x6 hard surface cut in the right-of-way was made. City inspector was on site 12 27 13. All work completed at that time. Date: March 19, 2014 Permit type: Right of way | Permit id: Row-2014-01460 | Parcel: 2561360260 | |||||
SCORE 86 Emergency work to replace pmh-11 switch at v1 Date: March 28, 2014 Contractor: Ernie Engen Permit type: Right of way | Permit id: Row-2014-01939 | Parcel: 1318300160 | |||||
SCORE 100 Emergency work to replace pmh-11 switch at v1 Date: March 28, 2014 Contractor: Potelco Permit type: Right of way | Permit id: Row-2014-01939 | Parcel: 1318300160 | |||||
SCORE 100 Emergency work to replace pmh-11 switch at v1 Date: March 28, 2014 Contractor: Potelco Permit type: Right of way | Permit id: Row-2014-01939 | |||||
Collect data for street lighting audit Date: May 12, 2017 Applicant: Sinjin Anterola | Permit type: Right of way | Permit id: Row-2017-03370 | Parcel: 6870300170 |