Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
The scope of work includes renovations to the ground floor to enlarge the inpatient pharmacy. Date: November 20, 2013 Permit type: Alteration | Permit status: Aca pending | Permit id: Bb-201306466 | |||||
SCORE 88 Electrical Date: November 4, 2013 Contractor: United Electric Company Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201309279 | |||||
SCORE 86 Install 7 vavs w hot water heat and 1 exhaust fan. Mike burdeshaw approved plans 10-9-13. Date: October 30, 2013 Contractor: Shumate Mechanical Llc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201303162 | |||||
Grady memorial hospital-hemodialysis- 9th fl- d wing interior upgrades. Retrofitting of two restrooms in existing unit. Date: October 14, 2013 Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-02461 | |||||
SCORE 66 New installation of electrical - Date: August 6, 2013 Contractor: Bright Electrical Permit type: Electrical | Permit status: Issued | Permit id: Be-201306267 | |||||
SCORE 86 Relocate fire sprinkler heads per code due to new ceiling grid . Date: June 12, 2013 Contractor: Advantage Fire Sprinkler Company Inc Permit type: Fire sprinkler | Permit status: Issued | Permit id: Bp-201301840 | |||||
SCORE 59 Up-grade four antennas; alteration to head-in room-buildout Date: May 7, 2013 Contractor: Abuck Design Builders Permit type: Miscellaneous | Permit status: Issued | Permit id: Bb-201302440 | |||||
SCORE 59 Up grade tower antennas, no ground work. Date: May 7, 2013 Contractor: Abuck Design Builders Permit type: Commercial | Permit status: Create application | Permit id: Qcr-2013-00556 | |||||
SCORE 86 Provide electrical support for inpatient renovation of 6a-b wings at grady. Date: April 19, 2013 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201303114 | |||||
SCORE 86 Provide low voltage voice & data work for 6th floor inpatient renovation at grady. Date: April 19, 2013 Contractor: Eckardt Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201303116 | |||||
SCORE 86 Install 82 terminal units Date: March 22, 2013 Contractor: Legacy Mechanical Services Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201300766 | |||||
SCORE 86 Install 9 terminal units, ductwork, and air distribution Date: March 20, 2013 Contractor: Legacy Mechanical Services Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201300736 | |||||
SCORE 86 Plumbing @ jess hill jr dr ne -grady: inpatient wing 6a & 6b cosmeetic renovation of sixth floor patient wing - new lighting new hvac and new plumbing fixtures Date: March 12, 2013 Contractor: Rawlins Mechanical Contractors Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201300801 | |||||
Plumbing for bb-201203112 1 floor drain 1 hose bib Date: February 21, 2013 Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201300638 | |||||
Plumbing bb-201203114 Date: February 21, 2013 Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201300637 | |||||
SCORE 88 Electrical work Date: February 12, 2013 Contractor: United Electric Company Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201301166 | |||||
Development of a centralized scope washing facility in central sterile. The scope of the project includes design of soiled equipment room and final cleaning and packing space for three (3) scope washers in central sterile. The soiled equipment room will house two (2) sinks and counter space and cabinets, and the final cleaning and packing space will house the scope washers as well as counter space and cabinets. Date: December 20, 2012 Permit type: Alteration | Permit status: Terminated | Permit id: Bb-201206340 | |||||
SCORE 86 Electrical work-low voltage upgrade to existing fire alarm system 8 sq ft Date: December 17, 2012 Contractor: Convergant Technologies Permit type: Low voltage | Permit status: Issued | Permit id: Be-201209981 | |||||
SCORE 95 Cosmeetic renovation of sixth floor patient wing - new lighting new hvac and new plumbing fixtures Date: December 13, 2012 Contractor: Skanska Usa Building Inc Permit type: Alteration | Permit status: No co required | Permit id: Bb-201206234 | |||||
Third floor renovation of patient holding space, exam suite, electronic medical records reading room, and support spaces. Date: December 11, 2012 Permit type: Alteration | Permit status: Terminated | Permit id: Bb-201206157 | |||||
SCORE 86 Provide voice-data system devices and wiring and rough-in for nurse call in suite 3d022 for new ct holding area. Date: September 10, 2012 Contractor: Eckardt Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201207333 | |||||
SCORE 86 Electrical renovation to existing suite to accomodate new ct holding area. Date: September 10, 2012 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201207327 | |||||
SCORE 86 Expand to existing fire alarm system by adding 4 strobe devices in new ct holding suite 3d022. Date: September 10, 2012 Contractor: Eckardt Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201207334 | |||||
SCORE 86 Plumbing for renovation of shell space into patient holding space. Date: August 29, 2012 Contractor: Rawlins Mechanical Contractors Permit type: Plumbing | Permit status: Open | Permit id: Bp-201203004 | |||||
SCORE 86 Plumbing renovation work. Date: August 21, 2012 Contractor: Rawlins Mechanical Contractors Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201202883 | |||||
