Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 Ti humble abode; occupancy, accessibilty upgrade & change out exterior doors. Otc dr & use by erin Date: September 15, 2014 Contractor: Picchi John Permit status: Finaled | Permit id: B14-2724 | |||||
SCORE 79 Accessibilty upgrade; barrier removal, remodel two toilets, reconstruct access, landing and parking. Date: July 7, 2014 Contractor: Picchi John Permit status: Finaled | Permit id: B14-2440 | |||||
SCORE 79 Remove two exisiting roll-up doors and replace with one larger roll-up door. (17 x 20), otc dr by susie murray Date: August 19, 2014 Contractor: Picchi John Permit status: Finaled | Permit id: B14-2643 | |||||
SCORE 56 Tenant improvements for refuge wines - new storage tanks, remove and replace trench drains and install new aco drains for winery production. See zc14-0245.,see b14-24 and b14-2643 for landlord improvements related to accessibility for this space/ Permit type: Pool/spa | Permit status: Finaled | Permit id: B14-2955 | |||||
SCORE 79 Tenant improvement for studio gray - dance studio (b occupancy type) see cup11-086 Date: May 8, 2012 Contractor: Picchi John Permit status: Finaled | Permit id: B12-0556 | |||||
SCORE 89 Cooperage brewing tenant improvements for beer production and tasting Date: March 17, 2015 Contractor: Kadello And Larsen Architectural Designs Permit status: Issued | Permit id: B14-4671 |