Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Tenant finish of a small area on level 1 of the church office building. Date: December 28, 2015 Contractor: Western Automatic Sprinkler In Permit type: Fire | Permit status: Inspections | Permit id: Bld2015-10381 | |||||
SCORE 99 Replace 5-vav boxes, register grilles, dampers, controls, test and balance, duct Date: July 29, 2016 Contractor: United Team Mechanical Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-07079 | |||||
SCORE 99 Hvac remodel Date: July 13, 2016 Contractor: United Team Mechanical Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-06590 | |||||
SCORE 100 Remodel of cafeteria area level 1ll gc permit bld2016-05801 Date: August 1, 2016 Contractor: Copper Mountain Electric Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-07117 | |||||
SCORE 100 Relocate existing sprinkler heads to accommodate new ceiling layout Date: August 11, 2016 Contractor: Delta Fire Systems Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-06867 | |||||
SCORE 100 Lds church office building main level west wing complete floor remodel complete interior remodel of the main level west wing of the lds church office building. Non-structural; except for the removal existing cmu shaftwall at abandoned lamson mail delivery system. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. Date: December 31, 2015 Contractor: Layton Construction Co. Inc Permit status: Inspections | Permit id: Bld2015-08789 | |||||
SCORE 100 Tenant improvement of the 21st floor Date: November 7, 2016 Contractor: Copper Mountain Electric, Llc Permit type: Electrical | Permit id: Bld2016-10355 | |||||
SCORE 100 Lds church office building main level west wing complete floor remodel complete interior remodel of the main level west wing of the lds church office building. Non-structural; except for the removal existing cmu shaftwall at abandoned lamson mail delivery system. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers. Date: December 31, 2015 Contractor: Layton Construction Co., Inc Permit status: Inspections | Permit id: Bld2015-08789 | |||||
SCORE 100 Remodel of cafeteria area level 1ll gc permit bld2016-05801 Date: August 1, 2016 Contractor: Copper Mountain Electric Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-07117 | |||||
SCORE 100 Relocate existing sprinkler heads to accommodate new ceiling layout Date: August 11, 2016 Contractor: Delta Fire Systems, Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-06867 | |||||
SCORE 99 Tenant finish of a small area on level 1 of the church office building. Date: December 28, 2015 Contractor: Western Automatic Sprinkler In Permit type: Fire | Permit status: Inspections | Permit id: Bld2015-10381 | |||||
SCORE 99 Hvac remodel Date: July 13, 2016 Contractor: United Team Mechanical, Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-06590 | |||||
SCORE 99 Replace 5-vav boxes, register grilles, dampers, controls, test and balance, duct Date: July 29, 2016 Contractor: United Team Mechanical, Llc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-07079 | |||||
SCORE 95 Relocate and or add 4 speaker strobes and 2 strobes to remodel of the cafeteria on ll1. Connect speakers to existing speaker circuit from the health unit. Run new class a wiring for the strobes from the existing transponder using unused circuit nac6. Date: September 16, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-07721 | |||||
SCORE 95 Add a new nac panel to the 21st floor and add new devices as shown on the drawings. This is a complete remodel of the 21st floor and all devices will be new. Date: November 3, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: In for review | Permit id: Bld2016-09635 | |||||
SCORE 99 New sprinkler system for level 21 of the church office building Date: November 4, 2016 Contractor: Western Automatic Sprinkler In Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-09293 | |||||
SCORE 97 Install new plumbing fixtures Date: May 4, 2016 Contractor: Reliable Plumbing And Heating Inc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-04285 | |||||
SCORE 100 Please arrange payment for the balance due / complete electrical remodel of first floor, west wing. Includes interior and site lighting, fire alarm, intrusion detection. Date: March 11, 2016 Contractor: Dynalectric Company Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-02256 | |||||
SCORE 100 Fire sprinkler ti Date: March 14, 2016 Contractor: Certified Fire Protection Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-02095 | |||||
Ductwork... Hvac remodel of the west wing lds church office building Date: May 4, 2016 Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-04245 | |||||
SCORE 95 This is a remodel of the main level, west wing of the church office building. We will be replacing the existing devices with new devices. A new nac will be installed in the electrical closet to control the strobes. New amplifiers will be installed in the data gathering panel on the third floor for voice control. Wiring is already in place from the dgp on the 3rd floor to the electrical room where the new nac will be installed. All wiring will be class a. Date: March 14, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-01338 | |||||
SCORE 100 Ductwork... Hvac remodel of the west wing lds church office building Date: May 4, 2016 Contractor: Aj Sheet Metal Inc Permit type: Mechanical | Permit status: Inspections | Permit id: Bld2016-04245 | |||||
