Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 28 built up re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material built up proposed roofing material built up rolled roofing manufacturer owens corning brand and model color (if cool roof required) brown built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) low slope2 12 required building inspector field verification (if applicable) low slope 2 12 note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: June 21, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: January 3, 2018 Contractor: Solar Tech Energy Systems Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2018-Resalt- | |||||
Permit renewal Date: June 6, 2017 Permit status: Done | Permit id: Pds1987-C-87024 |