Building Permits at Barney Circle Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with Barney Circle Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Relocation of storm sewer infrastructure at dc waters cso 018 drop shaft site (clean rivers div h). Sewer infrastructure to be relocated to accommodate construction of cso 018 slurry wall, permitted under tops 97241. Portions of existing 18" and 27" storm pipes and one associated manhole to be demolished or capped and abandoned in place. New 18" and 27" storm pipe and two new manholes to be installed. Pavement on se/sw blvd and on-ramp to be restored upon completion of sewer relocations. All work to take place in fall 2014, prior to re-opening of se/sw blvd. Mot approved under tops 97241. Please note: mot for re-opened boulevard will not come into effect under this permit. This work must be completed prior to re-opening of se/sw boulevard.
Date:  September 30, 2014
Value:   $600

Client: Carlton Ray Dc Water | Permit type: Excavation; manhole | Permit id: Pa100818
2014/09/3060095Barney Circle Washington Dc
Revision to construction permit #97241 to reflect new staging area and mot for cso 018 shaft site for dc clean rivers project - division h (anacostia river tunnel). Revised staging area & mot will be implemented per ddot instruction at coordination meeting of 9/23/14 (notes attached). Revisions to go into effect upon re-opening of se/sw boulevard at end of 2014. Contractor to maintain two open lanes on westbound on-ramp to se/sw blvd, and two open lanes on eastbound off-ramp from the boulevard to pennsylvania ave. Primary site access to/from lower staging area will be via rfk stadium access road under barney circle. Flagger operation to be used for any trucks entering eastbound roadway from upper or lower staging area.
Date:  October 28, 2014
Value:   $100

Client: Carlton Ray Dc Water | Permit type: Mega projects; dc wa | Permit id: Pa102082
2014/10/2810095Barney Circle Washington Dc
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 21, 2015
Value:   $400

Client: Carlton Ray | Permit type: Paving; curb & gutte | Permit id: Pa97241-R1
2015/07/2140095Barney Circle Washington Dc
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 27, 2015
Value:   $100

Client: Impregilo-Healy-Parsons Jv | Permit type: Excavation; monitori | Permit id: Pa97793-R1
2015/07/2710095Barney Circle Washington Dc
Final restoration for dc waters clean rivers project - div h - cso 018 site at barney circle. Includes installation of sub-grade electrical vault on upper level, curb and pavement restoration, and installation of 18" odor control pipe on barney circle retaining wall. Erosion control and stormwater management measures approved by ddoe under bciv1400026. Ref tops permits 97241, 102082, 113256.
Date:  August 14, 2015
Value:   $1,222

Client: Carlton Ray Dc Water | Permit type: Paving; curb & gutte
2015/08/14122295Barney Circle Washington Dc
Support of excavation and subsequent construction of near surface structure for dc waters clean river project div h - cso-018 site. Construction of below-grade concrete approach channel, vent chamber, and odor control vault facility, to be installed adjacent to the east bound ramp to the southeast freeway, below barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  December 14, 2015

Client: Impregilo-Healy-Parsons Jv | Permit type: Excavation; sheeting
2015/12/14095Barney Circle Washington Dc
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  June 27, 2014

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: August 17, 2015 | Permit id: Pa97241
2014/06/27095Barney Circle Washington Dc
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 14, 2014

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: August 24, 2015 | Permit id: Pa97793
2014/07/14095Barney Circle Washington Dc
Soil boring for temporary dewatering activities at cso 018 of dc waters clean rivers project - div h. Total of thirteen (13) mud rotary borings with surface casing broken down as follows: six (6) dewatering wells at 165 feet below grade, 16 inches diameter; five (5) additional contingency dewatering wells (if needed); and two (2) monitoring wells at 1 feet below grade, 8 inches diameter. Associated with tops construction permit 97241 for lod, erosion control, mot, etc. Ground and structural monitoring program covered under tops permit 97793.
Date:  July 29, 2014

