Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 74 Roof mount residential solar pv for existing sfd 11 7 13: plan change; adding electrical upgrade to 125 amps... M1a 12 3 13: plan change; remove 100a subpanel-solar only go directly to main panel de-rated... Md per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 28, 2013 Contractor: Jim Lawson Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: December 9, 2013 | Permit id: Pds2013-Resalt- | |||||
Roof mount residential solar pv for existing sfd 11/7/13 plan change; adding electrical upgrade to 125 amps... M1a 12/3/13 plan change; remove 100a subpanel-solar only go directly to main panel de-rated... Md per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 28, 2013 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 9, 2013 | Permit id: Pds2013-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd 11 7 13 plan change; adding electrical upgrade to 125 amps... M1a 12 3 13 plan change; remove 100a subpanel-solar only go directly to main panel de-rated... Md per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: October 28, 2013 Contractor: Solar Power Solutions Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 9, 2013 | Permit id: Pds2013-Resalt- | |||||
Final Date: December 5, 2013 Permit status: Pass | Permit id: Pds2013-Resalt- |