Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Temporary relocation of bike/ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: July 27, 2015 Value: $2,100 Client: Carlton Ray Dc Water | Permit type: Paving; sidewalk(s), | Permit id: Pa97792-R1 | |||||
Temporary relocation of bike/ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: July 14, 2014 Client: Carlton Ray Dc Water | Permit type: Paving; sidewalk(s), mega projects; dc water combined sewer proj, landscaping; tree removal 12. 1" & up, landscaping; tree removal 2"-6" | Permit status: Permit expired | Expiration date: August 24, 2015 | Permit id: Pa97792 | |||||
Temporary relocation of bike/ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: July 27, 2015 Client: Carlton Ray Dc Water | Permit type: Paving; sidewalk(s), mega projects; dc water combined sewer proj, landscaping; tree removal 12. 1" & up, landscaping; tree removal 2"-6" | Permit status: Issued | Expiration date: August 23, 2016 | Permit id: Pa97792-R1 | |||||
SCORE 76 Other reserved parking Contractor: Suzie Her Permit status: Withdrawn | Expiration date: April 12, 2015 | Permit id: 0 | |||||
SCORE 86 Construction staging area Date: March 29, 2010 Contractor: Stephen Skippen Permit status: Expired | Expiration date: April 9, 2010 | Permit id: Pa10002058 | |||||
SCORE 76 Other reserved parking Contractor: Suzie Her Permit status: Withdrawn | Expiration date: April 12, 2015 | Permit id: 0 | |||||
SCORE 89 Temporary relocation of bike/ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: July 14, 2014 Contractor: Impregilohealyparsons Jv Client: Carlton Ray Dc Water | Permit type: Paving; sidewalk(s), mega projects; dc water combined sewer proj, landscaping; tree removal 12. 1" & up, landscaping; tree removal 2"-6" | Permit status: Permit expired | Expiration date: August 24, 2015 | Permit id: Pa97792 | |||||
SCORE 89 Temporary relocation of bike/ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: July 27, 2015 Contractor: Impregilohealyparsons Jv Client: Carlton Ray Dc Water | Permit type: Paving; sidewalk(s), mega projects; dc water combined sewer proj, landscaping; tree removal 12. 1" & up, landscaping; tree removal 2"-6" | Permit status: Permit expired | Expiration date: August 23, 2016 | Permit id: Pa97792-R1 | |||||
SCORE 89 Temporary relocation of bike ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: December 16, 2014 Contractor: Impregilohealyparsons Jv Permit status: Permit expired | Expiration date: August 24, 2015 | Permit id: Pa97792 | |||||
SCORE 89 Temporary relocation of bike ped trail at dc waters cso 007 drop shaft site, part of dc clean rivers div h (anacostia river tunnel). Existing trail to be demolished and relocated outside site footprint. Two row trees to be removed. Soe to be installed to excavate hillside for shaft construction (soe to be permitted separately via tops). Jersey barriers and fencing to be placed for public protection between trail and ramp c-3, and between trail and soe. While soe is installed and removed, trail users will be detoured via intersection of mlk jr ave & good hope road. Temp. Trail to be in operation until early 2017. Erosion & sediment control measures and stormwater management plans already approved by ddoe under dcra permit bciv1400047. Date: July 29, 2015 Contractor: Impregilohealyparsons Jv Permit status: Permit expired | Expiration date: August 23, 2016 | Permit id: Pa97792-R1 | |||||
SCORE 76 Other reserved parking Contractor: Suzie Her Permit status: Withdrawn | Expiration date: April 12, 2015 | Permit id: 0 | |||||
SCORE 76 Other reserved parking Contractor: Suzie Her Permit status: Withdrawn | Expiration date: April 12, 2015 | Permit id: 0 |