Client: Carlton Ray | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: September 30, 2015 | Permit id: Pa98423
2014/07/29095Barney Circle Washington Dc
Relocation of storm sewer infrastructure at dc waters cso 018 drop shaft site (clean rivers div h). Sewer infrastructure to be relocated to accommodate construction of cso 018 slurry wall, permitted under tops 97241. Portions of existing 18" and 27" storm pipes and one associated manhole to be demolished or capped and abandoned in place. New 18" and 27" storm pipe and two new manholes to be installed. Pavement on se/sw blvd and on-ramp to be restored upon completion of sewer relocations. All work to take place in fall 2014, prior to re-opening of se/sw blvd. Mot approved under tops 97241. Please note: mot for re-opened boulevard will not come into effect under this permit. This work must be completed prior to re-opening of se/sw boulevard.
Date:  September 30, 2014

Client: Carlton Ray Dc Water | Permit type: Excavation; manhole installation, excavation; manhole removal/abandonment, mega projects; dc water combined sewer proj, excavation; repair storm service lateral, paving; mill and overlay | Permit status: Permit expired | Expiration date: November 12, 2015 | Permit id: Pa100818
2014/09/30095Barney Circle Washington Dc
Revision to construction permit #97241 to reflect new staging area and mot for cso 018 shaft site for dc clean rivers project - division h (anacostia river tunnel). Revised staging area & mot will be implemented per ddot instruction at coordination meeting of 9/23/14 (notes attached). Revisions to go into effect upon re-opening of se/sw boulevard at end of 2014. Contractor to maintain two open lanes on westbound on-ramp to se/sw blvd, and two open lanes on eastbound off-ramp from the boulevard to pennsylvania ave. Primary site access to/from lower staging area will be via rfk stadium access road under barney circle. Flagger operation to be used for any trucks entering eastbound roadway from upper or lower staging area.
Date:  October 28, 2014

Client: Carlton Ray Dc Water | Permit type: Mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: December 24, 2015 | Permit id: Pa102082
2014/10/28095Barney Circle Washington Dc
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 21, 2015

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Issued | Expiration date: August 16, 2016 | Permit id: Pa97241-R1
2015/07/21095Barney Circle Washington Dc
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 27, 2015

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: August 23, 2016 | Permit id: Pa97793-R1
2015/07/27095Barney Circle Washington Dc
Final restoration for dc waters clean rivers project - div h - cso 018 site at barney circle. Includes installation of sub-grade electrical vault on upper level, curb and pavement restoration, and installation of 18" odor control pipe on barney circle retaining wall. Erosion control and stormwater management measures approved by ddoe under bciv1400026. Ref tops permits 97241, 102082, 113256.
Date:  August 14, 2015

Client: Carlton Ray Dc Water | Permit type: Paving; curb & gutter(s), paving; mill and overlay, excavation; vault(s) 20x each, over head work; streetlight(s) installation, mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: January 30, 2017 | Permit id: Pa114393
2015/08/14095Barney Circle Washington Dc
Support of excavation and subsequent construction of near surface structure for dc waters clean river project div h - cso-018 site. Construction of below-grade concrete approach channel, vent chamber, and odor control vault facility, to be installed adjacent to the east bound ramp to the southeast freeway, below barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  February 23, 2016

Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: December 30, 2016 | Permit id: Pa120548-R1
2016/02/23095Barney Circle Washington Dc
Support of excavation and subsequent construction of near surface oder control vent facility structure for dc waters clean river project div h - cso-018 site. Application also includes construction of below-grade concrete structures that are installed adjacent to the east bound ramp to the southeast freeway on lower level, and adjacent to pennsylvania ave on upper level of barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  March 8, 2016

Client: Carlton Ray Dc Water | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: April 19, 2017 | Permit id: Pa124347
2016/03/08095Barney Circle Washington Dc
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 25, 2016

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: August 23, 2017 | Permit id: Pa97793-R2
2016/07/25095Barney Circle Washington Dc
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 25, 2016