SCORE 86 Rework electrical to accomodate new ultrasound cleanup rooms. Date: August 2, 2012 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201206222 | |||||
SCORE 86 Renovation of existing plumbing- Date: August 1, 2012 Contractor: Rawlins Mechanical Contractors Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201202609 | |||||
SCORE 86 Replacing existing supply diffusers and return grilles with new (no new equipment or ductwork) Date: July 31, 2012 Contractor: Legacy Mechanical Services Inc Permit type: Hvac | Permit status: Issued | Permit id: Bm-201202109 | |||||
SCORE 86 Rework electrical systems to accomodate surgery family lounge renovation. Related to building permit #bb-201202826 Date: July 26, 2012 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201206016 | |||||
SCORE 86 Provide 2 voice-data, 2 cable tv, & 1 fire alarm devices in surgery family lounge. Date: July 26, 2012 Contractor: Eckardt Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201206017 | |||||
SCORE 73 Jessie hill 7th flr mech room---replacement only Date: June 27, 2012 Contractor: Martin W. Mann Permit type: Hvac | Permit status: Issued | Permit id: Bm-201201832 | |||||
Renovation of utility rooms Date: June 12, 2012 Permit type: Alteration | Permit status: No co required | Permit id: Bb-201202872 | |||||
SCORE 95 Renovation of shell space into patient holding space. Date: June 12, 2012 Contractor: Skanska Usa Building Inc Permit type: Alteration | Permit status: No co required | Permit id: Bb-201202871 | |||||
SCORE 86 Inpatient satellite rehab gym duct alterations Date: April 18, 2012 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201201095 | |||||
SCORE 99 Fire alarm 5 smoke detectors 4 strobes 1 chime strobe Date: April 12, 2012 Contractor: Metropower Inc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201202942 | |||||
SCORE 56 Remodel and relocation of the nicu clerk station and staff locker room. Remove one wall of the staff lounge locker room to allow it to become clerk station. Build one new wall to enclose the current clerk station to become the new staff lounge locker room. Also, enclose transaction opening and remove one windo and patch wall. 4 9 12 relocating 1 medical gas alarm panel - grady nicu Date: April 9, 2012 Contractor: A And O Plumbing Permit type: Plumbing | Permit status: Issued | Permit id: Bp-201201201 | |||||
SCORE 86 Retofit existing electrical to accomodate new layout of cleark station and locker room on 5th floor l-wing at grady. Date: March 30, 2012 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201202614 | |||||
SCORE 82 Install fire alarm to support the renovated area. Date: March 7, 2012 Contractor: Inglett And Stubbs Llc Permit type: Low voltage | Permit status: Issued | Permit id: Be-201201886 | |||||
SCORE 86 Duct alteration only- Date: February 20, 2012 Contractor: J.R. Nichols Co Permit type: Hvac | Permit status: Issued | Permit id: Bm-201200486 | |||||
Remodel and relocation of the nicu clerk station and staff locker room. Remove one wall of the staff lounge locker room to allow it to become clerk station. Build one new wall to enclose the current clerk station to become the new staff lounge locker room. Also, enclose transaction opening and remove one windo and patch wall. Date: February 17, 2012 Permit type: Alteration | Permit status: Complete | Permit id: Bb-201200876 | |||||
SCORE 88 Electrical remodel Date: February 7, 2012 Contractor: E C Electric Inc Permit type: Electrical | Permit status: Issued | Permit id: Be-201201026 | |||||
SCORE 86 We are subdividing an existing, under-utilized waiting room by adding two walls to create a rehabilitation gym in the center of the former waiting room. We are adding one pair of double doors to access the small gym from the corridor and adding one door to the new partition to provide access to an existing toilet. Elevator lobby shall have a sprinkler system Date: December 19, 2011 Contractor: Cork Howard Construction Permit type: Alteration | Permit status: Issued | Permit id: Bb-201105868 | |||||
SCORE 86 Provide low voltage data outlets (3) for ems break room. Date: December 2, 2011 Contractor: Eckardt Electric Company Permit type: Low voltage | Permit status: Issued | Permit id: Be-201108536 | |||||
SCORE 86 Provide electrical necessary to convert 160sf of stretcher alcove into a break room for ems staff. Date: December 2, 2011 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201108534 | |||||
SCORE 86 Interior alteration Date: December 1, 2011 Contractor: Cork Howard Construction Permit type: Alteration | Permit status: No co required | Permit id: Bb-201105585 | |||||
SCORE 95 Convert 1 sf stretcher alcove into a break room for ems staff. Date: October 11, 2011 Contractor: Skanska Usa Building Inc Permit type: Alteration | Permit status: Complete | Permit id: Bb-201104742 | |||||
SCORE 86 Electrical renovation of x-ray room at grady hospital. Date: September 7, 2011 Contractor: Eckardt Electric Permit type: Electrical | Permit status: Issued | Permit id: Be-201106412 | |||||
SCORE 86 Buildout of an observation room in the psychiatric unit. Date: August 31, 2011 Contractor: Cork Howard Construction Permit type: Alteration | Permit status: Complete | Permit id: Bb-201104011 |