SCORE 97 Install new plumbing fixtures Date: May 4, 2016 Contractor: Reliable Plumbing And Heating Inc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-04285 | |||||
SCORE 97 Remodel 27 & 28th floors.----2-drinking fountains 1-kitchen sink 2-wash basins-lavs 2-water closets, flushometer type, 1. 6 gal. Date: June 9, 2016 Contractor: Reliable Plumbing And Heating Inc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-05491 | |||||
SCORE 99 Remodel and add fire sprinklers to levels 27 & 28 Date: July 6, 2016 Contractor: Western Automatic Sprinkler In Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-05542 | |||||
SCORE 99 Tenant improvement of 27th and 28th floors Date: April 26, 2016 Contractor: Copper Mountain Electric Llc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-03911 | |||||
SCORE 95 Add new nac panel on the 27th floor to run new strobes on the 27th & 28th floors. Replace and/or add devices to existing speaker circuits and slc circuits due to the remodeling of these two floors. Date: May 20, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03776 | |||||
SCORE 79 Complete interior remodels of the 27th and 28th floors of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907, at both floors. Add new ada compliant single-user restrooms at both floors. Replace existing drinking fountains with new ada compliant electric water coolers at both floors. Add new ada compliant break room at 28th floor. Date: March 24, 2016 Contractor: Layton Construction Company Llc Permit status: Inspections | Permit id: Bld2016-00598 | |||||
SCORE 99 Remodel and add fire sprinklers to levels 27 & 28 Date: July 6, 2016 Contractor: Western Automatic Sprinkler In Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-05542 | |||||
SCORE 59 Interior remodel of lds church office building cafeteria located on lower level 1, non-structural. To provide new, simple food preparation area and office areas. Date: July 22, 2016 Contractor: Curtis Miner Architecture Permit status: Inspections | Permit id: Bld2016-05801 | |||||
SCORE 95 This is a remodel of the main level, west wing of the church office building. We will be replacing the existing devices with new devices. A new nac will be installed in the electrical closet to control the strobes. New amplifiers will be installed in the data gathering panel on the third floor for voice control. Wiring is already in place from the dgp on the 3rd floor to the electrical room where the new nac will be installed. All wiring will be class a. Date: March 14, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-01338 | |||||
SCORE 100 Please arrange payment for the balance due complete electrical remodel of first floor, west wing. Includes interior and site lighting, fire alarm, intrusion detection. Date: March 11, 2016 Contractor: Dynalectric Company Permit type: Electrical | Permit status: Need info | Permit id: Bld2016-02256 | |||||
SCORE 100 Fire sprinkler ti Date: March 14, 2016 Contractor: Certified Fire Protection, Inc Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-02095 | |||||
SCORE 82 Complete interior remodels of the 27th and 28th floors of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907, at both floors. Add new ada compliant single-user restrooms at both floors. Replace existing drinking fountains with new ada compliant electric water coolers at both floors. Add new ada compliant break room at 28th floor. Date: March 24, 2016 Contractor: Layton Construction Company, Llc Permit status: Inspections | Permit id: Bld2016-00598 | |||||
SCORE 100 Tenant improvement of 27th and 28th floors Date: April 26, 2016 Contractor: Copper Mountain Electric, Llc Permit type: Electrical | Permit status: Inspections | Permit id: Bld2016-03911 | |||||
SCORE 95 Add new nac panel on the 27th floor to run new strobes on the 27th & 28th floors. Replace and or add devices to existing speaker circuits and slc circuits due to the remodeling of these two floors. Date: May 20, 2016 Contractor: Simplexgrinnell Lp Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03776 | |||||
SCORE 97 Remodel 27 & 28th floors.----2-drinking fountains 1-kitchen sink 2-wash basins-lavs 2-water closets, flushometer type, 1. 6 gal. Date: June 9, 2016 Contractor: Reliable Plumbing And Heating Inc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-05491 | |||||
SCORE 59 Interior remodel of lds church office building cafeteria located on lower level 1, non-structural. To provide new, simple food preparation area and office areas. Date: July 22, 2016 Contractor: Curtis Miner Architecture Permit status: Inspections | Permit id: Bld2016-05801 | |||||
SCORE 97 Add new plumbing fixtures Date: August 22, 2016 Contractor: Reliable Plumbing And Heating Inc Permit type: Plumbing | Permit status: Inspections | Permit id: Bld2016-07873 | |||||
SCORE 62 Lds church office building 21st level complete floor remodel complete interior remodel of the 21st floor of the lds church office building. Non-structural. Add new automatic fire sprinkler system per nfpa 13, and new fire alarm and detection system per ibc 907. 3. Add new ada compliant single-user restroom. Replace existing drinking fountains with new ada compliant electric water coolers Date: November 4, 2016 Contractor: Curtis Miner Architecture Llc Permit status: Inspections | Permit id: Bld2016-07640 |