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Issued | Expiration date: August 16, 2017 | Permit id: Pa97241-R2
2016/07/25095Barney Circle Washington Dc
SCORE
89
Soil boring for temporary dewatering activities at cso 018 of dc waters clean rivers project - div h. Total of thirteen (13) mud rotary borings with surface casing broken down as follows: six (6) dewatering wells at 165 feet below grade, 16 inches diameter; five (5) additional contingency dewatering wells (if needed); and two (2) monitoring wells at 1 feet below grade, 8 inches diameter. Associated with tops construction permit 97241 for lod, erosion control, mot, etc. Ground and structural monitoring program covered under tops permit 97793.
Date:  July 29, 2014

Client: Carlton Ray | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: September 30, 2015 | Permit id: Pa98423
2014/07/29089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Final restoration for dc waters clean rivers project - div h - cso 018 site at barney circle. Includes installation of sub-grade electrical vault on upper level, curb and pavement restoration, and installation of 18" odor control pipe on barney circle retaining wall. Erosion control and stormwater management measures approved by ddoe under bciv1400026. Ref tops permits 97241, 102082, 113256.
Date:  August 14, 2015

Client: Carlton Ray Dc Water | Permit type: Paving; curb & gutter(s), paving; mill and overlay, excavation; vault(s) 20x each, over head work; streetlight(s) installation, mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: January 30, 2017 | Permit id: Pa114393
2015/08/14089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Support of excavation and subsequent construction of near surface structure for dc waters clean river project div h - cso-018 site. Construction of below-grade concrete approach channel, vent chamber, and odor control vault facility, to be installed adjacent to the east bound ramp to the southeast freeway, below barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  December 14, 2015

Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: March 24, 2016 | Permit id: Pa120548
2015/12/14089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Support of excavation and subsequent construction of near surface structure for dc waters clean river project div h - cso-018 site. Construction of below-grade concrete approach channel, vent chamber, and odor control vault facility, to be installed adjacent to the east bound ramp to the southeast freeway, below barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  February 23, 2016

Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: December 30, 2016 | Permit id: Pa120548-R1
2016/02/23089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Support of excavation and subsequent construction of near surface oder control vent facility structure for dc waters clean river project div h - cso-018 site. Application also includes construction of below-grade concrete structures that are installed adjacent to the east bound ramp to the southeast freeway on lower level, and adjacent to pennsylvania ave on upper level of barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  March 8, 2016

Client: Carlton Ray Dc Water | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: April 19, 2017 | Permit id: Pa124347
2016/03/08089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Final restoration for dc waters clean rivers project - div h - cso 018 site at barney circle. Includes installation of sub-grade electrical vault on upper level, curb and pavement restoration, and installation of 18" odor control pipe on barney circle retaining wall. Erosion control and stormwater management measures approved by ddoe under bciv1400026. Ref tops permits 97241, 102082, 113256.
Date:  January 3, 2017

Client: Carlton Ray Dc Water | Permit type: Paving; curb & gutter(s), paving; mill and overlay, excavation; vault(s) 20x each, over head work; streetlight(s) installation, mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: January 30, 2018 | Permit id: Pa114393-R1
2017/01/03089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
99
Other reserved parking
Date:  August 18, 2010
Contractor: E2cr C O Siva Balu

Permit status: Expired | Expiration date: September 21, 2010 | Permit id: Pa10010756
2010/08/18099Barney Circle Washington DcE2cr C O Siva Balu
SCORE
98
Other reserved parking
Date:  March 15, 2010
Contractor: Urs Corporation

Permit status: Expired | Expiration date: April 13, 2010 | Permit id: Pa10001712
2010/03/15098Barney Circle Washington DcUrs Corporation
SCORE
89
Paving; curb & gutter(s), paving; mill and overlay, excavation; vault(s) 20x each, over head work; streetlight(s) installation, mega projects; dc water combined sewer proj
Date:  March 24, 2016

