Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Tear-off & reroof of sfd, 13 squares on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Date: March 24, 2010 Contractor: Excel Roofing Inc Applicant: Excel Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: May 24, 2011 | Current use: Single family d | |||||
SCORE 100 Installation of a 3. 12 kw solar array, flush mounted and grid tied Date: February 29, 2012 Contractor: Solarcity Corp Client: Brett Hall, Hall | Applicant: Solarcity Corp | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 24, 2012 | Current use: Single family d | |||||
SCORE 100 Installation of a 3. 12 kw solar array, flush mounted and grid tied Client: Brett Hall | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 24, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00838 | |||||
SCORE 100 Tear-off & reroof of sfd, 13 squares on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Permit type: Roofing | Permit status: Cmp | Completion date: May 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00998 | |||||
SCORE 95 Installation of new 13 seer, 2 ton ac unit at ne corner of single family dwelling. Condensing unit to be installed at least two feet above grade to keep the unit out of the 1 year flood (approx. Two feet deep at dwelling). Client: Brett Hall | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: April 17, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-01462 |