Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 67 Relocate existing 2-inch hdpe conduit with fiber optic cable. Work will include excavating and exposing existing centurylink conduit/ place connection as noted on drawing and trench in new 2-inch conduit to existing manhole. All work is in the shoulder area. Date: November 5, 2014 Contractor: Rick Peters Applicant: Michael Lopez | Permit type: Right of way | Permit id: Row-2014-08450 | Parcel: 3526059102 | |||||
Occupying southbound lane of redmond-woodinville road (sr202) to repair valve box at 73 feet south of centerline of ne 116th street and 13 feet west of centerline of redmond-woodinville road. One 3x5 cut anticipated. Date: April 2, 2015 Applicant: Emily Best | Permit type: Right of way | Permit id: Row-2015-02200 | Parcel: 6192410770 | |||||
Occupying southbound lane of redmond-woodinville road to raise and repair paving at valve box located at feet west of centerline of redmond-woodinville road and 35 feet north of centerline. One 3x5 concrete cut anticipated. Date: September 29, 2015 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2015-06459 | Parcel: 5490210440 | |||||
SCORE 95 Relocate existing 2-inch hdpe conduit with fiber optic cable. Work will include excavating and exposing existing centurylink conduit place connection as noted on drawing and trench in new 2-inch conduit to existing manhole. All work is in the shoulder area. Date: November 5, 2014 Contractor: North Sky Communications Inc Applicant: Michael Lopez | Permit type: Right of way | Permit id: Row-2014-08450 | Parcel: 3526059102 | |||||
Occupying southbound lane of redmond-woodinville road (sr202) to repair valve box at 73 feet south of centerline of ne 116th street and 13 feet west of centerline of redmond-woodinville road. One 3x5 cut anticipated. Date: April 2, 2015 Applicant: Emily Best | Permit type: Right of way | Permit id: Row-2015-02200 | Parcel: 6192410770 | |||||
Occupying southbound lane of redmond-woodinville road to raise and repair paving at valve box located at feet west of centerline of redmond-woodinville road and 35 feet north of centerline. One 3x5 concrete cut anticipated. Date: September 29, 2015 Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2015-06459 | Parcel: 5490210440 | |||||
SCORE 95 Relocate existing 2-inch hdpe conduit with fiber optic cable. Work will include excavating and exposing existing centurylink conduit place connection as noted on drawing and trench in new 2-inch conduit to existing manhole. All work is in the shoulder area. Date: November 5, 2014 Contractor: North Sky Communications Inc Applicant: Michael Lopez | Permit type: Right of way | Permit id: Row-2014-08450 |