Permit status: 8 | Expiration date: January 30, 2017 | Permit id: Pa114393
2016/03/24089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Excavation; sheeting & shoring (for buildings)
Date:  January 13, 2016

Permit status: 8 | Expiration date: March 24, 2016 | Permit id: Pa120548
2016/01/13089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj
Date:  May 9, 2016

Permit status: 8 | Expiration date: April 19, 2017 | Permit id: Pa124347
2016/05/09089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj
Date:  July 25, 2016

Permit status: 9 | Expiration date: August 23, 2017 | Permit id: Pa97793-R2
2016/07/25089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Paving; curb & gutter(s), over head work; streetlight temporary removal, mega projects; dc water combined sewer proj, projections; other (exception - not to bldg code), excavation; sheeting & shoring (for buildings)
Date:  July 25, 2016

Permit status: 9 | Expiration date: August 16, 2017 | Permit id: Pa97241-R2
2016/07/25089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Support of excavation and subsequent construction of near surface oder control vent facility structure for dc waters clean river project div h - cso-018 site. Application also includes construction of below-grade concrete structures that are installed adjacent to the east bound ramp to the southeast freeway on lower level, and adjacent to pennsylvania ave on upper level of barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  March 20, 2017

Client: Carlton Ray Dc Water | Permit type: Excavation; sheeting & shoring (for buildings), excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: April 19, 2018 | Permit id: Pa124347-R1
2017/03/20089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: October 31, 2016 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: August 27, 2017 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se sw freeway and ramps, therefore mot is unnecessary.
Date:  July 29, 2015

Permit status: Permit expired | Expiration date: August 23, 2016 | Permit id: Pa97793-R1
2015/07/29089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: October 31, 2016 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: August 27, 2017 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  June 27, 2014

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: August 17, 2015 | Permit id: Pa97241
2014/06/27089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 14, 2014

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: August 24, 2015 | Permit id: Pa97793
2014/07/14089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Relocation of storm sewer infrastructure at dc waters cso 018 drop shaft site (clean rivers div h). Sewer infrastructure to be relocated to accommodate construction of cso 018 slurry wall, permitted under tops 97241. Portions of existing 18" and 27" storm pipes and one associated manhole to be demolished or capped and abandoned in place. New 18" and 27" storm pipe and two new manholes to be installed. Pavement on se/sw blvd and on-ramp to be restored upon completion of sewer relocations. All work to take place in fall 2014, prior to re-opening of se/sw blvd. Mot approved under tops 97241. Please note: mot for re-opened boulevard will not come into effect under this permit. This work must be completed prior to re-opening of se/sw boulevard.
Date:  September 30, 2014

Client: Carlton Ray Dc Water | Permit type: Excavation; manhole installation, excavation; manhole removal/abandonment, mega projects; dc water combined sewer proj, excavation; repair storm service lateral, paving; mill and overlay | Permit status: Permit expired | Expiration date: November 12, 2015 | Permit id: Pa100818
2014/09/30089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Revision to construction permit #97241 to reflect new staging area and mot for cso 018 shaft site for dc clean rivers project - division h (anacostia river tunnel). Revised staging area & mot will be implemented per ddot instruction at coordination meeting of 9/23/14 (notes attached). Revisions to go into effect upon re-opening of se/sw boulevard at end of 2014. Contractor to maintain two open lanes on westbound on-ramp to se/sw blvd, and two open lanes on eastbound off-ramp from the boulevard to pennsylvania ave. Primary site access to/from lower staging area will be via rfk stadium access road under barney circle. Flagger operation to be used for any trucks entering eastbound roadway from upper or lower staging area.
Date:  October 28, 2014

Client: Carlton Ray Dc Water | Permit type: Mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: December 24, 2015 | Permit id: Pa102082
2014/10/28089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 21, 2015

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: August 16, 2016 | Permit id: Pa97241-R1
2015/07/21089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 27, 2015

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: August 23, 2016 | Permit id: Pa97793-R1
2015/07/27089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se/sw freeway and ramps, therefore mot is unnecessary.
Date:  July 25, 2016

