Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Following is an outline scope of work that findling, inc. Will be performing on this project: tasks to be performed: -mark existing utilities by ômiss utility?? Prior to start of work -maintenance of traffic (mot) will be provided as per the traffic control plan during the process of utility locating - locate existing water main line (utility) by performing a vacuum test hole û in the area new construction work will be performed at a later date by dcwater -vacuum test hole will be backfilled, upon completion of locating the utility and the surface will be patched with cold asphalt patch. Work will take place on harewood street nw and north capitol street nw washington dc, for district of columbia water & sewer a., as per site plans and tcp. Date: October 31, 2014 Permit type: Excavation; boring t | Permit id: Pa102271 | |||||
Following is an outline scope of work that findling, inc. Will be performing on this project: tasks to be performed: -mark existing utilities by miss utility prior to start of work -maintenance of traffic (mot) will be provided as per the traffic control plan during the process of utility locating - locate existing water main line (utility) by performing a vacuum test hole in the area new construction work will be performed at a later date by dcwater -vacuum test hole will be backfilled, upon completion of locating the utility and the surface will be patched with cold asphalt patch. Work will take place on harewood street nw and north capitol street nw washington dc, for district of columbia water & sewer a., as per site plans and tcp. Date: October 31, 2014 Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 29, 2015 | Permit id: Pa102271 | |||||
SCORE 89 Following is an outline scope of work that findling, inc. Will be performing on this project: tasks to be performed: -mark existing utilities by miss utility prior to start of work -maintenance of traffic (mot) will be provided as per the traffic control plan during the process of utility locating - locate existing water main line (utility) by performing a vacuum test hole in the area new construction work will be performed at a later date by dcwater -vacuum test hole will be backfilled, upon completion of locating the utility and the surface will be patched with cold asphalt patch. Work will take place on harewood street nw and north capitol street nw washington dc, for district of columbia water & sewer a., as per site plans and tcp. Date: October 31, 2014 Contractor: Findling, Inc. Findling, Inc Client: District Of Columbia Water & Sewer A. District Of Columbia Water & Sewer A. | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: January 29, 2015 | Permit id: Pa102271 | |||||
SCORE 79 Construction staging area Date: January 12, 2015 Permit status: Permit expired | Expiration date: January 23, 2015 | Permit id: Pa10172247 | |||||
SCORE 89 Directional bore 1,205 of (2) 1-1/4" hdpe e/w (1) 144 fiber. Place (3) 3x5x3 handholes. Perform (15) test pits, and place (7) bore / receive pits. The attached plans are apart of this permit if steel plates are used at this job site an additional permit is needed. Date: January 19, 2011 Contractor: Team Fishel Client: Tw Telecom Of Dc, Llc | Permit type: Excavation; boring test pit (each addl), excavation; manhole installation, excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: April 3, 2011 | Permit id: Pa59573 |