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Permit expired | Expiration date: August 23, 2017 | Permit id: Pa97793-R2
2016/07/25089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se/sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 25, 2016

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: August 16, 2017 | Permit id: Pa97241-R2
2016/07/25089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 17, 2017

Client: Carlton Ray | Permit type: Paving; curb & gutter | Permit status: Issued | Expiration date: August 16, 2018 | Permit id: Pa97241-R3
2017/07/17089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se sw freeway and ramps, therefore mot is unnecessary.
Date:  July 27, 2017

Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single), mega projects; dc water combined sewer proj | Permit status: Issued | Expiration date: December 13, 2017 | Permit id: Pa97793-R3
2017/07/27089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  September 3, 2014

Permit status: Permit expired | Expiration date: August 17, 2015 | Permit id: Pa97241
2014/09/03089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se sw freeway and ramps, therefore mot is unnecessary.
Date:  August 25, 2014

Permit status: Permit expired | Expiration date: August 24, 2015 | Permit id: Pa97793
2014/08/25089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Soil boring for temporary dewatering activities at cso 018 of dc waters clean rivers project - div h. Total of thirteen (13) mud rotary borings with surface casing broken down as follows: six (6) dewatering wells at 165 feet below grade, 16 inches diameter; five (5) additional contingency dewatering wells (if needed); and two (2) monitoring wells at 1 feet below grade, 8 inches diameter. Associated with tops construction permit 97241 for lod, erosion control, mot, etc. Ground and structural monitoring program covered under tops permit 97793.
Date:  January 26, 2015

Permit status: Permit expired | Expiration date: September 30, 2015 | Permit id: Pa98423
2015/01/26089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Relocation of storm sewer infrastructure at dc waters cso 018 drop shaft site (clean rivers div h). Sewer infrastructure to be relocated to accommodate construction of cso 018 slurry wall, permitted under tops 97241. Portions of existing 18" and 27" storm pipes and one associated manhole to be demolished or capped and abandoned in place. New 18" and 27" storm pipe and two new manholes to be installed. Pavement on se sw blvd and on-ramp to be restored upon completion of sewer relocations. All work to take place in fall 2014, prior to re-opening of se sw blvd. Mot approved under tops 97241. Please note: mot for re-opened boulevard will not come into effect under this permit. This work must be completed prior to re-opening of se sw boulevard.
Date:  October 27, 2014

Permit status: Permit expired | Expiration date: November 12, 2015 | Permit id: Pa100818
2014/10/27089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Revision to construction permit #97241 to reflect new staging area and mot for cso 018 shaft site for dc clean rivers project - division h (anacostia river tunnel). Revised staging area & mot will be implemented per ddot instruction at coordination meeting of 9 23 14 (notes attached). Revisions to go into effect upon re-opening of se sw boulevard at end of 2014. Contractor to maintain two open lanes on westbound on-ramp to se sw blvd, and two open lanes on eastbound off-ramp from the boulevard to pennsylvania ave. Primary site access to from lower staging area will be via rfk stadium access road under barney circle. Flagger operation to be used for any trucks entering eastbound roadway from upper or lower staging area.
Date:  November 19, 2014

Permit status: Permit expired | Expiration date: December 24, 2015 | Permit id: Pa102082
2014/11/19089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 23, 2015

Permit status: Permit expired | Expiration date: August 16, 2016 | Permit id: Pa97241-R1
2015/07/23089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Final restoration for dc waters clean rivers project - div h - cso 018 site at barney circle. Includes installation of sub-grade electrical vault on upper level, curb and pavement restoration, and installation of 18" odor control pipe on barney circle retaining wall. Erosion control and stormwater management measures approved by ddoe under bciv1400026. Ref tops permits 97241, 102082, 113256.
Date:  January 5, 2017

Permit status: Issued | Expiration date: January 30, 2018 | Permit id: Pa114393-R1
2017/01/05089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: October 31, 2016 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: August 27, 2017 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
90
Construction staging area
Date:  September 8, 2017

Permit status: Issued | Expiration date: October 15, 2017 | Permit id: Pa10393185-R1
2017/09/08090Barney Circle Washington DcCsx Transportation, Inc
SCORE
89
Support of excavation and subsequent construction of near surface oder control vent facility structure for dc waters clean river project div h - cso-018 site. Application also includes construction of below-grade concrete structures that are installed adjacent to the east bound ramp to the southeast freeway on lower level, and adjacent to pennsylvania ave on upper level of barney circle. No change to existing ddoe-approved site plan or ddot-approved mot measures. Construction impact assessment report 4a and 4b submitted to ddot by dc water under separate cover.
Date:  March 21, 2017

Permit status: Issued | Expiration date: April 19, 2018 | Permit id: Pa124347-R1
2017/03/21089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Establishment of construction staging area in public space for construction of cso 018 slurry wall, part of dc waters anacostia river tunnel project (dc clean rivers div h). Site will occupy grassy area on southwest side of barney circle (upper level), and grassy infield between westbound on-ramp and westbound travel lanes of se sw freeway (lower level). Slurry wall support of excavation plans included for ddot review: structural slurry wall of 36" thick 5000psi reinforced concrete, to support excavation of 36. 5 diameter shaft to 125 below ground surface. Site work includes: upper level: two temporary curb cuts for construction entrances, site will not occupy roadway or sidewalk. Lower level: three light poles to be removed during construction, two sections of curb to be cut along westbound freeway. Slurry wall will be constructed entirely below grade on lower level. Slurry wall footprint encroaches into shoulder of westbound freeway. Portions of freeway and ramps will be occupied by c
Date:  July 20, 2017

Permit status: Issued | Expiration date: August 16, 2018 | Permit id: Pa97241-R3
2017/07/20089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Installation of geotechnical instrumentation in public space for cso 018 of the anacostia river tunnel (dc clean rivers div h). Work to take place in staging area below and west of barney circle, including in the on-ramp and in the freeway. Proposed work includes the following: the drilling of sixteen (16) borings which includes: seven (7) inclinometers, five (5) extensometers, and four (4) piezometers, to depths ranging from feet to 164 feet below ground surface, boring diameter 6. 25". Vacuum excavation of three (3) utility monitoring points to depths of 3 to 4 feet below ground surface. Installation of twenty-one (21) surface settlement monitoring points. Proposed work to begin in august 2014 and will be coordinated with 11th street bridge contractor who is currently occupying this site area. All instruments will be installed prior to re-opening of se sw freeway and ramps, therefore mot is unnecessary.
Date:  August 1, 2017

Permit status: Issued | Expiration date: December 13, 2017 | Permit id: Pa97793-R3
2017/08/01089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
89
Construction staging area
Date:  April 29, 2015

Permit status: Permit expired | Expiration date: May 29, 2015 | Permit id: Pa10184825
2015/04/29089Barney Circle Washington DcImpregilohealyparsons Jv
SCORE
56
Construction staging area
Date:  November 5, 2015
Contractor: Pete Thomsen

Permit status: Permit expired | Expiration date: December 31, 2015 | Permit id: Pa10217188
2015/11/05056Barney Circle Washington DcPete Thomsen
SCORE
98
Construction staging area
Date:  February 23, 2016
Contractor: Thanh Nguyen

Permit status: Permit expired | Expiration date: March 2, 2016 | Permit id: Pa10230335
2016/02/23098Barney Circle Washington DcThanh Nguyen
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: October 31, 2016 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
90
Construction staging area

Permit status: Rejected | Expiration date: August 27, 2017 | Permit id: 0
090Barney Circle Washington DcCsx Transportation, Inc
SCORE
90
Construction staging area
Date:  May 24, 2017

Permit status: Permit expired | Expiration date: September 27, 2017 | Permit id: Pa10393185
2017/05/24090Barney Circle Washington DcCsx Transportation, Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.